R.N.I.No.TELMUL/ 2016/73158.
[Price: 10-00.
HSE No. 1051/2017-19.
GOVERNMENTOFTELANGAR
RIGHT TO INFORMATION తెలంగాణ రాజ పత్రము
THE TELANGANA GAZETTE
PART- I EXTRAORDINARY
PUBLISHED BY AUTHORITY
No. 58]
HYDERABAD, FRIDAY, MARCH 8 , 2019 .
NOTIFICATIONS BY GOVERNMENT
LABOUR , EMPLOYMENT, TRAINING & FACTORIES DEPARTMENT
(Labour)
BOILERS DEPARTMENT BUSINESS REFORM ACTION PLAN , 2019 INTRODUCTION OF THIRD PARTY INSPECTION & CERTIFICATION FOR INSTALLED BOILERS DURING USE IN THE TELANGANA STATE BY BOILER OPERATION ENGINEER (BOE ) TO IMPROVE EASE OF DOING BUSINESS IN THE STATE .
[G.O.Ms.No.11, Labour Employment Training & Factories (Labour), 7th March, 2019.] In exercise of the power conferred by sub section (3 ) of the section 34 of the Boilers Act, 1923 ( Central Act No. 5 of 1923), the Government of Telangana hereby decides to introduce the Third party inspection and certification forboilers during use which have been installed or which will be installed in future by granting exemption from the operation of the sub secctions (3 ) , (4), (5) & (6) of section 8 of the Boilers Act, 1923 by authorizing the Boiler OperationEngineer (BOE) of the Boiler Operation Engineers Rules, 2011 having the following qualification.
(a) Graduate in Mechanical / Production / Power Plant / Metallurgical engineering from a recognized institution.
(b) Minimum 5 years of experience in the field related to boilers.
toinspect the boilers and issue a certificate for such period as prescribed by regulations subject to the procedure and conditions prescribed here under namely: -
1) When a certificate for use ofthe installed boiler ceases to be in force atleast ( 15) days before expirey of certificate, the owner of boiler may apply to a Boiler Operation Engineer ( BOE) of Boiler Operation Engineers rules 2011 with the qualification mentioned above for renewal thereof for such period as may be prescribed by Regulations to carry out the renewal inspection & certification of boilers during use in Telangana State. After applying to a third party the owner of boiler has to inform the Director of Boilers through boilers website i.e.www.tsboilers.cgg.gov.in or Telangana single window website i.e.,www.ipass.telangana.gov.in along with the qualification certificates ofthe Boiler Operation Engineer bydulypaying the boiler renewal fee (refer Annexure IV) . Director of Boilers shall scrutinize the qualification ofBoiler Operation Engineer and approve application within three working days of application with the information to the concerned area Inspector.
[1 ]
G- 790/1 2
TELANGANA GAZETTE EXTRAORDINARY
[Part-I 2) On receipt of an application the Boiler Operation Engineer with the qualification indicated above shall withinfifteendays from the date of such receipt, inspect the above boiler in such manner as prescribed by regulations.
3) After the completion of inspection the Boiler Operation Engineer shall issue an inspection report as per Annexure- II. And ifhe is-
(a) satisfied that the boiler and the boiler components attached there to are in good condition he shall issueacertificate as per Annexure - I for the maximum working pressure allowed in previous certificate for such period as may be prescribed by regulations .
(b) ofthe opinion that the boiler or boiler component, or both does not conform to the standards prescribed by regulations refuse to issue such certificate and shall issue a notice as per Annexure III that the boiler is not fit for use further with the reasons recorded in writing, following which the owner ofthe Boiler shall immediately stop the operation of the Boiler.
Provided that the Boiler Operation Engineer shall within forty eight hours of making the inspection inform the owner of the boiler any defect in his opinion and repairs to the carried out and shall forthwith report the case to the Director of Boilers Telangana State.
Provided that the owner of the Boiler shall obtain the inspection report as per Annexure - II and certificate as per Annexure - I or notice as per Annexure- III as the case may be well before the expiry of the previous certificate.
4) The Owner of Boiler should submit the Inspection report and Certificate ofBoiler / Notice ofBoiler not fit for use along with proposed repairs to the Director of Boilers through boilers website i.e. , tsboilers.cgg.gov.in ( or) single window website www.ipass.telangana.gov.in within 7 days from thedate of inspection.
5) In case of repairs , the owner of boiler has to follow the section 4F of the Boilers Act , 1923 and regulations 392 & 392A of Indian Boiler Regulations, 1950 and Rules framed there under.
6) In order to take the Aging effect on Boilers, Boiler Operation Engineer shall follow Regulation 391 A ofIndianBoiler Regulations , 1950 while giving inspection report as per Annexure - II and while issuing certificate as per Annexure - I. If any change in working pressure of boiler is required as per Indian BoilerRegulations, 1950 , then the Certificate of Boiler shall be submitted for counter signature to the Director ofBoilers , Telangana State, Hyderabad.
7) If any accident occurs to Boiler or connectedboiler component , the owner or person in charge of boilershall report the same in writing to the concerned Boiler Inspector within 24 hours of the accident as per provisions of the Boilers Act , 1923 and Rules & Regulaions framed under theAct.
8) Itwill be responsibility of Owner of the Boiler to run and maintain the Boiler as per provisions of the BoilersAct, 1923 and rules & regulations framed there under the Act . Owner shall also be responsible forany violation of the provisions of the said Act, rules and regulations framed there under and liable forpunishment as per the provisions of the Boilers Act, 1923.
9) The Boiler Operation Engineer shall follow the provisions of the Boilers Act, 1923 , Rules & Regulations framedthere under for inspection and certification of installed boilers . He shall be responsible for any act of omission committed against the provision of said Act, Rules & Regulations and liable for punishment as per the provisions of the Boilers Act , 1923.
10) This notification shall be applicable to such boilers having the safe guard system for protection against overpressure, low water level , flame failure etc for prevention of accidents as per the provisions of theBoilersAct, 1923 , Rules and Regulations framed there under.
11) This Third Party Inspection & Certification of installed boilers is optional for owner of Boiler. Boiler owner can apply either to Boiler Operation Engineer as per this notification or to Telangana Government Boiler Inspector or to competent person as per Indian Boiler Regulations , 1950 for inspection and certification of installed boilers and connected boiler components during use .
noitssiteas to wal TELANGANA GAZETTE EXTRAORDINARY
3 March 8, 2019 ]
Annexures
ANNEXURE - I
(CERTIFICATE FOR USE OF A BOILER)
CertificateNo:
Registry Number of Boiler:
Type ofBoiler:
Sq.Mtrs
Boiler Rating:
Kg/Cm2
Maximum allowable Working Pressure:
Place and year of manufacture:
in Kg/hr
Maximum Continuous Evaporation:
Name& address of Owner:
Boilersituated at:
Name and address of " Boiler Operation Engineer" :
CertificateNo of " Boiler Operation Engineer":
Details of previous repairs
Thorough examination on
to Kg/Cm2
Hydraulically tested on
Ihave inspected the above boiler and connected boiler components at the request of the boiler owner as required under Notification No. dated of Government of Telangana and I hereby certify that the above described boiler is permitted by me under the provisions of Notification No. dated ofGovernment of Telangana to be worked at a Maximum pressure of Kilogram per sq centimeters for the period from to
The loading of the safety valve is not to exceed Kilogram per sq centimenters Place:
SignatureofBoiler Operation Engineer (BOE) Date:
4
TELANGANA GAZETTE EXTRAORDINARY
[Part-1
ANNEXURE II
ANNUAL INSPECTION REPORT FOR BOILER
dated:
Inspection Report No:
1. Name and address of the factory :
2. Name and address of the owner
3. Nature ofbusiness of factory
4. Registry Number ofBoiler
5. Type of Boiler:
6. Place & Year of Manufacture
7. Boiler Rating/ Heating Surface ( square meters) :
8. Maximum allowed working Pressure: Kg/Cm²
9. Briefdescription ofboiler
10. Whether fired or waste heat boiler :
11. Expiry date of previous certificate:
12. Details ofboiler tripping for last 1 year with reasons thereof:
13. Quality of Boiler feed water (enclose test Reports) :
14. Number, type and condition of feed pumps:-
15. Number, type and condition of safety valves:
16. Number and condition of water Level gauges:
17. Condition of water level controller/mobrey:
18. Condition ofValves :
19. Condition of Steam pressure gauge :
20. Condition offusible plugs:
21. Open inspection (Thorough Examination) conducted on:
22. Condition: of pressure parts on water side:
23. Condition of pressure parts on fire side:
24. Hydraulically tested on date: to Kg/Cm²
25. Condition ofboiler upon hydraulic test:
26. Repairs Proposed (if any):
27. Particulars of BOE / Boiler Attendants : (Enclose copies of certificates)
28. Registration number of steam pipe line:
29. Length of Steam pipe line:
30. Condition of SPL ( including drains , steam traps & expansion below); -
31. Remarks/Suggestions: -
I have inspected the above boiler as required under notificationNo. ofTelangana and the boiler is fit / not fit for further use . dated ofGovernment Place:
Signature ofBoiler Operation Engineer (BOE) :
Dated:
Name of BOE :
Address 5 TELANGANA GAZETTE EXTRAORDINARY
March8, 2019]
ANNEXURE - III СЛАДОСТТHAY 3.37
NOTICE OF BOILER NOT FIT FOR USE
Dated:
ReportNo.:
Registry Number of Boiler
Name & adress of Owner :
Boiler situated at:
Name and address of "Boiler Operation Engineer":
CertificateNo of " Boiler Operation Engineer":
Ihave inspected the above boiler and connected boiler components on owner as required under Notification No. Dated thatit is not fit for use due to following reasons mentionedbelow: atthe request of the boiler ofGovernment of Telangana and is of opinion TheBoiler should not be steamed till you hear from Director of Boilers , Telangana State .
Place:
Signature ofBoiler Operation Engineer (BOE) Copy submitted to the Director of Boilers . Telangana State . Hyderabad.
G-790/ 2 6
TELANGANA GAZETTE EXTRAORDINARY
[Part-1
ANNEXURE - IV
(FEE PARTICULARS OF BOILER AND BOILER COMPONENTS)
BOILER RENEWAL FEE TO (Witheffect from 23.06.1997)
As per GO.Ms. No. 56, dated : 23.06.1997 of Energy (CC- Boilers) Department.
Fees in Rs .
Description
SI. No.
1,000 1. ForBoiler Rating not exceeding 25 Sq .Mtrs .
2.
1,500 ForBoiler Rating Exceeding 25 Sq . Mtrs . but not Exceeding 50 Sq. Mtrs .
2,000 3.
ForBoiler Rating Exceeding 50 Sq. Mtrs . but not Exceeding 75 Sq . Mtrs.
4.
2,500 ForBoiler Rating Exceeding 75 Sq. Mtrs . but not Exceeding 100 Sq. Mtrs .
5.
4,000 ForBoiler Rating Exceeding 100 Sq . Mtrs . but not Exceeding 150 Sq. Mtrs .
5,000 6. ForBoiler Rating Exceeding 150 Sq. Mtrs . but not Exceeding 200 Sq . Mtrs .
7.
7,500 ForBoiler Rating Exceeding 200 Sq . Mtrs . but not Exceeding 300 Sq . Mtrs .
12,000 8.
ForBoilerRating Exceeding 300 Sq . Mtrs , but not Exceeding 500 Sq. Mtrs .
16,000 9. ForBoiler Rating Exceeding 500 Sq . Mtrs . but not Exceeding 1000 Sq. Mtrs .
25,000 10. ForBoiler Rating Exceeding 1000 Sq . Mtrs . but not Exceeding 2000 Sq . Mtrs .
46,000 11. ForBoilerRating Exceeding 2000 Sq . Mtrs . but not Exceeding 4000 Sq . Mtrs .
Above 4000 Sq. Mtrs . every 100 Sq . Mtrs Or part thereof then additional fee of Rs 250 /- shallbe charged.
STEAM PIPE LINE (BOILER COMPONENT) RENEWAL FEE
(Witheffectfrom 23.06.1997)
AS per GO.Ms.No. 56, dated: 23.06.1997 of Energy (CC- Boilers) Department .
Rs.300.00 For a length not exceeding 100 M
Rs.450.00 Fora length exceeding 100M but not exceeding 300 M
Rs.750.00 Fora length exceeding 300M but not exceeding 500 M
Rs.1,300.00 Fora length exceeding 500M but not exceeding 1000 M
Rs.1,500.00 Fora length exceeding 1000M but not exceeding 2000 M
Rs.2,500.00 For a length exceeding 2000M but not exceeding 3000M
Forevery additional 1000M or part thereof in exces of 3000 M .....Rs.500.00
Dr. SHASHANK GOEL ,
Principal Secretary to Government. Printed and Published by the Commissioner of Printing. Govt . of Telangana , at Govt . Central Press, Chanchalguda, Hyderabad.