Energy Department
NOTIFICATION
Jaipur, August 17, 2026
No.F.20(40) Energy/2025/04269 :-The State Government, vide Notification No. F.20(62) Energy/2024 dated 04.12.2024, issued the Rajasthan Integrated Clean Energy Policy, 2024, which was subsequently amended vide Notification dated 25.07.2025. In this connection, the following clauses of the aforesaid Policy are hereby inserted/replaced as follows, with immediate effect: 1. New Clause 15.13 (Section-A) inserted below clause 15.12:
The provisions of Clause 15.11 shall mutatis mutandis apply to an RE Park/Solar Park for transfer of the entire registered capacity of such park.
2. Clause 16.2.6 (Section-A) replaced with following:
The land may be allotted for the establishment of Renewable Energy Projects/Renewable Energy Parks/Green Hydrogen Projects/Green Hydrogen Parks with or without storage having capacity of not less than 1000 MW, and in cases where Developers/Power Producers do not presently have connectivity from the Central Transmission Utility (CTU)/State Transmission Utility (STU) for the land identified in accordance with the provisions of prevailing landrevenue rules. RREC will make recommendation to Revenue Department forallotment of land for establishing RE/Green HydrogenProjects/Parks etc. on deposition of Land Security @ Rs. 1 Lac/MWin form of DD/RTGS or through E-grass/IFMS 3.0 of RevenueManagement System in designated Budget Head in favour of StateGovernment. The land so recommended shall not be more than themaximum limit of land as prescribed under clause 16.3 (section-A)of this policy. Revenue Department will issue necessary allotment order for rightto use of the land as an advance possession, as per applicableprovision of Rajasthan Land Revenue (Allotment of land for settingup of Power Plant based on Renewable Energy Sources) Rules,2007 as amended from time to time. The Security Deposit (SD) deposited with the State Governmentshall be refunded to the Developer upon commissioning of theproject, in proportion भाग 7 राजस्थान राज-पत्र, अगस्त 25, 2026 269 tothe capacity commissioned, based on therecommendation of RRECL by Revenue Department as per the rules. The Developers/Power Producers who have already applied and/ordeposited the Security Deposit with RREC as per the EnergyDepartment, GoR Notification dated 25.07.2025 shall have theoption to migrate their application for allotment of land under theseprovisions within two months, along with the deposition of theapplicable Security Deposit, if not deposited from the effective dateof notification of this policy provision. In case of withdrawal ofapplication towards set apart of the land by Developer/PowerProducers, the SD will be refunded to Developer/Power Producerby RREC. RREC will send the proposal accordingly to Revenue Department. Any violation of the provisions of this policy & Rajasthan LandRevenue (Allotment of land for setting up of Power Plant based onRenewable Energy Sources) Rules, 2007 shall lead to withdrawal ofallotment of the land and also forfeiture of Land Security amount.
3. Clause 16.3 (Section-A) replaced with following
For setting up of Power Plants based on different technologies, maximum land area which can be allotted to the Developer/ Power Producer will be as under:
| S. N o . | Technology | Maximum land area for Solar Plant | For Wind-Solar Hybrid Plant |
| i SPV on Crystalline Technology. | 2.0Hect./MW | Land shall be allotted according to individual capacity of solar and wind component of the project subject to condition that maximum ceiling limit of overall land for Hybrid project will be 2.5 Ha/MW of declared capacity of Hybrid Project. | |
| ii SPV on Crystalline Technology with tracker. | 2.0Hect./MW | ||
| iii SPV on Thin Film/Amorphous Technology with or without tracker. | 2.0 Hect./MW | ||
| iv Solar Thermal (CSP)- Parabolic Trough /Tower/Other Technology with and without storage | a) Up to PLF of 21%: 3.0 Hect./MW b) For every 1% increase in PLF, 0.15 Hect./MW additional land will be allotted. | ||
| v Maximum land area for Wind Plant | 2.0 Hect/MW |
Provided that 10% of the total area of land allotted shall be reserved bythe allottee for the purpose of tree plantation.
Note: For power projects with storage system, additional land will beallotted as per the rules prescribed by the Revenue Department,GoR.
New Clause 16.4.5 Stamp Duty (Section-A) inserted below clause 16.4.4.
The applicable stamp duty on execution of lease deed/sub lease deed etc.will be payable by Developer/Power Producer as per prevalent Act/Rules.
4. Clause 6.3 (Section-B) replaced with following:
In order to encourage storage capacity to supply reliable power, newRE projects integrated with BESS at STU/Discom Network under with minimum capacity of X/2 MWh (where "X" is the installed capacity of RE project) shall be exempted 50% from registration charges for the RE capacity and on installation of BESS beyond X/2 MWh capacity, registration charges shall be exempted up to 100% on pro rata basis corresponding to the storage capacity added.
5. Clause 8(d) (Section-B) replaced with following:
Each Developer of PSP will deposit non-refundable registration charge of Rs. 10 Lac per project with RREC. BESS (Stand alone or integrated with RE) will deposit following registration charges:
| BESS size ≤ 2 MWh | Rs. 5,000/- |
| BESS size > 2 MWh & ≤100 MWh | Rs. 10,000 per MWh |
| BESS size > 100 MWh | Rs. 10 Lac per project |
However, the aforesaid registration charges will not be applicable only for BESS required to be installed with RE Project as per clause 6.4 (section-B).
6. Clause 1.12 (iii) (Section-E) replaced with following:
The Power Evacuation facilities granted by DISCOMs/RVPN as per the grid connectivity procedure/guidelines of DISCOMs/RVPN, will be utilized by Developers/ Power Producers within 2 years from the date of approval, otherwise power evacuation approval may be allocated to otherDevelopers/Power Producers on priority basis.
By Order,
Manoj Kumar Mittal, Dy. Secretary to Government.