The Electricity Department, Government of Goa, filed its petition for Annual Performance Review of FY 2016-17 & FY 2017-18, Retail supply of Tariff for FY 2018-19 and True-up for FY 2013-14, according to the Regulations and as per the procedures outlined in section 61, 62 & 64 of the Electricity Act, 2003, before the Hon'ble Joint Electricity Regulatory Commission for the States of Goa and Union Territories.
In exercise of the powers conferred under various sections of the Electricity Act, 2003 and all powers enabling therein, on behalf of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories, has issued the tariff order dated 28th March, 2018 which is attached herewith for Determina- tion of Tariff for FY 2018-19 with effective from 1st April, 2018 and shall remain valid till issuance of further orders of the Commission, In consequence to the above Tariff Order, the State Government is intending to provide subsidy to the following categories in order to give relief against the Tariff hike:
(1) LT Domestic Consumers who is having monthly consumption only upto 200 Units.
(2) LT Agriculture Pump Sets/Irrigation.
Orders in regard to providing above subsidy is in process and once the same is issued the subsidy granted will be credited to the respective consumers starting from the consumption from 1st April, 2018 in the subsequent billing months.
The above is hereby brought to the notice
of the public.
By order and in the name of the Governor
of Goa.
N. N. Reddy, Chief Electrical Engineer &
ex officio Additional Secretary (Power).
Panaji, 17th April, 2018.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018JOINT ELECTRICITY REGULATORY COMMISSION For the State of Goa and Union Territories, 2nd Floor, HSIIDC Office Complex, Vanijya Nikunj, Udyog Vihar, Phase-V, Gurugram-122016 (Haryana) Phone: 0124-2875302 Fax: 0124-2342853 Website: www.jercuts.gov.in Email: [email protected]
__
TARIFF ORDER
True-up of the FY 2013-14 and Approval of Aggregate Revenue Requirement (ARR) and Determination of Retail Tariff for the FY 2018-19
Petition No. 249/2017
For
Electricity Department, Government of Goa (EDG)
28th March, 2018
_____
Table of Contents
1. Chapter 1: Introduction
55
1.1. About Joint Electricity Regulatory Commission (JERC) 1.2. About Electricity Department, Government of Goa (EDG) 1.3. JERC Tariff Regulations, 2009 1.4. Multi-Year Distribution Tariff Regulations, 2014 1.5. Filing and Admission of the Present Petition 1.6. Interaction with the Petitioner 1.7. Notice for Public Hearing 1.8. Public Hearing
55 55 55 56 56 56 57 58
2. Chapter 2: Summary of Suggestions/Objections received, Response from the Petitioner and
the Commission's Views
58 2.1. Regulatory Process 58 2.2. Suggestions/Objections, Response of the Petitioner and Commission's Comments 58
3. Chapter 3: True-up of FY 2013-14 3.1. Background 3.2. Energy Sales 3.3. Inter-State Transmission loss 3.4. Intra-State Transmission & Distribution (T&D) loss 3.5. Power Purchase Quantum & Cost 3.6. Renewable Purchase Obligation (RPO) 3.7. Energy Balance 3.8. Operation & Maintenance (O&M) Expenses 3.9. Capitalisation
64 64 64 65 66 67 70 70 71 74 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 3.10. Depreciation 3.11. Interest and Finance Charges 3.12. Return on Capital Base 3.13. Interest on Security Deposits 3.14. Interest on Working Capital 3.15. Provision for Bad & Doubtful Debts 3.16. Non-Tariff Income (NTI) 3.17. Revenue from Sale of Surplus Power 3.18. Aggregate Revenue Requirement (ARR) 3.19. Revenue at Existing Retail Tariff 3.20. Standalone Revenue Gap/Surplus
75 77 78 79 80 81 81 82 82 83 85
85 4. Chapter 4: True-up of the FY 2014-15, FY 2015-16 and FY 2016-17 4.1. Applicable provisions of JERC for the State of Goa and Union Territories (Terms and Conditions for Determination of Tariff) Regulations, 2009 85 4.2. Approach for the True-up of the FY 2014-15 and FY 2015-16 and FY 2016-17 86
5. Chapter 5: Annual Performance Review of FY 2017-18 5.1. Background 5.2. Approach for the Review for the FY 2017-18
87 87 87
6. Chapter 6: Determination of Aggregate Revenue Requirement for the FY 2018-19 88 88 6.1. Background 6.2. Approach for determination of ARR for the FY 2018-19 89 6.3. Projection of Number of Consumers, Connected Load and Energy Sales 89 6.4. Energy Savings under Domestic Efficiency Lamp Programme (DELP) 90 90 6.5. Inter-State Transmission Loss 91 6.6. Intra-State Transmission and Distribution (T&D) Loss 91 6.7. Power Purchase Quantum & Cost 95 6.8. Renewable Purchase Obligation (RPO) 96 6.9. Energy Balance 97 6.10. Operation & Maintenance (O&M) Expenses 97 6.11. Capitalisation 97 6.12. Depreciation 98 6.13. Interest and Finance Charges 98 6.14. Return on Equity (RoE) 99 6.15. Interest on Security Deposits 99 6.16. Demand Side Management (DSM) Expenses 100 6.17. Interest on Working Capital 101 6.18. Non-Tariff Income (NTI) 101 6.19. Aggregate Revenue Requirement (ARR) 101 6.20. Revenue at Existing Retail Tariff 104 6.21. Standalone Revenue Gap/Surplus
7. Chapter 7: Tariff Principles and Design 7.1. Overall Approach 7.2. Applicable Regulations 7.3. Revenue Gap/Surplus at Existing Tariff 7.4. Treatment of the Revenue Gap/Surplus and Tariff Design
105 105 105 107 107
8. Chapter 8. Open Access Charges for the FY 2018-19 8.1. Wheeling Charges 8.2. Additional Surcharge 8.3. Cross-Subsidy Surcharge
115 115 117 119
9. Chapter 9: Tariff Schedule 9.1. Tariff Schedule 9.2. Applicability
121 121 123 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 9.3. General Terms and Conditions 9.4. Schedule of Miscellaneous Charges
131 135
10. Chapter 10. Fuel and Power Purchase Adjustment Mechanism 10.1. Legal Provisions 10.2. Existing formula 10.3. Need to review the existing mechanism 10.4. New formula
138 138 139 142 144
11. Chapter 11: Directives 11.1. Directives continued in this Order 11.2. New Directives issued in this Order 11.3. Directives dropped in this Order
148 148 154 154
Annexures Annexure 1: Public Notices published by the Commission Annexure 2: Public Notices published by the Petitioner Annexure 3: List of Stakeholders
155 155 160 163
List of Tables
Table 1: Timelines w.r.t the Petition filed by EDG
54 Table 2: Timelines of the interaction with the Petitioner
57 Table 3: Details of Public Notices published by the Commission
57 Table 4: Details of Public Notices published by the Petitioner
57 Table 5: Energy Sales (MU) trued-up by the Commission
65 Table 6: Inter-State transmission loss (%)
66 Table 7: Intra-State distribution loss (%)
66 Table 8: Power Purchase cost submitted by the Petitioner (In Rs. Cr)
67 Table 9: Power Purchase Quantum (MU) and cost (Rs Cr) approved by the Commission 69 Table 10: Energy Balance (MU) submitted by Petitioner
70 Table 11: Energy Balance (MU) approved by Commission at State Periphery 71 Table 12: Employee Expenses submitted by the Petitioner (In Rs. Cr)
72 Table 13: Employee Expenses approved by Commission (In Rs. Cr)
72 Table 14: A&G Expenses submitted by Petitioner (In Rs. Cr)
73 Table 15: A&G Expenses approved by Commission (In Rs. Cr)
73 Table 16: R&M Expenses approved by Commission (In Rs. Cr)
74 Table 17: O&M Expenses approved by Commission (In Rs. Cr)
74 Table 18: Capitalisation approved by Commission (In Rs. Cr)
75 Table 19: Depreciation submitted by Petitioner (In Rs. Cr)
75 Table 20: Depreciation Rate (%)
76 Table 21: Depreciation approved by Commission (In Rs. Cr)
76 Table 22: Interest and Finance charges approved by Commission (In Rs. Cr) 78 Table 23: Interest on Consumer Security Deposits submitted by Petitioner (In Rs. Cr) 79 Table 24: Interest on Consumer Security Deposits approved by Commission (In Rs. Cr) 79 Table 25: Interest on Working Capital approved by Commission (In Rs. Cr) 80 Table 26: Non-Tariff Income as submitted by Petitioner (In Rs. Cr)
81 Table 27: Non-Tariff Income approved by Commission (In Rs. Cr)
81 Table 28: Non-Tariff Income approved by Commission (In Rs. Cr)
82 Table 29: Aggregate Revenue Requirement approved by Commission for FY 2013-14 (In Rs. Cr) 82 Table 30: Revenue at existing tariff submitted by the Petitioner for FY 2013-14 (In Rs. Cr) 83 Table 31: Revenue at existing tariff approved by Commission for FY 2013-14 (In Rs. Cr) 84 Table 32: Standalone Revenue Gap/Surplus approved by Commission for FY 2013-14 (In Rs. Cr) 85 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 Table 33: No. of Consumer, Connected Load and Energy Sales approved by Commission 90 Table 34: Energy Savings under DELP (MU)
90 Table 35: Inter-State Transmission Loss (%)
91 Table 36: Intra-State T&D loss (%)
91 Table 37: Power Purchase Quantum (MU) and cost (Rs. Cr) approved by Commission 93 Table 38: Summary of Renewable Purchase Obligation (RPO) (MU)
95 Table 39: Cost towards compliance of Renewable Purchase Obligation (RPO) (In Rs. Cr) 96 Table 40: Energy Balance (MU) approved by Commission
96 Table 41: O&M Expenses approved by Commission (In Rs. Cr)
97 Table 42: Capitalisation approved by the Commission (In Rs. Cr)
97 Table 43: Depreciation approved by Commission (In Rs. Cr)
98 Table 44: Interest and Finance Charges approved by Commission (In Rs. Cr) 98 Table 45: RoE approved by Commission (In Rs. Cr)
99 Table 46: Interest on Security Deposits approved by Commission (In Rs. Cr) 99 Table 47: DSM Expenses as approved by Commission (In Rs. Cr)
100 Table 48: Interest on Working Capital approved by Commission (In Rs. Cr) 100 Table 49: Non-tariff Income approved by Commission (In Rs. Cr)
101 Table 50: Aggregate Revenue Requirement approved by Commission for FY 2018-19 (In Rs. Cr) 101 Table 51: Revenue submitted by Petitioner (In Rs. Cr)
102 Table 52: Revenue from existing retail tariff for FY 2018-19 (In Rs. Cr)
103 Table 53: Standalone Revenue Gap/Surplus approved by Commission (In Rs. Cr) 105 Table 54: Standalone Revenue Gap/Surplus submitted by Petitioner (In Rs. Cr) 107 Table 55: Standalone Revenue Gap/Surplus determined by Commission (In Rs. Cr) 107 Table 56: Retail Tariff proposed by Petitioner
108 Table 57: Existing and approved tariff
111 Table 58: Revenue from approved retail tariff (In Rs. Cr)
113 Table 59: Tariff increase approved by Commission
114 Table 60: Revised Revenue Gap/ Surplus approved by Commission (In Rs. Cr) 114 Table 61: Cost of Supply and tariff increase with and without Govt. Budgetary support 115 Table 62: Wheeling Charge calculation as submitted by Petitioner
116 Table 63: Allocation matrix approved by Commission
116 Table 64: Parameters assumed for voltage wise allocation of wheeling costs 117 Table 65: Wheeling Charges approved by Commission
117 Table 66: Additional Surcharge approved by Commission
118 Table 67: Cross-Subsidy Surcharge as proposed by the Petitioner
119 Table 68: Voltage wise losses assumed by Commission
119 Table 69: Energy Input at each voltage level (MU)
120 Table 70: Parameters used for allocation of fixed costs
120 Table 71: Voltage Wise Cost of Supply (VCoS)
120 Table 72: Cross-Subsidy Surcharge approved by Commission (Rs/kWh) 121 Table 73: Tariff Schedule
121 Table 74: Applicability of Tariff Schedule
123 Table 75: Applicability of ToD Tariff
134 Table 76: Schedule of Miscellaneous Charges
135 Table 77: Key Takeaways
143 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018
List of abbreviations
| Abbreviation | Full Form |
| A&G | Administration & General |
| ACoS | Average Cost of Supply |
| Act | The Electricity Act, 2003 |
| APR | Annual Performance Review |
| ARR | Aggregate Revenue Requirement |
| ATE | Appellate Tribunal of Electricity |
| BPL | Below Poverty Line |
| CAGR | Compound Annualized Growth Rate |
| Capex | Capital Expenditure |
| CEA | Central Electricity Authority |
| CERC | Central Electricity Regulatory Commission |
| CGRF | Consumer Grievance Redressal Forum |
| CGS | Central Generating Stations |
| Ckt. Km | Circuit Kilometer |
| COD | Commercial Operation Date |
| Commission/JERC | Joint Electricity Regulatory Commission for the State of Goa and Union Territories |
| Cr | Crore |
| DELP | Domestic Efficient Lightening Program |
| Discom | Distribution Company |
| DSM | Deviation Settlement Mechanism |
| EA 2003 | The Electricity Act, 2003 |
| EDG | Electricity Department, Govt. of Goa |
| EDF | Electricity Development Fund |
| EHT | Extra High Tension |
| ERP | Enterprise Resource Planning |
| FAR | Fixed Asset Register |
| FPPCA | Fuel and Power Purchase Cost Adjustment |
| FY | Financial Year |
| GFA | Gross Fixed Assets |
| HP | Horse Power |
| HT | High Tension |
| IEX | Indian Energy Exchange Limited |
| IPDS | Integrated Power Development Scheme |
| IPP | Independent Power Producer |
| ISTS | Inter-State Transmission System |
| JERC | Joint Electricity Regulatory Commission for the State of Goa and Union Territories |
| KVA | Kilo Volt Ampere |
| KWh | Kilo Watt Hour |
| LT | Low Tension |
| MOD | Merit Order Dispatch |
| MU | Million Units |
| MW | Mega Watt |
| MYT | Multi-Year Tariff |
| NFA | Net Fixed Assets |
| NTPC | National Thermal Power Corporation |
| NVVNL | NTPC Vidyut Vyapar Nigam Limited |
| O&M | Operation and Maintenance |
| PGCIL | Power Grid Corporation of India Ltd. |
| PLF | Plant Load Factor |
| PLR | Prime Lending Rate |
| POSOCO | Power System Operation Corporation Limited |
| PPA | Power Purchase Agreement |
| R&M | Repair and Maintenance |
| R-APDRP | Restructured Accelerated Power Development and Reforms Programme |
| REC | Renewable Energy Certificate |
| RLDC | Regional Load Despatch Centre |
| RoE | Return on Equity |
| RPO | Renewable Purchase Obligation |
| RTC | Round the Clock |
| SBI PLR | SBI Prime Lending Rate |
| SERC | State Electricity Regulatory Commission |
| SLDC | State Load Dispatch Centre |
| SOP | Standard of Performance |
| SRPC | Southern Regional Power Committee |
| T&D | Transmission & Distribution |
| TVS | Technical Validation Session |
| UI | Unscheduled Interchange |
| UT | Union Territory |
| WART | Weighted Average Retail Tariff |
| WRPC | Western Region Power Committee |
Before the
Joint Electricity Regulatory Commission
For the State of Goa and Union Territories, Gurugram
QUORUM Shri. M. K. Goel (Chairperson) Smt. Neerja Mathur (Member) Petition No. 249/2017
In the matter of
Approval for the True-up of the FY 2013-14, Annual Performance Review (APR) of the FY 2017- -18 and Aggregate Revenue Requirement (ARR) and Tariff proposal for the FY 2018-19.
And in the matter of
Electricity Department, Government of Goa (EDG)……………………………………….. Petitioner
ORDER
Dated: 28th March 2018
a) This Order is passed in respect to the Petition filed by the Electricity Department, Government of Goa (EDG) (herein after referred to as "The Petitioner" or "EDG" or "The Licensee") for approval of True-up of the FY 2013-14, Annual Performance Review of the FY 2017-18, Aggregate Revenue Requirement (ARR) and Tariff proposal for the FY 2018-19 before the Joint Electricity Regulatory Commission (herein after referred to as "The Commission" or "JERC").
b) On receipt of the Petition, the Commission scrutinised its contents and requisitioned further information/clarifications on the data gaps observed in the Petition to take a prudent view of the Petition. The Commission also held a Technical Validation Session to determine its sufficiency and the veracity of the information submitted. Further, suggestions/comments/objections were invited from the public/stakeholders. A Public Hearing was held and the stakeholders/public were heard. The schedule of activities performed in the course of this quasi-judicial process are given below:
Table 1: Timelines w.r.t the Petition filed by EDG
| Particular | Details |
| Date of Admission | 11th December, 2017 |
| Public Hearing | 31st January, 2017 |
| Technical Validation Session | 18th January, 2018 |
c) The tariff, as detailed in the Chapter "Tariff Schedule," Open Access Charges and other provisions as approved in this Order shall come into force from 1st April, 2018 and shall remain valid till further Orders of the Commission.
d) The licensee shall publish the revised Tariff Schedule and the salient features of tariff within one week of receipt of the Order in three daily newspapers in the respective local OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 languages of the region, besides English, having wide circulation in their respective areas of supply.
e) Ordered as above, read with the attached document giving detailed reasons, grounds and conditions.
-Sd-
-Sd-
Neerja Mathur M.K. Goel
(Member)
(Chairperson)
JOINT ELECTRICITY REGULATORY COMMISSION (For the State of Goa and Union Territories)
Place: Gurugram
Date: 28th March, 2018.
(Certified Copy)
Keerti Tewari
1. Chapter 1: Introduction
1.1. About Joint Electricity Regulatory Commission (JERC)
In exercise of powers conferred by the Electricity Act 2003, the Central Government constituted the Joint Electricity Regulatory Commission for all the Union Territories except Delhi to be known as "Joint Electricity Regulatory Commission for the Union Territories" vide Notification No. 23/52/2003-R&R dated 2 May, 2005. Later with the joining of the State of Goa, the Commission came to be known as "Joint Electricity Regulatory Commission for the State of Goa and Union Territories" (hereinafter referred to as "JERC" or "the Commission") vide Notification No. 23/52/2003-R&R (Vol. II) dated 30 May, 2008.
JERC is an autonomous body responsible for regulation of the Power Sector in the State of Goa and Union Territories of Andaman & Nicobar Islands, Lakshadweep Island, Chandigarh, Daman & Diu, Dadra & Nagar Haveli and Puducherry, consisting of generation, transmission, distribution, trading and use of electricity etc. Its primary objective includes taking measures conducive to the development of the electricity industry, promoting competition therein, protecting the interests of consumers and ensuring supply of electricity to all areas.
1.2. About Electricity Department, Government of Goa (EDG)
The Electricity Department was formed in January 1963 under the Government of Goa. It is the only licensee operating in the State of Goa for Transmission and Distribution of Electricity. The power requirement of the State is met through its share from Central Sector Generating Stations (CGS), Co-Generation Plants & IPP's operating within the territory and from Open Market.
1.3. JERC Tariff Regulations, 2009
The Commission notified the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Terms and Conditions for Determination of Tariff) Regulations, 2009 on OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 9th February, 2009 applicable to the whole of the State of Goa and the Union Territories of Andaman and Nicobar Islands, Chandigarh, Dadra and Nagar Haveli, Daman and Diu, Lakshadweep and Puducherry. The Regulations were applicable till the FY 2015-16 till the MYT Distribution Tariff Regulations, 2014 were notified by the Commission on 30th June 2014.
1.4. Multi-Year Distribution Tariff Regulations, 2014
The Commission notified the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (except Delhi) (Multi-Year Distribution Tariff) Regulations, 2014 on 30th June, 2014 applicable for a three year Control period starting from FY 2015-16 till FY 2017-18. The Commission subsequently notified the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (except Delhi) (Multi-Year Distribution Tariff) (First Amendment) Regulations, 2015 on 10th August, 2015 shifting the MYT Control Period to FY 2016-17 to FY 2018-19. These Regulations are applicable to all the distribution licensees in the State of Goa and Union Territories of Andaman & Nicobar Islands, Lakshadweep Island, Chandigarh, Daman & Diu, Dadra & Nagar Haveli and Puducherry.
1.5. Filing and Admission of the Present Petition
The Electricity Department, Government of Goa (EDG) filed the Petition for True-up of the FY 2013-14, APR of the FY 2016-17 and FY 2017-18 and ARR and Tariff Proposal for the FY 2018-19 vide letter dated 7th December, 2017. On preliminary scrutiny of the Petition, certain data gaps were observed on which the reply of the Petitioner was sought. The Petition was also scrutinized in terms of the JERC (Conduct of Business) Regulations, 2009. The Petition was admitted on 11th December, 2017 and numbered as Petition No. 249/2017. A letter indicating gaps in the information as well as the documentation was sent to the Petitioner.
1.6. Interaction with the Petitioner
The Order has referred at numerous places to various actions taken by the "Commission." It may be mentioned for the sake of clarity that the term "Commission," except for the Hearing and Orders, denotes the Secretariat of the Commission responsible for carrying out technical due diligence and validation of data of the Petitions filed by the utilities, obtaining and analysing information/clarifications received from the utilities, and submitting relevant issues for consideration of the Commission.
A preliminary scrutiny/analysis of the Petition was conducted and certain deficiencies were observed. Accordingly, deficiency notes were issued to the Petitioner. Further, additional information/clarifications/justifications were solicited from the Petitioner as and when required. The Commission and the Petitioner also discussed various concerns of the Petitioner and key data gaps, which included Energy Sales, revenue from retail tariff, capitalisation, tariff proposal etc. The Petitioner submitted its response on the issue through various letters.
The Commission conducted the Technical Validation Session (TVS) with the Petitioner at the Commission's office in Gurugram, during which the discrepancies in the Petition were discussed and additional information required by the Commission were sought. Subsequently, the Petitioner submitted replies to the issues raised in these sessions and provided OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 documentary evidence to substantiate its claims regarding various submissions. The following table provides the list of interactions with the Petitioner along with the date:
Table 2: Timelines of the interaction with the Petitioner
| S. No | Subject | Date |
| 1 | Issue of First Discrepancy Note | 20th December 2017 |
| 2 | Reply received from Petitioner | 22nd December 2017 and 15th January 2018 |
| 3 | Technical Validation Session | 17th January 2018 |
| 4 | Issue of 2nd Discrepancy Note | 18th January 2018 |
| 5 | Reply received from Petitioner | 7th February 2018 |
| 6 | Issue of 3rd Discrepancy Note | 20th February 2018 |
| 7 | Reply received from Petitioner | 1st March 2018 |
| 8 | Public Hearing | 31st January 2018 |
1.7. Notice for Public Hearing
Public Notices were published by the Commission in the leading newspapers as tabled below, giving due intimation to the stakeholders, consumers and the public at large about the Public Hearing to be conducted by the Commission.
Table 3: Details of Public Notices published by the Commission
| S. No. | Date | Name of Newspaper | Language | Place of Circulation |
| 1. | 4th January 2018 | The Times of India | English | Goa |
| The Navhind Times | English | Goa | ||
| Gomantak | Konkani (Marathi) | Goa | ||
| 2. | 29th January 2018 | The Times of India | English | Goa |
| The Navhind Times | English | Goa | ||
| Gomantak | Konkani (Marathi) | Goa |
Copies of the Public Notices published by the Commission for intimation of the Public Hearing are attached as Annexure 1 to this Order. These notices were also uploaded on the Commission's website.
The Public Notice was published by the Petitioner in the following newspapers for inviting objections/suggestions from the stakeholders on the Tariff Petition:
| S. No. | Date | Name of Newspaper | Language | Place of Circulation |
| 1. | 3rd January 2018 | The Navhind Times | English | Goa |
| 2. | Gomantak | Konkani (Marathi) | Goa | |
| 3. | National Herald | English | Goa |
Copies of the Public Notices published by the Petitioner for intimation of the Public Hearing are attached as Annexure 2 to this Order.
1.8. Public Hearing
The Public Hearing was held on 31st January 2017 from 10:00 A.M. onwards at "Ravindra Bhawan" at Goa to discuss the issues related to the Petition filed by the Petitioner. The issues and concerns raised by the stakeholders in writing and as voiced by them during the hearing have been examined by the Commission. The issues discussed during the public hearing and/or written comment made by the stakeholders, the responses of the Petitioner thereon and the views of the Commission, have been summarized in Chapter 2 of this Order.
2. Chapter 2: Summary of Suggestions/Objections received, Response from the
Petitioner and the Commission's Views
2.1. Regulatory Process
On admitting the Petition, the Commission directed the Petitioner to make copies of the Petition available to the public, upload the Petition on the website and also publish the same in the newspapers in an abridged form in the given format duly inviting comments/objections from the public as per the provisions of the MYT Regulations, 2014.
The Public Hearing was held on 31st January 2018 from 10:00 A.M. onwards at Goa. During the Public Hearing, some of the stakeholders who had submitted their comments in writing also presented their views in person before the Commission. Other participants from the general public, who had not submitted written objections earlier, were also given an equal opportunity to present their views/suggestions in respect of the Petition.
The list of the stakeholders is attached as Annexure 3 to this Order.
2.2. Suggestions/Objections, Response of the Petitioner and Commission's Comments
The Commission is appreciative of the efforts of various stakeholders in providing their suggestions/comments/observations to make the process responsive and efficient. The relevant observations of the stakeholders have been suitably considered by the Commission while finalizing this Tariff Order. The submissions of the stakeholders, response of the Petitioner and views of the Commission are summarized below:
2.2.1. Procurement of power from cheaper solar energy sources
Stakeholder's Comment:
The Petitioner should procure power from cheaper solar energy sources that will reduce the power purchase cost. Further, the status of fulfillment of RPO has not been submitted.
Petitioner's Response:
It is submitted that ED-Goa has almost complied with the backlog of the Renewable Power Obligations (RPO) up to FY 2016-17, ED-Goa further submits that from FY 2017-18 onwards ED-Goa has been procuring renewable Power as per requirement to meet the Renewable Power Obligations on year on year basis. Government of Goa has issued Solar Power Policy 2017 to further enable cheaper and local power in the State of Goa. The consumers are also requested to avail the facility of net metering and earn on generating solar power and supplying to ED-Goa.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Commission's View:
The Commission has taken note of the Petitioner's submission. The Commission has dealt appropriately with the compliance towards RPO for FY 2018-19 while approving the Power Purchase Cost of FY 2018-19 in the Chapter 6 of this Order. The Petitioner has not yet submitted the Petition for True-up of FY 2016-17, therefore, the Commission is unable to verify the Petitioner's submission of clearing all the pending backlog in FY 2016-17.
The Commission directs the Petitioner to give wide publicity to the Solar Policy, 2017 and facilitate the stakeholders in Rooftop Solar Power Generation within the State of Goa. In view of cheaper renewable power available now, the Petitioner needs to continue to purchase physical solar or non-solar power to fulfill its RPO compliance.
2.2.2. Power Supply in the State is not reliable
Stakeholder's Comment:
The quality and reliability of supply in the State is very poor in the State. Further, Power distribution infrastructure is not capable of handling the growing power demand of the State.
Petitioner's Response:
EDG has been taking several measures to improve the infrastructure of the State. ED-Goa has planned for the IT initiatives and distribution infrastructure improvement plan which broadly includes 400KV S/S at Xeldem/Dharbandora for interlinking Western Grid with Southern Grid, as any breakdown causes for black out or load shedding, additional 220/33KV S/S at Tuem, Saligao, Verna and inter connecting 220KV lines from Amona to Cuncolim, New 33/11KV Sub-station (Badem, Mandrem, Karaswada, Calangute, Sal, Altinho-Panaji, Navelim, Colva, Balli and Dhabal) to reduce loading on existing transformers, reduce 11KV feeder length and to cater additional growth, Underground cabling works, ABC works etc. Further, EDG has implemented LED lighting scheme. The scheme also includes Centralized Control and Monitoring System (CCMS) for remote switching on/off of lights which will be effective from 1st April 2018.
Commission's View:
The Commission has received various complaints against the Petitioner with regards to the quality and reliability of supply in the State. The Petitioner during the past few years has been undertaking lower capitalisation and R&M expenses than approved which clearly implies that enough efforts are not being undertaken to supply quality/reliable power to the consumers. The Commission directs the Petitioner to increase its efforts towards augmenting and maintaining the requisite infrastructure to meet the growing demand and avoid any kind of supply constraints to consumers.
2.2.3. Creation of new category for Electric Vehicles
Stakeholder's Comment:
A new category for Electric Vehicle should be created that will cater to the increasing demand of power due to commercialization of Electric Vehicles.
Petitioner's Response:
It is submitted that determination of tariff is a matter under purview of the Commission and is determined based on the principles of Electricity Act, 2003 and National Tariff Policy 2006.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018However ED-Goa submits that till the time there is development on a large scale on Electric Vehicles and Charging Stations, LT/HT Commercial Tariff be made applicable. For e.g. In Maharashtra presently LT/HT Commercial tariff is applicable if consumer uses the electricity for charging his own vehicles at his premises.
Commission's View:
The Commission has noted the submission of the Petitioner. The Commission believes that the demand for charging infrastructure for electric vehicles will increase in the near future due to increased commercialization. However, the Commission doesn't find it practical to consider the consumers under this category under LT/HT Commercial, as suggested by the Petitioner. The Commission would require the Petitioner to submit data on the number of consumers, connected load and the anticipated demand to enable the Commission to determine the tariff accurately as it will impact the Petitioner's revenue. The Petitioner in this regard is directed to submit a proposal for creation of any such category backed with the requisite data along with the next tariff petition.
2.2.4. Submission of Fixed Asset Register (FAR)
Stakeholder's Comment:
The valuation of assets as per FAR submitted for FY 2013-14 has increased by almost two and a half times as compared to approved. The FAR has been prepared without any basis.
Petitioner's Response:
In regard to the re-valuation of assets, it is submitted that the Commission in its Tariff order dated 27th June 2012 for FY 2011-12 had considered "Nil" opening value of Gross Fixed Asset (GFA) as Audited Accounts and Fixed Asset Register were not available from FY 2006-07 onwards. Accordingly ED-Goa was directed in the said order to undertake preparation of FAR & FS on commercial/regulatory principles.
The Commission in its Order dated 23rd May 2017 has approved Gross Fixed Assets (GFA) for FY 2011-12 and FY 2012-13 post its review & prudence check, as per Audited Accounts and also taking into consideration Fixed Asset Register.
It is submitted that it is misconception of objectioner that assets are revalued and audited without any basis. It is submitted that FAR is prepared by Independent agency and the values of FAR are part of audited annual accounts which is certified by CAG from time to time for respective financial years. It is humbly submitted that asset value is same as per original cost/ /book value and it is just that Commission is considering the GFA value in truing-up process after prudence check and on receipt of audited annual accounts only.
Commission's View:
The Commission has noted the submission of the Petitioner. The valuation of the assets had been revised by the Commission in the last Tariff Order while undertaking the True-up of FY 2011-12 and FY 2012-13. This was done based on the audited FAR submitted by the Petitioner for the years prior to FY 2013-14 and after proper prudence check by the Commission. The Commission while undertaking the True-up of FY 2013-14 in this Order has considered the same opening GFA as the closing GFA as approved in the True-up of FY 2012-13. The addition in GFA has been approved based on the FAR submitted by the Petitioner for FY 2013-14 duly audited by an Independent Agency.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20182.2.5. Wastage of electricity in Govt. offices
Stakeholder's Comment:
Lights are on in government offices even during the daytime leading to wastage of power.
Petitioner's Response:
The Petitioner clarified during the hearing that officers and staff of various government offices are being briefed regularly for conservation of electricity.
Commission's View:
The Commission notes the submission of the Petitioner and advises it to regularly issue appropriate circulars to various departments/offices to make them aware about the benefits of conservation of electricity. Suitable stickers for electricity conservation at appropriate places may be pasted to remind the users to switch of the lights, when not required.
2.2.6. Implementation of Demand Side Management (DSM)
Stakeholder's Comment:
The Petitioner should implement DSM which will help in reducing the cost of power and conserve electricity.
Petitioner's Response:
EDG has taken various measures under Demand Side Management (DSM) program which include Energy Efficiency measures also. DSM Programs are aimed to reduce consumption at consumer end and lower the peak demand. DSM also includes use of energy efficient appliances by consumers. EDG has taken various measures under LED lighting scheme, replacement of around 1.95 Lakhs conventional street light fixtures has already been done. The scheme also includes Centralised Control and Monitoring System (CCMS) for remote switching on/off of lights. Besides this, EDG has also has been undertaking various DSM schemes such as:
• Jyotirmay Goa Scheme–around 8.20 lakhs LED bulbs (3 LED of 9 W to each household of Goa) were distributed under the scheme.
• UJALA (DELP)–Distribution of LED bulbs on subsidized cost to household consumers which can save energy by up to 80%.
• Street Lighting National Programme (SLNP)–Replacement of 1.66 lakh Nos. existing conventional street lights throughout the entire State of Goa by high quality energy efficient smart LED fixtures/lights with around 4200 Nos. of Centralised Control and Monitoring System (CCMS).
• Demonstration of energy efficient technologies through demonstration projects and LED village campaign.
The Petitioner shall continue undertaking a lot of these kind of initiatives for increased energy saving energy and reduce the cost of power purchase.
Commission's View:
The Commission has noted the submission of the Petitioner. The Petitioner should widely promote the initiatives among the public to create awareness. The stakeholder is requested to get in contact with the nearest EDG office to avail the benefits of these schemes. The Commission has allowed Rs 3.03 Cr towards DSM expenses in the ARR of FY 2018-19.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20182.2.7. Submission of Energy Audit Report
Stakeholder's Comment:
EDG should provide an action plan with timelines for preparation of Energy Audit Report. In case of non-compliance, the Commission should initiate action.
Petitioner's Response:
DT metering is pending for 250 Distribution Transformer (DTs) (out of total 6154 DTs). Further, the department is also facing teething issues with respect to modems, sims, communications etc. where meters are installed and the same are being addressed. EDG aims to complete DT metering within next 4-6 months. EDG also submits that non-working energy meters are being replaced. Work Order for 1.50 Lakh meters has already been issued and work is expected to commence shortly. Order for another 1.50 Lakh meters will be placed by end of FY 2017-18. Once the above activities are completed, energy audit can be taken as per directives of the Commission.
Commission's View:
The Commission directs the Petitioner to complete the process of DT and Feeder metering and take up the Energy Audit of the State on priority.
2.2.8. Unbundling and Corporatisation
Stakeholder's Comment:
Unbundling and Corporatisation has still not happened.
Petitioner's Response:
It is submitted that ED-Goa has pursued this matter with Government of Goa and ED-Goa is yet to receive any specific directives on the same.
Commission's View:
The Commission has directed the Petitioner to submit the proposal to the State Govt. by 30th June 2018. Till such time a decision is taken by the State Govt. ring fencing of the transmission functions should be initiated. Further, it is directed that the Petitioner should increase its efforts towards making the State Load Dispatch Center (SLDC) fully operational.
2.2.9. Issue of Solar Policy
Stakeholder's Comment:
The Petitioner has still not finalised the Solar Policy of the State.
Petitioner's Response:
It is submitted that Solar Energy Policy 2017 has been issued by Goa Energy Development Agency (GEDA) with due approval of Government of Goa.
Commission's View:
The Commission has noted the Petitioner's response. The Petitioner is directed to widely publicise the Solar Policy and upload the same on its website for the benefit of the general public. The Petitioner is also directed to submit a copy of the Policy to the Commission.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20182.2.10. Residential apartments are being rented out as Commercial/Paying Guests
accommodation and are still paying Domestic tariff.
Stakeholder's Comment:
Several tourists are staying in Rent-Back-Apartments in the coastal villages of Goa but pay residential rates instead of commercial, as the Department officials are making no attempt to take any action in the matter, thereby resulting in a revenue loss of crores of rupees.
Petitioner's Response:
It is submitted that there is already a provision in the Tariff Order dated 23rd May 2017 under LT & HT Commercial category for "Houses with Rent back facilities". The consumers having houses with rent back facilities are supposed to take LT/HT Commercial connection (which has higher tariff than domestic category).
Commission's View:
The Commission has taken note of the Petitioner's submission. The Commission directs the Petitioner to ensure that every consumer is given connection based on the categories they come under to avoid any kind of malpractices. The stakeholder is requested to report specific cases, if any, to nearby EDG office so that necessary action can be taken in this regard.
2.2.11. Proposed tariff hike is not justified
Stakeholder's Comment:
The proposed tariff hike to recover the revenue gap is not justified. No tariff hike should be done similar to the previous year.
Petitioner's Response:
It is submitted that out of total revenue gap computed for FY 2018-19, the tariff hike of less than 5% is sought and rest is funded from the budgetary support. Last year there was no tariff hike and the entire burden was borne by the Government of Goa. Considering other inflations across sectors over 2 years which is in the range of 5-8% p.a., the tariff hike of less than 5% is justified. However determination of tariff is in the purview of the Commission.
Commission's View:
The Commission has noted the Petitioner' submission. The Commission has determined the Revenue gap for the FY 2018-19 based on the revised estimate of Power Purchase Cost of FY 2018-19. The Commission believes that the tariff should progressively reflect the cost of supply. The Commission while determining the tariff for FY 2018-19 has considered the prudent cost of the Petitioner and has accordingly determined the tariff for each consumer category.
2.2.12. Implementation of LED Street Lights
Stakeholder's Comment:
Street Lights across many areas in the villages are yet to be deployed with LED Lights
Petitioner's Response:
EDG has already completed the replacement of around 1.95 Lakhs conventional street light fixtures. The scheme also includes Centralised Control and Monitoring System (CCMS) for remote switching on/off of lights. Installation of the same is in progress. Street light is to be maintained and monitored by M/s EESL for the period of 10 years. Work is targeted for completion by March 2018. This will have energy saving of ~27 MU every year.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Commission's View:
The Commission has taken note of the Petitioner's submission. The Commission directs the Petitioner to expedite the process of replacing the conventional street lights with LED lights and submit a compliance status report of the same to the Commission at the earliest.
3. Chapter 3: True-up of FY 2013-14
3.1. Background
The Commission issued the Order on Aggregate Revenue Requirement (ARR) and Retail Tariff for the FY 2013-14 on 31st March 2013. Subsequently, the Commission issued the Tariff Order for FY 2014-15, determining the Aggregate Revenue Requirement (ARR) and tariff for FY 2014-15 and Annual Performance Review of FY 2013-14 on 15th April 2014 (hereinafter referred to as the "APR Order").
The True-up of the FY 2013-14 is to be carried out as per Regulation 8 (2) of the JERC Tariff Regulations, 2009:
(2) (i) After audited accounts of a year are made available, the Commission shall undertake
similar exercise as above with reference to the final actual figures as per the audited accounts.
This exercise with reference to audited accounts shall be called 'Truing Up'.
(ii) The Truing Up for any year will ordinarily not be considered after more than one year of
'Review'.
(3) The revenue gap of the ensuing year shall be adjusted as a result of review and truing up
exercises.
(4) While approving such expenses/revenues to be adjusted in the future years as arising out
of the Review and/or Truing up exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenues. Carrying costs shall be limited to the
interest rate approved for working capital borrowings.
(5) For any revision in approvals, the licensee would be required to satisfy the Commission that
the revision is necessary due to conditions beyond its control.
(6) In case additional supply is required to be made to any particular category, the licensee
may, any time during the year make an application to the Commission for its approval. The
application will demonstrate the need for such change of consumer mix and additional supply of
power and also indicate the manner in which the licensee proposes to meet the cost for such
change of consumer mix and additional supply of power.
(7) The Commission may consider granting approval to such proposals provided the cost of
additional supply is ordinarily met by the beneficiary category."
In this Chapter, the Commission has analysed all the elements of actual revenue and expenses for the FY 2013-14 and has carried out the True up of expenses and revenue with reference to the actual figures (final) as per the audited accounts, after a prudence check and has permitted necessary adjustments in cases where variations are for reasonable and justifiable reasons.
3.2. Energy Sales
Petitioner's Submission
The Petitioner has submitted the total quantum of energy sales for FY 2013-14 as 3070.56 MU as against an approved energy sales quantum of 2961.80 MU in the APR Order.
Commission's Analysis
The Commission, after going through the submissions of the Petitioner including the audited accounts, has considered the energy sales as 3,070.56 MU as submitted by the Petitioner for the purpose of True-up of the FY 2013-14 as shown in the table on the next page:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 5: Energy Sales (MU) trued-up by the Commission
| S. No | Category | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| A. LOW TENSION SUPPLY | ||||
| 1 | LTD/Domestic | 800.00 | 844.23 | 844.23 |
| 2 | LTD/L.I.G. | 2.00 | 8.26 | 8.26 |
| 3 | LTD Domestic Mixed | 6.00 | 5.00 | 5.00 |
| 4 | LTC/Commercial | 292.00 | 280.97 | 280.97 |
| 5 | LTP/Motive Power | 89.00 | 74.41 | 74.41 |
| 6 | LTP Mixed (Hotel Industries) | 5.00 | 4.73 | 4.73 |
| 7 | LTP Ice Manufacturing | 8.00 | 8.00 | 8.00 |
| 8 | LTAG/Agriculture | 16.00 | 17.76 | 17.76 |
| 9 | LTPL (Public lighting) | 24.00 | 37.23 | 37.23 |
| 10 | LTPWW/Public Water works | 6.00 | 2.08 | 2.08 |
| 11 | LT Temporary | 10.00 | 17.89 | 17.89 |
| Sub-Total | 1258.00 | 1300.57 | 1300.57 | |
| B. HIGH TENSION SUPPLY | ||||
| 12 | HT (Mixed) | 112.00 | 117.88 | 117.88 |
| 13 | HTI (Industrial) Ferro Metallurgical/ Steel Melting/Power Intensive. | 532.00 | 517.37 | 517.37 |
| 14 | HTI Industrial | 628.00 | 619.33 | 619.33 |
| 15 | HTAG (Agriculture) | 6.00 | 6.09 | 6.09 |
| 16 | EHTI (Industrial) | 184.00 | 142.55 | 142.55 |
| 17 | HT P.W.W. & Sewage system | 138.00 | 138.12 | 138.12 |
| 18 | HT. M.E.'s Defence Estt. | 24.00 | 26.66 | 26.66 |
| 19 | HTI (Steel Rolling) | 59.00 | 69.02 | 69.02 |
| 20 | HTI/IT High Tech | 20.00 | 66.23 | 66.23 |
| 21 | HTI/Ice Manufacturing | 0.00 | 0.85 | 0.85 |
| 22 | Sale from EDG to GSPL (Div. VII) | 0.00 | 8.70 | 8.70 |
| 23 | HTI Hotel Industry | 0.00 | 57.11 | 57.11 |
| 24 | HT Temporary | 0.00 | 0.06 | 0.06 |
| Sub-Total | 1703.00 | 1769.99 | 1769.99 | |
| Total | 2961.80 | 3070.56 | 3070.56 |
The Commission approves the energy sales as 3070.56 MU in the True-up of FY 2013-14.
3.3. Inter-State Transmission loss
Petitioner's submission
Petitioner has submitted the Inter-State transmission loss of 4.68% against a loss of 4.47% approved in the APR Order.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Commission's analysis
The Commission has verified the Inter-State losses from the supporting documentary evidence submitted by the Petitioner and as per information available on WRPC/SRPC websites. The Commission accordingly trues-up the Inter-State Losses as shown in the table below.
Table 6: Inter-State transmission loss (%)
| S. No | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Inter-State Transmission Loss | 4.47% | 4.68% | 4.68% |
The Commission trues-up Inter-State Transmission Loss as 4.68% in the True-up of the
FY 2013-14.
3.4. Intra-State Transmission & Distribution (T&D) loss
Petitioner's submission
The Petitioner has submitted that it has achieved an Intra-State T&D loss of 11.16% in the FY 2013-14 against an approved loss of 12.00%.
Commission's analysis
The Petitioner in its submission has failed to submit the Energy Audit Report of the State for FY 2013-14. In the absence of the Energy Audit Report, the Commission, for verification of the Intra-State T&D loss levels has relied on the information of energy drawal at state periphery, available on the Western and Southern Region Power Committee websites and the energy sales as approved above. Therefore, in accordance with the information available on the websites, the Commission approves Intra-State T&D loss of 11.16% for the FY 2013-14 against an approved loss of 12.00% in the APR Order.
The Petitioner in the Technical Validation Session (TVS) held at the Commission's office submitted that due to change in billing agencies, EDG has witnessed a transitional change in energy accounting and billing in the past few years prior to FY 2017-18 which has resulted in distortion in energy sales. The impact of the same can be observed in FY 2013-14 as well. Therefore, in the absence of reliable sales figures for FY 2013-14, the Commission has decided not to consider any incentive for the overachievement of T&D Loss target in the FY 2013-14.
The table below provides the Intra-State T&D loss approved in the APR of FY 2013-14, Petitioner's submission and as approved by the Commission now.
Table 7: Intra-State distribution loss (%)
| S. No | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | T&D Losses (%) | 12.00% | 11.16% | 11.16% |
The Commission, while Trueing up for FY 2013-14, has considered the actual Intra-State
T&D loss of 11.16% for the FY 2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20183.5. Power Purchase Quantum & Cost
Petitioner's submission
The Petitioner submitted that it meets its total energy requirement from its allocation from the Central Generating Stations (CGS) and Co-generating Companies like Goa Energy Pvt. Ltd and Goa Sponge & Power Ltd. Energy requirement is also met through NVVNL and through IPP (Reliance Infra). The Power Purchase Cost has been submitted as incurred by the Petitioner in FY 2013-14. The Power Purchase cost also includes ED, Cess, Incentive etc. and supplementary charges considered on actual basis.
The transmission charges comprise of transmission charges of Western Region and Southern Region.
With regards to Renewable Purchase Obligation (RPO), the Petitioner submitted that the matter has been pursued in case No. 61/2012. The Petitioner submitted that the Non-Solar RPO is being met through purchase of Co-generation power and the same has been acknowledged by the Commission vide its Order dated 27th December 2013 in case No. 61/2012.
The power purchase quantum and cost for FY 2013-14, as submitted by the Petitioner has been shown in the following table:
Table 8: Power Purchase cost submitted by the Petitioner (in Rs Cr)
| S. No. | Source | Power Purchase (MU) | Fixed Charges (Rs Cr) | Variable Charges (Rs Cr) | Other Charges (Rs Cr) | Total Charges (Rs Cr) |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| A | Central Sector Power Stations | |||||
| I | NTPC | 3181.02 | 241.72 | 428.33 | 40.05 | 710.10 |
| KSTPS | 1645.01 | 91.43 | 154.89 | 21.04 | 267.37 | |
| KSTPS - III | 41.09 | 6.39 | 3.88 | 0.76 | 11.02 | |
| VSTPS - I | 231.57 | 18.03 | 31.75 | 5.92 | 55.69 | |
| VSTPS - II | 103.89 | 6.82 | 13.45 | 2.45 | 22.72 | |
| VSTPS -III | 92.82 | 9.80 | 12.03 | 1.85 | 23.68 | |
| VSTPS-IV | 49.77 | 7.30 | 6.48 | 0.40 | 14.17 | |
| KGPP | 30.71 | 7.96 | 8.30 | (2.14) | 14.12 | |
| GGPP | 30.33 | 10.39 | 8.52 | (2.02) | 16.89 | |
| SIPAT- I | 142.91 | 22.99 | 22.01 | 5.23 | 50.22 | |
| RSTPS | 725.58 | 43.37 | 152.30 | 4.40 | 200.07 | |
| SIPAT- II | 80.19 | 10.46 | 12.70 | 1.48 | 24.64 | |
| Mouda | 7.16 | 6.79 | 2.02 | (1.13) | 7.68 | |
| Supplementary charges inclusive of rebate | - | 1.82 | 1.82 | |||
| II | RGPPL | 13.94 | 8.71 | (0.13) | 8.58 | |
| III | NPCIL | 200.21 | 51.98 | (1.18) | 50.80 | |
| KAPS | 117.98 | 28.34 | (0.65) | 27.69 | ||
| TAPS | 82.23 | 23.64 | (0.53) | 23.11 | ||
| IV | NET OVER- DRAWAL | 32.34 | 24.19 | 0.00 | 24.19 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| B | Within State Generations | |||||
| I | CO-GENERATION | 74.03 | - | 17.54 | 0.00 | 17.54 |
| Goa Energy Private Limited | 67.65 | 16.08 | 0.00 | 16.08 | ||
| Goa Sponge & Power Limited | 6.37 | 1.46 | 0.00 | 1.46 | ||
| C | IPP | |||||
| Reliance Infra | 115.39 | 146.46 | 0.00 | 146.46 | ||
| D | OTHER CHARGES | - | - | - | 120.79 | 120.79 |
| PGCIL Transmission Charges, Wheeling & Other Charges | 120.79 | 120.79 | ||||
| Total | 3616.94 | 241.72 | 677.20 | 160.71 | 1078.46 |
Commission's analysis
The Petitioner procures power mainly from NTPC Stations, NPCIL stations, Co-Generating Plants and IPP's. No power has been purchased through IEX/Bilateral Purchase etc. The Petitioner submitted the overall Power Purchase cost as Rs 1078.46 Cr inclusive of transmission charges but exclusive of revenue from UI Underdrawal/sale due to surplus power.
The Commission has verified the power purchase details as submitted by the Petitioner in its Petition with the publicly available information from the Regional Energy Accounts (REA) maintained by Western Region Power Committee (WRPC) for the Central Generating Stations (CGS). Further, apart from Western Region, the Petitioner also gets supply from the Southern Region from the NTPC's Ramagundam Thermal Power Station. The Commission has validated the power purchase details pertaining to this station from the publicly available information from the Regional Energy Accounts (REA) maintained by Southern Region Power Committee (SRPC). The Commission has verified the power purchase quantum and cost as per the monthly and station-wise bills submitted by the Petitioner. The cost has further been reconciled with the audited annual accounts of FY 2013-14.
The Petitioner has accounted for the revenue from UI Underdrawal separately and Income from Trading/Power Exchange as part of the Non-Tariff Income (NTI) and adjusted them both in the Overall ARR. Further, it has been noticed that the Petitioner although has considered the quantum of UI Underdrawal in the Total Power Purchase Quantum but has omitted the revenue pertaining to this UI Underdrawal in the Total Power Purchase Cost. The Commission, for the purpose of finalization of the Power Purchase Cost in the True up of FY 2013-14 has considered both the Income from UI Underdrawal and Trading/Power Exchange along with the Power Purchase cost approved now.
Other expenses such as the Transmission Charges and the Other Charges submitted have been considered as per actuals incurred by the Petitioner.
The Petitioner submitted that no cost has been incurred towards the compliance of Renewable Purchase Obligation (RPO) in FY 2013-14. The compliance status of RPO has been discussed in detail in the subsequent section. The table below provides the summary of the power purchase quantum and the cost approved by the Commission for FY 2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 9: Power Purchase Quantum (MU) and cost (Rs Cr) approved by the Commission
| S. No. | Source | Power Purchase (MU) | Fixed Charges (Rs Cr) | Variable Charges (Rs Cr) | Other Charges (Rs Cr) | Total Charges (Rs Cr) |
| A | Central Sector Power Stations | |||||
| I | NTPC | 3181.02 | 241.72 | 428.33 | 40.05 | 710.10 |
| KSTPS | 1645.01 | 91.43 | 154.89 | 21.04 | 267.37 | |
| KSTPS - III | 41.09 | 6.39 | 3.88 | 0.76 | 11.02 | |
| VSTPS - I | 231.57 | 18.03 | 31.75 | 5.92 | 55.69 | |
| VSTPS - II | 103.89 | 6.82 | 13.45 | 2.45 | 22.72 | |
| VSTPS -III | 92.82 | 9.80 | 12.03 | 1.85 | 23.68 | |
| VSTPS-IV | 49.77 | 7.30 | 6.48 | 0.40 | 14.17 | |
| KGPP | 30.71 | 7.96 | 8.30 | (2.14) | 14.12 | |
| GGPP | 30.33 | 10.39 | 8.52 | (2.02) | 16.89 | |
| SIPAT- I | 142.91 | 22.99 | 22.01 | 5.23 | 50.22 | |
| RSTPS | 725.58 | 43.37 | 152.30 | 4.40 | 200.07 | |
| SIPAT- II | 80.19 | 10.46 | 12.70 | 1.48 | 24.64 | |
| Mouda | 7.16 | 6.79 | 2.02 | (1.13) | 7.68 | |
| Supplementary charges inclusive of rebate | - | 1.82 | 1.82 | |||
| II | RGPPL | 13.94 | 8.71 | (0.13) | 8.58 | |
| III | NPCIL | 200.21 | 51.98 | (1.18) | 50.80 | |
| KAPS | 117.98 | 28.34 | (0.65) | 27.69 | ||
| TAPS | 82.23 | 23.64 | (0.53) | 23.11 | ||
| IV | Unscheduled Interchange/Sale of Surplus Power/ Trading | 32.34 | - | 12.58 | - | 12.58 |
| UI Over-drawal | 107.02 | - | 24.19 | - | 24.19 | |
| Less: UI Underdrawal/ Income from sale of Surplus Power/Trading | 74.68 | - | 11.61 | - | 11.61 | |
| B | Within State Generations | 189.42 | - | 164.00 | - | 164.00 |
| I | Co-Generation | 74.03 | - | 17.54 | 0.00 | 17.54 |
| Goa Energy Private Limited | 67.65 | 16.08 | 0.00 | 16.08 | ||
| Goa Sponge & Power Limited | 6.37 | 1.46 | 0.00 | 1.46 | ||
| II | IPP | 115.39 | - | 146.46 | 0.00 | 146.46 |
| Reliance Infra | 115.39 | - | 146.46 | 0.00 | 146.46 | |
| C | Other Charges | - | - | - | 120.79 | 120.79 |
| PGCIL Transmission Charges, Wheeling & Other Charges | 120.79 | 120.79 | ||||
| Total | 3616.94 | 241.72 | 665.59 | 159.53 | 1066.85 |
The Commission approves power purchase quantum of 3616.94 MU and cost of Rs 1066.85
Cr in the True-up of the FY 2013-14.
3.6. Renewable Purchase Obligation (RPO)
As per Clause 1, sub-clause (1) of the JERC for the State of Goa and UTs (Procurement of Renewable Energy) Regulations, 2010
"Each distribution licensee shall purchase electricity (in kWh) from renewable energy sources,
at a defined minimum percentage of the total consumption of all the consumers in its area during
a year."
The Commission, in its Business Plan Order dated 22nd December, 2015 issued in the Petition No. 186/2015, had reiterated that all the pending RPOs upto the FY 2015-16 must be fulfilled by the Petitioner by 31st March, 2016 and no backlog would be allowed to be carried forward to the MYT Control Period from FY 2016-17 to FY 2018-19.
The Petitioner for FY 2013-14 has not incurred any costs towards compliance of RPOs as mentioned in the previous section. The Petitioner has further submitted that it has completely fulfilled its RPO (both solar and non-solar) target till FY 2015-16 partly by way of purchase of physical power and partly by RECs.
The Petitioner had made the similar submission before the Commission in the True-up of FY 2011-12 and FY 2012-13 in the previous Tariff Order. The Commission at that time had not accounted for any cost or disincentive towards non-compliance of RPO till FY 2012-13. The Commission believed that since the actual cost towards compliance has been incurred only in FY 2015-16, therefore, the same shall be accounted for in the True-up for FY 2015-16.
In view of the above and keeping similar approach as adopted by the Commission towards RPO Compliance in True-up of FY 2011-12 and FY 2013-14, the Commission has not considered any cost towards RPO compliance in the FY 2013-14. The same shall be considered at the time of True-up of the FY 2015-16.
3.7. Energy Balance
Petitioner's submission
The Petitioner has submitted the energy balance as shown in the following table.
Table 10: Energy Balance (MU) submitted by Petitioner
| S. No. | Particulars | Petitioner's Submission |
| 1 | 2 | 3 |
| 1 | Energy Input at Goa Periphery | 3267.02 |
| 2 | Total Power Scheduled/Purchased at Goa Periphery | |
| Total Schedule Billed Drawal - CGS | 3395.17 | |
| Add: Over-drawal | 107.02 | |
| Add: Power purchase from NVVN/Banking | - | |
| Add: Power purchase from Traders/Open Market | - | |
| Less: Underdrawal | 74.68 | |
| Add: Renewable Power | - | |
| Less: Power diverted to Exchange | - | |
| Total | 3427.52 | |
| 3 | PGCIL Losses - MUs | 160.50 |
| PGCIL Losses - % | 4.68% |
| 1 | 2 | 3 |
| 4 | Total Power Purchased within Goa State | |
| Add: Co-generation | 74.03 | |
| Add: Independent Power Producers (IPP) | 115.39 | |
| Total | 189.42 | |
| 5 | Total Power Purchase availability after PGCIL Losses | 3456.44 |
| Less: Retail Sales to Consumers | 3070.56 | |
| Distribution Losses - MUs | 385.88 | |
| 6 | Distribution Losses - % | 11.16% |
Commission's analysis
The information submitted by the Petitioner on power purchase quantum, UI over/under drawl, IEX/Bilateral purchase etc. has been examined and accordingly the energy balance for FY 2013-14 has been derived. The Commission has determined the energy balance at the Periphery of the State of Goa. The following table provides the energy balance approved in the APR of FY 2013-14, the Petitioner's submission and now trued-up by the Commission.
Table 11: Energy Balance (MU) approved by Commission at State Periphery
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| A | Energy Requirement | |||
| 1 | Energy sales within the State/UT | 2961.80 | 3070.56 | 3070.56 |
| 2 | Distribution losses | |||
| % | 12.00% | 11.16% | 11.16% | |
| MU | 385.72 | 385.72 | 385.72 | |
| 3 | Energy required at State Periphery | 3365.68 | 3456.28 | 3456.28 |
| B | Energy Transactions at Periphery | |||
| 1 | Energy Availability from CGS stations | 3313.76 | 3423.93 | 3423.93 |
| (a) | Total availability from sources outside State | 3225.74 | 3234.51 | 3234.51 |
| (b) | Total availability from sources within State | 88.02 | 189.42 | 189.42 |
| 2 | UI Over drawal | 77.75 | 107.02 | 107.02 |
| 3 | UI/Under drawal | 33.58 | 74.68 | 74.68 |
| 4 | Banking Arrangement | 7.75 | - | - |
| 5 | Total Availability at State Periphery (1+2-3+4) | 3365.68 | 3456.28 | 3456.28 |
3.8. Operation & Maintenance (O&M) Expenses
The Operation & Maintenance Expenses comprise of the Employee Expenses, Administrative and General Expenses (A&G) and the Repair & Maintenance Expenses (R&M). The O&M Expenses have been approved in accordance with the Tariff Regulations, 2009 and the audited accounts submitted by the Petitioner for FY 2013-14.
3.8.1. Employee Expenses
Petitioner's submission
The Petitioner has incurred actual employee expenses of Rs 170.07 Cr against the approved expenses of Rs 144.21 Cr in the APR of FY 2013-14.
The following table provides the employee expenses as submitted by the Petitioner:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 12: Employee Expenses submitted by the Petitioner (In Rs Cr)
| S. No. | Particulars | Petitioner's Submission |
| 1 | Salary | 170.07 |
| 2 | Wages | |
| 3 | Stipend | |
| 4 | Transport Allowance | |
| 5 | Overtime allowance | |
| 6 | Total | 170.07 |
| 7 | Less: Add/Deduct share of others | - |
| 8 | Total | 170.07 |
| 9 | Less: Amount capitalized | - |
| 10 | Net amount | 170.07 |
| 11 | Add: Pension/DA and other Provision | - |
| 12 | Total Employee Expenses | 170.07 |
The Petitioner further submitted that the Employee Expenses for FY 2013-14 are on the higher side, on account of increase in Dearness Allowance, HRA and travel allowance, out of which the Dearness Allowance is an uncontrollable factor. The Dearness Allowance accounts to approx. 35% to 40% of the total employee expenses.
Commission's analysis
The Commission observes that the employee expenses approved in the past were based on the estimates prepared on cash basis and not accrual basis. The Petitioner had submitted and prepared the audited accounts prepared on commercial principles for the first time in the previous Tariff Order while undertaking the True-up of FY 2011-12 and FY 2012-13.
Since, the Base Employee Expenses considered while projecting the Employee Expenses for FY 2013-14 in the APR of FY 2013-14 were determined differently, the Commission finds it appropriate to consider the actual employee costs as available in the audited accounts for the purpose of the True-up of the FY 2013-14.
Further, the Petitioner has considered an expense towards CGRF of Rs 0.33 Cr separately in the ARR. The Commission, for the purpose of True-up, has considered this expense along with the Employee Expenses due to its inherent nature.
The table below provides the employee expenses approved in the APR Order, submitted by the Petitioner and now approved by the Commission.
Table 13: Employee Expenses approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Employee Expenses | 144.21 | 170.07 | 170.07 |
| 2 | Expense towards CGRF | - | - | 0.33 |
| 3 | Total Employee Expenses | 144.21 | 170.07 | 170.40 |
The Commission approves Employee Expenses of Rs 170.40 Cr in the True-up of FY 2013-14.
3.8.2. Administrative and General (A&G) Expenses
Petitioner's submission
The Petitioner has incurred A&G expenses of Rs 18.54 Cr against the approved expenses of Rs 9.08 Cr in the APR Order.
The following table provides the A&G expenses as submitted by the Petitioner:
Table 14: A&G Expenses submitted by Petitioner (In Rs Cr)
| S. No. | Particulars | Petitioner's Submission |
| 1 | Travelling Expenses | 0.39 |
| 2 | Office Expenses | 13.51 |
| 3 | Regulatory Expenses (License + Petition Fees) | 0.00 |
| 4 | Petrol, Oil, Lubricant (P.O.L.) | 0.00 |
| 5 | Rent, Rates & Taxes | 0.29 |
| 6 | Advertisement & Publicity | 0.26 |
| 7 | Professional & Special Services | 0.97 |
| 8 | Other A&G Charges | 1.46 |
| 9 | Overtime Allowance | 0.00 |
| 10 | Minor Works | 1.66 |
| 11 | Legal, Professional & Special Service Charges | 0.00 |
| 12 | Total A&G Expenses | 18.54 |
Commission's analysis
Similar to the approach followed while approving the Employee Expenses, the Commission approves the A&G Expenses as per the audited accounts for the purpose of True-up of the FY 2013-14. The table below provides the A&G Expenses approved in the APR of FY 2013-14, the Petitioner's submission and the expenses now approved by the Commission.
Table 15: A&G Expenses approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Administration & General Expenses (A&G) | 9.08 | 18.54 | 18.54 |
The Commission approves the Administrative & General (A&G) expenses of Rs 18.54 Cr in
the True-up of FY 2013-14.
3.8.3. Repair & Maintenance Expenses (R&M)
Petitioner's submission
The Petitioner has incurred R&M expenses of Rs 21.45 Cr against the approved expenses of Rs 19.61 Cr in the APR Order. The Petitioner submitted that it has been undertaking various R&M activities as a step towards improvement of systems, reduction in breakdowns, and reduction in response time and increasing preventive maintenance. R&M expenses are necessary for maintenance of infrastructure and for ensuring proper Standards of Performance of the Petitioner.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Commission's analysis
Similar to the approach followed while approving the Employee expenses and A&G expenses above, the Commission approves the R&M Expenses as per actual audited accounts of FY 2013- 14:
Table 16: R&M Expenses approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Repair & Maintenance Expenses (R&M) | 19.61 | 21.45 | 21.45 |
The Commission approves the Repair & Maintenance (R&M) expenses of Rs 21.45 Cr in the
True-up of FY 2013-14.
3.8.4. Total Operation and Maintenance Expenses (O&M)
The following table provides the O&M Expenses approved in the APR of FY 2013-14, Petitioner's submission and O&M now trued-up by the Commission.
Table 17: O&M Expenses approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Employee Expenses | 144.21 | 170.07 | 170.40 |
| 2 | Administrative & General Expenses (A&G) | 9.08 | 18.54 | 18.54 |
| 3 | Repair & Maintenance Expenses | 19.61 | 21.45 | 21.45 |
| Total Operation & Maintenance Expenses | 172.90 | 210.06 | 210.39 |
The Commission approves the Operation & Maintenance (O&M) expenses of Rs 210.39 Cr in
the True-up of FY 2013-14.
3.9. Capitalisation
Petitioner's submission
The Petitioner submitted the actual capitalisation for the FY 2013-14 as Rs 66.35 Cr against an approved capitalization of Rs 191.44 Cr
Commission's analysis:
The Commission with regards to capitalisation submitted by the Petitioner, sought details of the assets created out of Loan/Equity/Govt. Grant/Consumer Contribution etc. In reply, the Petitioner submitted that majority of capital assets are created out of the equity contribution from Govt. of Goa and the actual borrowing of loan is only to the extent of the R-APDRP scheme. The capitalization is inclusive of assets created out of the Electricity Development Fund which is treated as Government Grant. The Petitioner further submitted that no assets have been created out of Consumer Contribution.
It is observed that the capital expenditure and capitalisation achieved by the Petitioner is much lower than approved by the Commission in the APR Order. Lower capital expenditure signifies that enough efforts have not been undertaken in enhancing the reliability of supply to consumers. It also signifies that sufficient measures aren't being taken to provide electricity OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 supply to un-electrified areas and equipping the distribution infrastructure with the growing demand. Accordingly, the Commission directs the Petitioner to increase its efforts towards undertaking capital expenditure activities necessary for improving the service quality and targeting 24x7 supply to all consumers.
The Commission has examined the Fixed Asset Register (FAR) as submitted by the Petitioner in detail and accordingly approves the capitalisation as shown in the following table.
Table 18: Capitalisation approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | RAPDRP Scheme | - | 10.06 | 10.06 |
| 2 | Electricity Development Fund (EDF) | - | 20.00 | 20.00 |
| 3 | Other Plan Schemes | - | 36.29 | 36.29 |
| Total Capitalisation | 191.44 | 66.35 | 66.35 |
The Commission approves Capitalisation of Rs 66.35 Cr in the True-up of FY 2013-14.
3.10. Depreciation
Petitioner's submission
The Petitioner has submitted the actual depreciation of assets as per the audited annual accounts of FY 2013-14. The depreciation is arrived in annual accounts for FY 2013-14 based on the rates specified by the Commission in the Tariff Regulations, 2009.
The depreciation as claimed by the Petitioner has been tabulated in the table below:
Table 19: Depreciation submitted by Petitioner (In Rs Cr)
| S. No | Particulars | Petitioner's Submission |
| 1 | Opening Gross Fixed Assets | 816.84 |
| 2 | Addition During the FY | 66.35 |
| 3 | Adjustment/Retirement during the FY | 0.00 |
| 4 | Closing Gross Fixed Assets | 883.20 |
| Depreciation | 39.57 |
Commission's analysis
In respect of depreciation, the Commission has followed Regulation 26 of the Tariff Regulations, 2009, as under:
"26. Depreciation
(1) For the purpose of tariff, depreciation shall be computed in the following manner:
(i) The value base for the purpose of depreciation shall be the historical cost of the assets, that is
actual expenses limited to approved capital cost where such capital cost has been approved by
the Commission:
Provided that land is not a depreciable asset and its cost shall be excluded from the capital cost
while computing depreciation.
(ii) The historical cost of the asset shall include additional capitalization.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018(iii) The historical cost shall include foreign currency funding converted into equivalent rupees at
the exchange rate prevalent on the date when foreign currency was actually availed but not
later than the date of commercial operation.
(iv) Depreciation for generation and transmission assets shall be calculated annually as per
straight-line method over the useful life of the asset at the rate of depreciation specified by the
Central Electricity Regulatory Commission from time to time.
As per the norms specified in the Tariff Regulations, 2009 the Commission has verified the asset wise capitalisation of the Petitioner and has accordingly derived the weighted average rate of depreciation based on the asset wise depreciation rate prescribed in the CERC Tariff Regulations, 2009, given in the following table:
Table 20: Depreciation Rate (%)
| Description | Rate |
| Plant & Machinery | 5.28% |
| SCADA Centre | 5.28% |
| Testing & Measuring Equipment | 5.28% |
| Lines & Cables | 5.28% |
| Buildings | 3.34% |
| Vehicles | 9.50% |
| Furniture & Fixtures | 6.33% |
| Office Equipment | 6.33% |
| Computers & Others | 15.00% |
| Land | 0.00% |
Based on the above depreciation rates and the actual asset addition during the year the weighted average depreciation rate is computed as 5.27% against a rate of 5.28% approved in the APR Order. The Commission has not considered depreciation on assets created from the Electricity Duty Fund as the same has been treated as a Grant from the Government of Goa.
The Commission has calculated the depreciation on average Gross Fixed Assets (GFA) with the opening GFA considered equivalent to the closing GFA as approved in the True-Up of FY 2012-13, in the Order dated 23rd May, 2017. It is pertinent to mention here that the Commission had revised the GFA value in accordance with the Fixed Asset Register (FAR) of FY 2011-12 and FY 2012-13 while undertaking the True-up of the respective years. Accordingly, the Commission approves the GFA and Depreciation as per the revised opening balance of FY 2013-14. The following table provides the calculation of depreciation during the FY 2013-14:
Table 21: Depreciation approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Opening Gross Fixed Assets | 207.30 | 816.84 | 816.84 |
| 2 | Addition During the FY | 191.44 | 66.35 | 66.35 |
| 3 | Less: Addition on account of EDF/ Grant | 0.00 | 0.00 | 20.00 |
| 4 | Closing Gross Fixed Assets | 398.74 | 883.20 | 863.19 |
| 5 | Average Gross Fixed Assets | 303.02 | - | 840.02 |
| 6 | Weighted average Rate of Depreciation (%) | 5.28% | - | 5.27% |
| Depreciation | 16.00 | 39.57 | 44.29 |
The Commission approves depreciation of Rs 44.29 Cr in the True-up of FY 2013-14.
3.11. Interest and Finance Charges
Petitioner's submission
The Petitioner submitted that majority of capital assets are created out of the equity contribution from the Government of Goa. Interest on Loan has been estimated based on the normative loan calculation whereby 70% of the opening GFA and the capitalization during the year have been considered as normative debt. The Interest expense arrived is based on normative loan considered to the extent of capitalization during the year after deducting the Electricity Duty available as Grant.
Opening balance of normative loan for FY 2013-14 considered as per the approved normative loan in truing up of FY 2012-13. Further, the rate of interest has been considered as State Bank of India Prime Lending Rate (SBI PLR) of 14.45% (rate as on 1st April, 2013).
In addition to the above, the Petitioner has also claimed certain financial charges related to bank charges, LC charges, etc.
Commission's analysis:
Regulation 25 of the Tariff Regulations, 2009 states:
" 1) For existing loan capital interest and finance charges on loan capital shall be computed on
the outstanding loans, duly taking into account the rate of interest and schedule of repayment as
per the terms and conditions of relevant agreements.
2) Interest and finance charges on loan capital for new investments shall be computed on the
loans, duly taking into account the rate of interest and the schedule of repayment as per the
terms and conditions of relevant agreements. The rate of interest shall, however, be restricted to
the prevailing Prime Lending Rate of the State Bank of India.'' (Read SBI Advance Rate)
Further as per Regulation 23 of the said Tariff Regulations, 2009:
"23. Debt-Equity Ratio
1) For the purpose of determination of tariff, debt-equity ratio in case of existing, ongoing as well
as new projects commencing after the date of notification of these Regulations shall be 70:30.
Where equity employed is more than 30%, the amount of equity for the purpose of tariff shall be
limited to 30% and the balance amount shall be considered as loan. Where actual equity
employed is less than 30%, the actual debt and equity shall be considered for determination of
tariff:
2) Provided that the Commission may, in appropriate cases, consider equity higher than 30% for
the purpose of determination of tariff, where the generating company or the licensee is able to
establish to the satisfaction of the Commission that deployment of equity more than 30% is in the
interest of the general public.
3) The debt and equity amounts arrived at in accordance with sub-regulation (1) above shall be
used for all purposes including for determining interest on loan, return on equity, Advance
against Depreciation and Foreign Exchange Rate Variation:
4) Provided that in the case of an Integrated Utility, till the time it remains Integrated Utility, it
shall be entitled to return on its capital base as per Schedule VI to the repealed Electricity
(Supply) Act, 1948."
Accordingly, the Commission for the purpose of funding of the capitalisation has considered the normative debt-equity ratio of 70:30. The addition in loan has been considered with respect to OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 the total capitalization during the year excluding the assets created out of the Electricity Duty Fund.
The Commission for the purpose of calculation of Interest on Loan has considered an interest rate equivalent to the SBI PLR @ 14.45%, as on 1st April, 2013. The interest has been calculated on the average loan during the year with the opening loan considered equivalent to the closing loan approved in the True-Up of FY 2012-13. Repayment of the loan has been considered at 10% of the opening loan amount. Additionally, the Commission also allows expenditure towards financing charges as per actuals as reflected in the annual accounts.
The following table provides the Interest and Finance charges as approved by the Commission:
Table 22: Interest and Finance charges approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Opening Normative Loan | 136.29 | 148.07 | 148.07 |
| 2 | Add: Normative Loan during the year | 134.01 | 28.22 | 32.45 |
| 3 | Less: Normative Repayment equivalent to 10% of opening normative loan | 13.63 | 14.81 | 14.81 |
| 4 | Closing Normative Loan | 256.67 | 161.48 | 165.71 |
| 5 | Average Normative Loan | 196.48 | 154.78 | 156.89 |
| 6 | Rate of Interest (%) | 7.99% | 14.45% | 14.45% |
| 7 | Interest on Loan | 15.70 | 22.37 | 22.67 |
| 8 | Financing Charges | 1.00 | 1.48 | 1.48 |
| Interest and Finance Charges | 16.70 | 23.84 | 24.15 |
The Commission approves Interest and Finance Charges of Rs 24.15 Cr in the True-up of the
FY 2013-14
3.12. Return on Capital Base
Petitioner's submission
The Petitioner has calculated the return on capital base at 3%. The return is calculated on the Net Fixed Assets (NFA) considering Gross Block inclusive of Capital Works in Progress (CWiP) and thereby deducting the accumulated depreciation.
Commission's analysis:
Regulation 24 (1) of the JERC Tariff Regulations, 2009 with regards to Return in Equity specifies the following:
"Subject to the proviso to Regulation 23(2), Return on Equity shall be computed on the paid up
equity capital determined in accordance with Regulation 23 and shall be guided by the Central
Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004 as
amended by the CERC from time to time. The same principles will apply for distribution business
also as far as possible."
The Commission, similar to the methodology adopted in the True-ups of FY 2011-12 and FY 2012-13 in the Tariff Order of last year, has determined the Return on Capital Base based on the Gross Fixed Assets as approved above and the Opening Cumulative Depreciation as on 1st April, 2013, as reflected in the audited annual accounts. The table below shows the computation of the Return on Capital Base as approved in the APR Order, the Petitioner's submission and the Return now approved by the Commission.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Return on Capital Base approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Gross Fixed Assets at the beginning of FY | 207.30 | 1304.08 | 816.84 |
| 2 | Less: Opening accumulated depreciation as per annual audited accounts | 12.13 | 217.42 | 217.42 |
| 3 | Net Fixed Assets | 195.17 | 1086.66 | 599.42 |
| Return at 3% of NFA | 5.86 | 32.60 | 17.98 |
The Commission approves a Return on Capital Base as Rs 17.98 Cr in the True-up of FY
2013-14.
3.13. Interest on Security Deposits
Petitioner's submission
The Interest on Security Deposit calculated by the Petitioner on normative basis has been shown in the table below:
Table 23: Interest on Consumer Security Deposits submitted by Petitioner (In Rs Cr)
| S. No. | Particulars | Petitioner's Submission |
| 1 | Opening Security Deposit | 17.17 |
| 2 | Add: Deposits During the year | 8.26 |
| 3 | Less: Deposits refunded | 4.33 |
| 4 | Closing Security Deposit | 21.09 |
| 5 | Average Security Deposit | 19.13 |
| 6 | Rate of Interest (%) | 8.50% |
| 7 | Interest on Security Deposit | 1.63 |
| 8 | Interest paid to consumers | 0.00 |
The Petitioner has determined the Interest on Security Deposits on normative basis as per Tariff Regulations, 2009 but has not considered the same in the ARR as no interest has been paid to consumers in the FY 2013-14.
Commission's analysis:
As the Petitioner has not paid any Interest on Security Deposit to consumers, the Commission does not approve any Interest on Security Deposit in FY 2013-14. The following table provides the interest on security deposit as approved in the APR of FY 2013-14, the Petitioner's submission and the interest now approved by the Commission:
Table 24: Interest on Consumer Security Deposits approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Interest on Security Deposit | 5.42 | 0.00 | 0.00 |
The Commission approves Interest on Security Deposit as nil in the True-up of FY 2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20183.14. Interest on Working Capital
Petitioner's submission
The Petitioner has determined the Interest on Working Capital on normative basis considering sum of the following:
a. Power purchase cost.
b. Employees cost.
c. Administration & general expenses.
d. Repair & Maintenance expenses.
e. Sum of two months requirement for meeting Fuel cost.
The Interest Rate has been considered as SBI PLR as on 1stApril, 2013.
Commission's analysis:
As per Regulation 29 of the Tariff Regulations, 2009:
"(3) Subject to prudence check, the working capital for integrated utility shall be the sum of one
month requirement for meeting:
a. Power purchase cost.
b. Employees cost.
c. Administration & general expenses.
d. Repair & Maintenance expenses.
e. Sum of two month requirement for meeting Fuel cost.
5) The rate of interest on working capital shall be equal to the short term Prime Lending Rate of
State Bank of India on the 1st April of the relevant financial year. The interest on working capital
shall be payable on normative basis notwithstanding that the generating company/licensee has
not taken working capital loan from any outside agency or has exceeded the working capital
loan amount worked out on the normative figures."
The Commission has considered the calculation of the different components of the Working Capital on the basis of the stipulated norms. The Commission has deducted average consumer security deposit from the Working Capital requirement as reflected in the audited annual accounts of FY 2013-14. The Commission has considered the SBI PLR as applicable on 1st April, 2013. Accordingly, the Interest on Working Capital has been calculated, as shown in the table below:
Table 25: Interest on Working Capital approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Power Purchase Cost for one month | 77.09 | 89.87 | 88.90 |
| 2 | Employee Cost for 1 month | 12.02 | 14.17 | 14.20 |
| 3 | A&G Cost for 1 month | 0.76 | 1.55 | 1.55 |
| 4 | R&M Cost for 1 month | 1.63 | 1.79 | 1.79 |
| 5 | Total Working Capital for 1 month | 91.50 | 107.38 | 106.44 |
| 6 | Average Security Deposit | 64.95 | 17.17 | 19.13 |
| 7 | Total Working Capital considered for 1 month | 26.55 | 90.21 | 87.31 |
| 8 | SBI PLR | 14.45% | 14.45% | 14.45% |
| Interest on Working Capital | 3.84 | 13.04 | 12.62 |
The Commission approves the Interest on Working Capital as 12.62 Cr in the True-up of FY
2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20183.15. Provision for Bad & Doubtful Debts
Petitioner's submission
The Petitioner submitted that it has created a provision of Rs 2.96 Cr towards Bad and Doubtful Debts in the annual accounts of FY 2013-14.
Commission's analysis:
As specified in Regulation 28 of the Tariff Regulations, 2009 (to be read with the format):
"The Commission may, after the generating company/licensee gets the receivables audited,
allow a provision for bad debts up to 1% of receivables in the revenue requirement of the
generating company/licensee."
It is observed that as per the audited accounts, the licensee has not written off any amount in the FY 2013-14. Therefore, the Commission does not approve any amount under the provision for bad and doubtful debts.
The Commission approves nil provision of Bad & Doubtful Debts in the True-up of
FY 2013-14.
3.16. Non-Tariff Income (NTI)
Petitioner's submission
The Petitioner submitted NTI of Rs 17.02 Cr in the True-Up of FY 2013-14 against Rs 22.55 Cr approved by the Commission in the ARR for FY 2013-14. The Non–Tariff Income as submitted by the Petitioner has been shown in the table below:
Table 26: Non-Tariff Income as submitted by Petitioner (In Rs Cr)
| S. No. | Particulars | Petitioner's Submission |
| 1 | Meter Rent | 3.81 |
| 2 | Revenue from Power Exchange | 0.75 |
| 3 | Misc./Other Receipts | 11.94 |
| 4 | Income from trading of Power | 0.52 |
| Total | 17.02 |
Commission's analysis:
The Commission has authenticated the submission of the Petitioner from the audited accounts and found the same to be correct. Further, the Commission as discussed while truing up the Power Purchase Cost had considered the revenue from Trading of Power and Power Exchange as part of the Power Purchase Cost. Accordingly, the Commission approves the same remaining NTI as submitted by the Petitioner. The NTI approved in the APR Order, Petitioner's submission and now approved by the Commission is shown in the table below:
Table 27: Non-Tariff Income approved by Commission (In Rs Cr)
| S. No | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Meter Rent | - | 3.81 | 3.81 |
| 2 | Revenue from Power Exchange | - | 0.75 | - |
| 3 | Misc./Other Receipts | - | 11.94 | 11.94 |
| 4 | Income from trading of Power | - | 0.52 | - |
| Total | 23.22 | 17.02 | 15.76 |
The Commission approves Non-Tariff Income of Rs 15.76 Cr in the True-up of FY 2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20183.17. Revenue from Sale of Surplus Power
Petitioner's submission
The Petitioner has earned a revenue of Rs 10.34 Cr from sale of surplus power/UI Underdrawal.
Commission's analysis:
The Commission as discussed while approving the Power Purchase Cost has considered the revenue from sale of surplus power/UI Underdrawal along with the Total Power Purchase Cost due to its inherent nature.
The revenue from sale of surplus power/UI Underdrawal as approved in the APR Order, Petitioner's submission and now trued-up by the Commission is shown in the following table:
Table 28: Non-Tariff Income approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Revenue from sale of surplus power/UI Underdrawal | 8.38 | 10.34 | 10.34 |
The Commission approves Rs 10.34 as revenue from sale of surplus power/ UI Overdrawal
and has considered the same along with the Total Power Purchase cost approved in the
True-up of FY 2013-14.
3.18. Aggregate Revenue Requirement (ARR)
Petitioner's submission
Based on the expenses as detailed above, the net aggregate revenue requirement of Rs 1373.50 Cr is submitted for approval in the True-up of FY 2013-14.
Commission's analysis
The Commission on the basis of the detailed analysis of the cost parameters of the ARR has considered and approved the revenue requirement in the True-up of FY 2013-14 as given in the following table:
Table 29: Aggregate Revenue Requirement approved by Commission for FY 2013-14 (In Rs Cr)
| S. No | Particulars | Approved in APR Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Power Purchase Cost | 933.41 | 1078.46 | 1066.85 |
| 2 | Provision for RPO Compliance | 29.42 | ||
| 3 | Operation & Maintenance Expenses | 172.90 | 210.06 | 210.39 |
| 4 | Depreciation | 16.00 | 39.57 | 44.29 |
| 5 | Interest and Finance charges | 16.70 | 23.84 | 24.15 |
| 6 | Interest on Working Capital | 3.84 | 13.04 | 12.62 |
| 7 | Interest on Security Deposit | 5.42 | 0.00 | 0.00 |
| 8 | Return on Equity | 5.86 | 32.60 | 17.98 |
| 9 | Provision for Bad Debt | 0.00 | 2.96 | 0.00 |
| 10 | Other Expenses | 0.56 | 0.33 | 0.00 |
| 12 | Total Revenue Requirement | 1184.11 | 1400.86 | 1376.27 |
| 13 | Less: Non-Tariff Income | 22.55 | 17.02 | 15.76 |
| 14 | Revenue from sale of surplus power/UI Overdrawal | 8.38 | 10.34 | -* |
| Net Revenue Requirement | 1153.17 | 1373.50 | 1360.51 | |
| *Adjusted in Power Purchase Cost |
The Commission approves net Aggregate Revenue Requirement of Rs 1360.51 Cr in the
True-up of FY 2013-14.
3.19. Revenue at existing Retail Tariff
Petitioner's submission
The Petitioner has submitted the net actual revenue for the FY 2013-14 as Rs 1060.29 Cr against revenue of 990.86 Cr approved by the Commission in the APR Order. The table below provides the revenue at existing tariff as submitted by the Petitioner:
Table 30: Revenue at existing tariff submitted by the Petitioner for FY 2013-14 (In Rs Cr)
| S. No | Category | Sales (MU) | Total Revenue (Rs Cr) | ABR (Rs/kwh) |
| A. LOW TENSION SUPPLY | ||||
| 1 | LTD/Domestic | 844.23 | 172.74 | 2.05 |
| 2 | LTD/L.I.G. | 8.26 | 1.15 | 1.39 |
| 3 | LTD Domestic Mixed | 5.00 | 1.67 | 3.34 |
| 4 | LTC/Commercial | 280.97 | 119.86 | 4.27 |
| 5 | LTP/Motive Power | 74.41 | 26.85 | 3.61 |
| 6 | LTP Mixed (Hotel Industries) | 4.73 | 2.62 | 5.54 |
| 7 | LTP Ice Manufacturing | 8.00 | 2.60 | 3.25 |
| 8 | LTAG/Agriculture | 17.76 | 3.20 | 1.80 |
| 9 | LTPL ( Public lighting ) | 37.23 | 13.39 | 3.60 |
| 10 | LTPWW/Public Water works | 2.08 | 0.99 | 4.78 |
| 11 | LT Temporary | 17.89 | 13.33 | 7.45 |
| Sub-Total | 1300.57 | 358.39 | 2 . 76 | |
| B. HIGH TENSION SUPPLY | ||||
| 12 | HT ( Mixed ) | 117.88 | 52.15 | 4.42 |
| 13 | HTI (Industrial) Ferro Metallurgical/ /Steel Melting/Power Intensive | 517.37 | 193.00 | 3.73 |
| 14 | HTI Industrial | 619.33 | 239.96 | 3.87 |
| 15 | HTAG ( Agriculture) | 6.09 | 1.35 | 2.22 |
| 16 | EHTI ( Industrial ) | 142.55 | 56.82 | 3.99 |
| 17 | HT P.W.W. & Sewage system | 138.12 | 69.50 | 5.03 |
| 18 | HT. M.E.'s Defence Estt. | 26.66 | 9.70 | 3.64 |
| 19 | HTI ( Steel Rolling ) | 69.02 | 28.04 | 4.06 |
| 20 | HTI/IT High Tech | 66.23 | 24.43 | 3.69 |
| 21 | HTI/Ice Manufacturing | 0.85 | 0.33 | 3.87 |
| 22 | Sale from EDG to GSPL (Div. VII) | 8.70 | 3.61 | 4.15 |
| 23 | HTI Hotel Industry | 57.11 | 22.93 | 4.01 |
| 24 | HT Temporary | 0.06 | 0.08 | 11.56 |
| Sub-Total | 1769.99 | 701.90 | 3 . 97 | |
| Total | 3070.56 | 1060.29 | 3.45 |
Commission's analysis
The Commission has verified revenue from the sale of power within the State in the FY 2013-14 from the audited accounts.
The category-wise revenue as approved in the APR Order, the Petitioner's submission and the revenue now Trued-up by the Commission is shown in the following table:
Table 31: Revenue at existing tariff approved by Commission for FY 2013-14 (In Rs Cr)
| S. No. | Category | Approved in APR Order | Petitioner's Submission | Now Approved by Commission |
| A. LOW TENSION SUPPLY | ||||
| 1 | LTD/Domestic | 152.00 | 172.74 | 172.74 |
| 2 | LTD/L.I.G. | 0.73 | 1.15 | 1.15 |
| 3 | LTD Domestic Mixed | 2.00 | 1.67 | 1.67 |
| 4 | LTC/Commercial | 100.00 | 119.86 | 119.86 |
| 5 | LTP/Motive Power | 33.00 | 26.85 | 26.85 |
| 6 | LTP Mixed (Hotel Industries) | 1.99 | 2.62 | 2.62 |
| 7 | LTP Ice Manufacturing | 2.50 | 2.60 | 2.60 |
| 8 | LTAG/Agriculture | 2.71 | 3.20 | 3.20 |
| 9 | LTPL ( Public lighting ) | 6.61 | 13.39 | 13.39 |
| 10 | LTPWW/Public Water works | 1.47 | 0.99 | 0.99 |
| 11 | LT Temporary | 9.11 | 13.33 | 13.33 |
| Sub-Total | 312.12 | 358.39 | 358.39 | |
| B. HIGH TENSION SUPPLY | ||||
| 12 | HT ( Mixed ) | 47.14 | 52.15 | 52.15 |
| 13 | HTI (Industrial) Ferro Metallurgical/ Steel Melting/Power Intensive. | 188.00 | 193.00 | 193.00 |
| 14 | HTI Industrial | 262.36 | 239.96 | 239.96 |
| 15 | HTAG ( Agriculture) | 0.89 | 1.35 | 1.35 |
| 16 | EHTI ( Industrial ) | 70.48 | 56.82 | 56.82 |
| 17 | HT P.W.W. & Sewage system | 48.47 | 69.50 | 69.50 |
| 18 | HT. M.E.'s Defence Estt. | 8.86 | 9.70 | 9.70 |
| 19 | HTI ( Steel Rolling ) | 29.00 | 28.04 | 28.04 |
| 20 | HTI/IT High Tech | 23.25 | 24.43 | 24.43 |
| 21 | HTI/Ice Manufacturing | 0.21 | 0.33 | 0.33 |
| 22 | Sale from EDG to GSPL (Div. VII) | - | 3.61 | 3.61 |
| 23 | HTI Hotel Industry | - | 22.93 | 22.93 |
| 24 | HT Temporary | 0.08 | 0.08 | 0.08 |
| Sub-Total | 678.74 | 701.90 | 701.90 | |
| Total | 990.86 | 1060.29 | 1060.29 |
The Commission approves the revenue from the sale of power as Rs 1060.29 Cr in the
True-up of the FY 2013-14.
3.20. Standalone Revenue Gap/Surplus
Petitioner's submission
Based on the ARR submitted and the revenue from retail tariff, the standalone revenue gap of Rs 313.21 Cr is arrived at in the True-up of FY 2013-14.
Commission's analysis
The Commission, based on the approved ARR and the retail tariff has arrived at the Revenue Gap/Surplus as follows:
Table 32: Standalone Revenue Gap/Surplus approved by Commission for FY 2013-14
(In Rs Cr)
| S. No | Particulars | Approved in APR Order | Petitioner's Submission | Trued-up by Commission |
| 1 | Net Revenue Requirement | 1153.17 | 1373.50 | 1360.51 |
| 2 | Total Revenue | 1014.05* | 1060.29 | 1060.29 |
| Net Gap/(Surplus) | 139.12 | 313.21 | 300.22 | |
| *Inclusive of FPPCA of Rs. 23.19 Cr. |
The Commission, in the True-up of FY 2013-14 approves a standalone gap of Rs 300.22 Cr.
The Petitioner has submitted that the entire gap for the FY 2013-14 is committed to be
funded by the Government of Goa by way of budgetary support. The Petitioner in this
regard had submitted the letter dated 1st March, 2013 from the Government of Goa wherein
the Govt. had assured that it would provide the requisite budgetary support to meet the
deficit at the existing tariff for the FY 2013-14. In view of the budgetary support for the FY
2013-14 from the Government of Goa, the Commission approves Nil net revenue gap in the
True-up for the FY 2013-14.
4. Chapter 4: True-up of the FY 2014-15, FY 2015-16 and FY 2016-17
4.1. Applicable provisions of JERC for the State of Goa and Union Territories (Terms and
Conditions for Determination of Tariff) Regulations, 2009
The True-ups of FY 2014-15 and FY 2015-16 are to be carried out as per Regulation 8 (2) of the Tariff Regulations, 2009:
(2) (i) After audited accounts of a year are made available, the Commission shall undertake
similar exercise as above with reference to the final actual figures as per the audited accounts.
This exercise with reference to audited accounts shall be called 'Truing Up'.
(ii) The Truing Up for any year will ordinarily not be considered after more than one year of
'Review'.
(3) The revenue gap of the ensuing year shall be adjusted as a result of review and truing up
exercises.
(4) While approving such expenses/revenues to be adjusted in the future years as arising out of
the Review and/or Truing up exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenues. Carrying costs shall be limited to the
interest rate approved for working capital borrowings.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018(5) For any revision in approvals, the licensee would be required to satisfy the Commission that
the revision is necessary due to conditions beyond its control.
(6) In case additional supply is required to be made to any particular category, the licensee may,
any time during the year make an application to the Commission for its approval. The
application will demonstrate the need for such change of consumer mix and additional supply of
power and also indicate the manner in which the licensee proposes to meet the cost for such
change of consumer mix and additional supply of power.
(7) The Commission may consider granting approval to such proposals provided the cost of
additional supply is ordinarily met by the beneficiary category."
The True-up of FY 2016-17 the 1st year of the MYT Control Period, is to be carried out as per Regulation 8 (2) of the MYT Regulations, 2014:
"8. Annual Review of Performance and True-up
(2) After audited accounts of a year are made available, the Commission shall undertake similar
exercise as above with reference to the final actual figures or the provisional actual accounts as
available as per the audited accounts. This exercise with reference to audited accounts shall be
called 'Truing Up'.
The Truing Up for any year will ordinarily not be considered after more than one year of 'Review'.
(3) The revenue gap/surplus, if any, of the ensuing year shall be adjusted as a result of review
and truing up exercises.
(4) While approving such expenses/revenue to be adjusted in the future years as arising out of
the Review and/or Truing up exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenue. Carrying costs shall be limited to the
interest rate approved for working capital borrowings.
(5) For any revision in approvals, the licensee would be required to satisfy the Commission that
the revision is due to conditions beyond its control.
(6) In case additional supply is required to be made to any particular category, the licensee may,
any time during the year make an application to the Commission for its approval. The
application will demonstrate the need for such additional supply of power and also indicate the
manner in which the licensee proposes to meet the cost for such additional supply of power.
4.2. Approach for the True-up of the FY 2014-15 and FY 2015-16 and FY 2016-17
Petitioner's submission:
The Petitioner submitted that the finalization of audited accounts for the FY 2014-15 and FY 2015-16 is in process and the Commission shall be approached for truing-up at a later date when the audited accounts are available. Further, the provisional figures are available for FY 2016-17 and the finalization of accounts is under process. Based on the provisional accounts, the Petitioner has requested to approve the provisional actual figures of the FY 2016-17 for determination of ARR & Revenue gap and treatment thereof.
Commission's analysis:
The Commission notes that the Petitioner has not submitted the audited accounts prepared on commercial principles for the FY 2014-15, FY 2015-16 and FY 2016-17. The Commission in its previous Orders had stressed upon the requirement of the audited accounts to bring in more accuracy in the estimates made by the Commission. The Tariff Regulations, 2009 and MYT Regulations, 2014 also require the licensee to file the True up along with the audited accounts in the filing.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018The Commission now directs the Petitioner to prepare and submit the audited accounts from the FY 2014-15 onwards based on commercial principles along with the True-up Petitions by 30th November 2018.
The True-up would therefore be taken up only after submission of the audited accounts. Accordingly, the Commission has decided not to consider True-up for the FY 2014-15, FY 2015-16 and FY 2016-17 in the current Order.
5. Chapter 5: Annual Performance Review of FY 2017-18
5.1. Background
The Tariff Order for the FY 2017-18 was issued by the Commission on 23rd May, 2017 approving the Aggregate Revenue Requirement (ARR) and tariff for the FY 2017-18. The Annual Performance Review for the FY 2017-18 is to be carried out in accordance with the Regulation 8 of the JERC for the State of Goa and Union Territories (except Delhi) (Multi-Year Distribution Tariff) Regulations, 2014:
"(1) The Commission shall undertake a review along with the next Tariff Order of the expenses
and revenue approved by the Commission in the Tariff Order. While doing so, the Commission
shall consider variations between approvals and revised estimates/actuals of sale of electricity,
income and expenditure for the relevant year and permit necessary adjustments/changes in case
such variations are for adequate and justifiable reasons. Such an exercise shall be called
'Review'.
……(3) The revenue gap/surplus, if any, of the ensuing year shall be adjusted as a result of
review and truing up exercises.
(4) While approving such expenses/revenue to be adjusted in the future years as arising out of
the Review and/or Truing-up exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenue. Carrying costs shall be limited to the
interest rate approved for working capital borrowings.
(5) For any revision in approvals, the licensee would be required to satisfy the Commission that
the revision is due to conditions beyond its control.
(6) In case additional supply is required to be made to any particular category, the licensee may,
any time during the year make an application to the Commission for its approval.
The application will demonstrate the need for such additional supply of power and also indicate
the manner in which the licensee proposes to meet the cost for such additional supply of
power."
5.2. Approach for the Review for the FY 2017-18
Petitioner's submission:
The Petitioner has submitted the APR of FY 2017-18 based on the actual performance during the H1 (April-September 2017) of the year and the revised estimates for H2 (October 2017- -March 2018) of the year. The projections for H2 of FY 2017-18 are arrived at by expected escalation over performance of H1.
Commission's analysis:
The Commission for the purpose of estimating the energy demand of the State sought the information of historical sales, number of consumers and connected load of the previous 5 years till FY 2017-18 (till December 2017) from the Petitioner. The Petitioner was also asked to provide OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 month on month information for the last 3 years from FY 2014-15 to FY 2016-17. Various anomalies and gaps are observed in the data provided, which are listed as follows:
• Data on Energy Sales, Number of Consumers and Connected Load for FY 2015-16 was not submitted.
• Overall Energy Sales were reducing by almost 26% in March 2017 vis-à-vis February 2017.
• Energy sales for Domestic category were submitted as 0.49 MU in March 2017 vis-à-vis average of ~65 MU in earlier months.
• Energy Sales submitted for FY 2014-15 were observed to be higher than FY 2016-17 by almost ~400 MU.
From the various discrepancies as shown above, it is evident that the base data for projecting the energy sales for FY 2017-18 is not reliable.
In the Technical Validation Session (TVS) held at the Commission's office, the Petitioner was asked to submit justifications for these discrepancies. The Petitioner submitted that there were issues related to billing of energy to consumers for a few months in H2 of FY 2015-16 due to changeover of the billing agencies and the transition period thereof. The primary problem was non-billing in certain months of FY 2015-16 and adjustment of the same in FY 2016-17 resulting in lower billing than what should have been in FY 2015-16 and higher billing in FY 2016-17. The Petitioner further submitted that the meter reading and billing was maintained by different agencies separately in each division, and each agency had its separate logic for bill calculation and bill generation. However, now a common agency has taken over all the billing and collection data for HT and LT consumers and a common process is followed for all the divisions to avoid ambiguity in the process and data. While the process is streamlined, a lot of errors in the legacy data have been discovered and the error rectification process is going on.
The Petitioner was asked to provide the segregated quantum of month on month sales, however, the Petitioner expressed its inability to provide this segregated information at this stage as the information is present in the form of software dump and the analysis and segregation of the information will take considerable time.
The Commission is of the view that due to this distortion observed in energy sales, it is not possible to project the energy sales for FY 2017-18 as no definite trends can be observed. It is not prudent to approve the revised power purchase requirement and revenue from retail sale on the basis of the unreliable information presently available. Therefore, the Commission shall consider the actual performance at the time of the True-up of the FY 2017-18 once the audited accounts are submitted by the Petitioner.
Accordingly, the Commission has decided not to consider the Annual Performance Review of the FY 2017-18.
Chapter 6: Determination of Aggregate Revenue Requirement for the FY 2018-19
6.1 Background
The ARR for FY 2018-19 was approved in the MYT Order issued for the 1st Control Period (FY 2016-17 to FY 2018-19). In this Chapter the Commission determines the Aggregate Revenue Requirement (ARR) for the FY 2018-19 based on the actual information available for the previous years and the various norms defined in the MYT Order. The determination of Aggregate Revenue Requirement for the FY 2018-19 is to be carried out as per the following provisions of Regulation 6 of the JERC for the State of Goa and Union Territories (except Delhi) (Multi-Year Distribution Tariff) Regulations, 2014:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018"6. ARR Forecast
6.1 The applicant shall, based on the Business Plan as approved by the Commission by Order,
submit the forecast of Aggregate Revenue Requirement and expected revenue from tariff, for the
Control Period by a Petition in accordance with the JERC (Terms & Condition for determination
of Tariff) Regulations, 2009 by 30th November of the year prior to the commencement of the
Control Period and accompanied by such fee payable, as specified in the JERC (Conduct of
Business) Regulations, 2009.
6.2 The forecast of Aggregate Revenue Requirement shall be developed using the assumptions
relating to the behaviour of individual variables that comprise the Aggregate Revenue
Requirement during the Control Period.
6.3 The forecast of expected revenue from tariff and charges shall be developed based on the
following:
(a) Estimates of quantum of electricity to be supplied to consumers and wheeled on behalf of
Distribution System Users for each financial year within the Control Period; and
(b) Prevailing tariff as at the date of making the application."
6.2. Approach for determination of ARR for the FY 2018-19
The Petitioner has submitted the same ARR for the FY 2018-19 as approved in the MYT Order dated 18th April, 2016 along with an additional provision of Interest on Security Deposit. The Petitioner has computed revenue from the sale of power on the basis of the Retail Tariff approved by the Commission in the Tariff Order for FY 2017-18. As the Commission is not undertaking any review for the FY 2017-18 for the reasons detailed in the previous chapter, the Commission is retaining the projections and consequently costs for the FY 2018-19 at the same level as approved in the MYT Order dated 18th April, 2016 excluding the power purchase cost.
The Commission believes that the projections of Power Purchase Quantum and Cost approved in the MYT Order were based on historical trends and figures. Since the majority of the power procured by the Petitioner is from Central Generating Stations, it is prudent to revise the Power Purchase Cost based on the latest Tariff Orders issued by the Central Electricity Regulatory Commission (CERC) for the Control Period FY 2014-15 to FY 2018-19. Accordingly, the Commission has determined the revised Power Purchase Cost based on the same energy sales and Intra-State T&D loss as approved in the MYT Order for FY 2018-19. Resultantly, the Commission has also determined the Renewable Purchase Obligation (RPO) and the Interest on Working Capital which are dependent on the Power Purchase Cost. The Commission has determined the revenue from sale of power based on the approved energy sales, number of consumers and connected load in the MYT Order for FY 2018-19 to calculate the revenue gap for the year.
6.3. Projection of Number of consumers, Connected Load and Energy Sales Petitioner's
Submission
The Petitioner has considered the same number of consumers, connected load and energy sales as approved in the MYT Order.
Commission's Analysis
The Commission for the reasons as discussed above approves the same number of consumers, connected load and energy sales as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 33: No. of Consumer, Connected Load and Energy Sales approved by Commission
| Description | No. of Consumers | Connected Load (kW/kVA) | Energy Sales (MU) |
| LTD/Domestic | 496725 | 1429336 | 984.51 |
| LT-LIG/Low Income Group | 3049 | 338 | 1.10 |
| Low Tension-DM/LT-DM | 4399 | 13044 | 14.84 |
| LTC/Commercial | 92869 | 282941 | 325.42 |
| LTI/Industrial | 6466 | 115580 | 137.42 |
| LT Mixed/LT-P Hotel Industries | 233 | 4285 | 5.31 |
| Low Tension-AG/LT-AGP (Pump Sets/Irrigation) | 10821 | 34481 | 23.86 |
| LT Temporary | 2581 | 1098 | 22.08 |
| HTD Domestic | 2 | 193 | 0.28 |
| HTC Commercial | 117 | 42567 | 79.05 |
| HTI Industrial | 651 | 417220 | 1398.09 |
| High Tension-Ferro/SM/PI/SR | 37 | 114756 | 582.70 |
| High Tension-AG/HT-AGP (Pump Sets/Irrigation) | 41 | 8378 | 6.08 |
| Military Engineering Services/defense Establishments | 12 | 7080 | 26.89 |
| Public Lighting | 2740 | 9598 | 36.95 |
| Hoardings/Signboards | 104 | 35 | 0.35 |
| Total | 620848 | 2480929 | 3644.93 |
The Commission approves Number of consumers as 620847, Connected Load as 2480929
kW/kVA and Energy Sales as 3644.93 MU in the ARR of FY 2018-19
6.4. Energy savings under Domestic Efficiency Lamp Programme (DELP)
Petitioner's Submission
The Petitioner has considered the same energy savings under DELP as approved by the Commission in the MYT Order.
Commission's analysis
The Commission in the ARR of FY 2018-19 considers the same energy savings as approved in the MYT Order.
Table 34: Energy Savings under DELP (MU)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Energy savings under DELP | 78.60 | 78.60 | 78.60 |
The Commission approves Energy Savings of 78.60 MU in the ARR of FY 2018-19.
6.5. Inter-State Transmission Loss
Petitioner's Submission
The Petitioner has considered the same Inter-State Transmission Loss as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Commission's analysis
The Commission in the ARR of FY 2018-19 considers the Inter-State Transmission loss levels same as approved in the MYT Order.
Table 35: Inter-State Transmission Loss (%)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | For Stations in Western Region (WRPC) | 3.66% | 3.66% | 3.66% |
| 2 | For Stations in Southern Region (SRPC) | 7.50% | 7.50% | 7.50% |
The Commission approves Inter–State Transmission Loss of 3.66% for power received from
stations of Western Region and 7.50% for power received from stations of Southern Region
in the ARR of FY 2018-19.
6.6. Intra-State Transmission and Distribution (T&D) loss
Petitioner's Submission
The Petitioner has considered the same Intra-State T&D Loss as approved in the MYT Order.
Commission's analysis
The Commission approves the Intra-State T&D loss at the same level as approved in the MYT Order.
The following table provides the Intra-State T&D loss approved in the MYT Order, the Petitioners submission and T&D Loss now approved by the Commission.
Table 36: Intra-State T&D loss (%)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Intra-State distribution loss | 10.75% | 10.75% | 10.75% |
The Commission approves Intra-State T&D loss of 10.75% in the ARR of FY 2018-19.
6.7. Power Purchase Quantum & Cost
Petitioner's Submission
The Petitioner has considered the same power purchase cost as approved by the Commission in the MYT Order for FY 2018-19.
Commission's Analysis
The Commission has projected the power purchase quantum and cost for FY 2018-19 based on the actual monthly power purchase data for 9 months of FY 2017-18 and 12 months data for FY 2016-17, FY 2015-16 and FY 2014-15, as submitted by the Petitioner. For projecting availability of power, firm allocation from various generating stations has been considered. The source wise methodology followed for projecting the quantum and cost of power procurement has been detailed below:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20186.7.1. Availability of power
Availability of energy from NTPC and NPCIL stations:
• The energy availability from all the NTPC and NPCIL stations have been done based on average Plant Load Factor (PLF) of the respective stations in the last 4-5 years depending on the status of operation of the plant during the year.
• The energy availability from Kawas Gas Power Plant (KGPP) and Jhanor-Gandhar Power Plant (JGPP) has been estimated based on the average PLF of the plant during first 9 months of FY 2017-18.
• No energy has been projected from Kakrapara Atomic Power Station (KAPS) as no energy has been scheduled from April-December 2017 as the plant is shutdown for maintenance.
Availability of energy from Co-Generation Plants:
• The energy availability from all the Co-Generation plants namely Vedanta Plant-1, Vedanta Plant-2 and Goa Sponge Pvt. Ltd. has been considered the same as in FY 2016-17 based on the provisional data submitted by the Petitioner.
Availability of energy from Renewable Energy Stations:
• The energy availability from Renewable Energy Plants namely NVVNL Hydro, SECI, and NVVNL Solar have been estimated based on the average PLF achieved by the plants in the first 9 months of FY 2017-18.
Availability from Ratnagiri Gas Power Plant (RGPPL):
• The State of Maharashtra (which has 95% share allocation from RGPPL) is not scheduling power because of non-availability of natural gas and hence non-availability of technical minimum schedule to run the plant. For the period from April-December 2017, no power was purchased. Therefore, the Commission has not considered any availability of power from this station.
Availability of energy from New Stations
• It is expected that the Kameng Hydro Electric Plant (HEP) of NEEPCO will achieve COD by the starting of FY 2018-19. Accordingly, the Commission has considered the energy availability from this station based on parameters notified in the CERC Tariff Regulations, 2014.
Availability of energy from Open Market/Unscheduled Interchange
• The energy deficit/surplus for the FY 2018-19, as discussed in the section on energy balance later in the Order, has been assumed to be purchased/sold in the open market.
• No power has been projected under UI Under-drawal/Over-drawal.
6.7.2. Power Purchase Cost
Variable Charges:
• The per unit variable costs have been computed by taking the average of the actual per unit variable cost during the months of October-December 2017 for all the stations.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018• For procurement of power from the Open Market, the Average Round the Clock (RTC) rate for the Western Region during the calendar year 2017 has been considered.
Fixed Charges:
• The fixed costs for CGS have been considered based on the Tariff Orders issued by the CERC for the respective Central Generating Stations.
• For Cogeneration and Renewable Energy Stations, the tariff has been considered as per the PPA's and Tariff Orders of respective stations.
• The fixed cost has been apportioned on the basis of the Petitioner's share in each station and the average annual plant availability factor achieved during the last five years by the plant.
• For new stations, since no source specifying the tariff is available in the public domain, the Commission has considered an average rate of Rs 5.00/kwh.
Other Charges:
No other charges have been considered for the FY 2018-19.
6.7.3. Transmission Charges
The Commission has projected the transmission charges payable to PGCIL based on the total capacity of the transmission network allocated to the Petitioner.
The transmission charges are determined based on the latest quarterly Point of Connection (PoC) rates approved by the Central Electricity Regulatory Commission (CERC) in accordance with Regulation 17(2) of the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010.
6.7.4. Total Power Purchase Quantum and Cost
The following table provides the Power Purchase Quantum and cost approved by the Commission for FY 2018-19:
Table 37: Power Purchase Quantum (MU) and cost (Rs Cr) approved by Commission
| Details of the stations | Power Purchase at Generator Periphery (MU) | Power Purchase at UT periphery (after adjusting ISTS Losses) (MU) | Fixed Charges (Rs Cr) | Variable Charges (Rs Cr) | Total (Rs Cr) | Avg. Rate (@ State Periphery) (Rs/kwh) |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| NTPC | ||||||
| KSTPS | 1579.30 | 1521.49 | 101.50 | 183.72 | 285.22 | 1.87 |
| VSTPS - I | 257.32 | 247.90 | 21.90 | 38.25 | 60.15 | 2.43 |
| VSTPS - II | 95.62 | 92.12 | 6.83 | 13.31 | 20.15 | 2.19 |
| VSTPS - III | 81.96 | 78.96 | 8.84 | 11.41 | 20.25 | 2.56 |
| VSTPS - IV | 95.62 | 92.12 | 15.47 | 13.35 | 28.82 | 3.13 |
| VSTPS - V | 45.08 | 43.43 | 7.70 | 6.33 | 14.03 | 3.23 |
| KGPP | 46.71 | 45.00 | 7.68 | 15.21 | 22.89 | 5.09 |
| GGPP | 60.92 | 58.69 | 9.74 | 20.90 | 30.63 | 5.22 |
| SIPAT - I | 177.86 | 171.35 | 23.35 | 20.69 | 44.04 | 2.57 |
| KSTPS - III | 46.40 | 44.70 | 6.11 | 5.31 | 11.42 | 2.55 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| RSTPS | 724.88 | 670.51 | 50.53 | 172.30 | 222.84 | 3.32 |
| SIPAT- II | 83.51 | 80.46 | 10.38 | 9.97 | 20.34 | 2.53 |
| Mouda II | 44.72 | 43.08 | 14.46 | 11.00 | 25.46 | 5.91 |
| Mouda | 34.85 | 33.57 | 18.48 | 8.78 | 27.26 | 8.12 |
| Solapur | 81.49 | 78.50 | 17.47 | 23.51 | 40.98 | 5.22 |
| Sub Total – NTPC | 3456.23 | 3301.90 | 320.43 | 554.05 | 874.48 | 2.65 |
| RGPPL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| NPCIL | ||||||
| KAPS | 0.00 | 0.00 | - | 0.00 | 0.00 | 0.00 |
| TAPS | 87.33 | 84.14 | - | 25.59 | 25.59 | 3.04 |
| Sub Total NPCIL | 87.33 | 84.14 | - | 25.59 | 25.59 | 3.04 |
| Within State Generations | ||||||
| Vedanta Plant-1- Co-Gen | 96.28 | 96.28 | - | 23.11 | 23.11 | 2.40 |
| Vedanta Plant-2- Co-Gen | 75.21 | 75.21 | - | 18.05 | 18.05 | 2.40 |
| Goa Sponge and Private Limited | 5.82 | 5.82 | - | 1.40 | 1.40 | 2.40 |
| Sub Total – Within State Generation | 177.31 | 177.31 | - | 42.55 | 42.55 | 2.40 |
| RPO | ||||||
| NVVNL Solar | 10.98 | 10.57 | - | 8.45 | 8.45 | 7.99 |
| SECI Solar | 49.52 | 47.71 | - | 26.24 | 26.24 | 5.50 |
| Solar-REC | - | - | - | 11.46 | 11.46 | - |
| Non Solar-REC | - | - | - | 28.89 | 28.89 | - |
| Sub Total – RPO | 60.49 | 58.28 | - | 75.04 | 75.04 | - |
| NVVNL Hydro (Non Solar) | 89.24 | 85.97 | - | 38.60 | 38.60 | 4.49 |
| New Station- Kameng HEP-NEEPCO | 20.25 | 19.51 | - | 9.76 | 9.76 | 5.00 |
| Total Power from firm sources | 3890.85 | 3727.11 | 320.43 | 745.58 | 1066.01 | 2.86 |
| Traders | ||||||
| Open Market | 268.78 | 268.78 | - | 79.83 | 79.83 | 2.97 |
| Sub Total – Open Market | 268.78 | 268.78 | - | 79.83 | 79.83 | 2.97 |
| Total | 4159.64 | 3995.89 | 320.43 | 825.41 | 1145.84 | 2.87 |
| Transmission Charges | ||||||
| PGCIL Charges | 183.84 | |||||
| Total | 4159.64 | 3995.89 | 320.43 | 825.41 | 1329.68 | 3.33 |
The Commission approves the quantum of power purchase for the FY 2018-19 as 3995.89
MU at the State Periphery with a total cost of Rs 1329.68 Cr.
6.8. Renewable Purchase Obligation (RPO)
Petitioner's Submission
The Petitioner has considered the same cost towards RPO, as approved by the Commission, in the MYT Order.
Commission's analysis:
As per Clause 1, Sub-clause (1) of the JERC for the State of Goa and UTs (Procurement of Renewable Energy) Regulations, 2010
"Each distribution licensee shall purchase electricity (in kWh) from renewable energy sources, at
a defined minimum percentage of the total consumption of all the consumers in its area during a
year."
The Commission notified the JERC (Procurement of Renewable Energy), (Third Amendment) Regulations, 2016 on 22nd August 2016 and approved the revised RPO targets, as per which the Petitioner has to purchase 9.00% of its total consumption (including 3.60% from Solar) from renewable sources for the FY 2018-19. Further, the Regulation states that the obligation has to be calculated on the mix of consumption excluding power from hydropower sources. Accordingly, the Commission has determined the RPO on revised energy sales as shown in the table below.
The Petitioner is procuring physical power from solar and hydro plants. However, the physical power is not enough to fulfill the standalone RPO for FY 2018-19. Therefore, the Commission has considered the remaining RPO to be fulfilled by the purchase of Renewable Energy Certificate (REC). The Commission has assumed the rate of purchase for both solar and non-solar REC as Rs 1.50/ kWh (IEX Average Clearing Price Rate) due to non –availability of solar REC's in the market. The total cost towards RPO compliance has been considered in the total power purchase cost approved earlier.
In accordance with the JERC for the State of Goa and UTs (Procurement of Renewable Energy) Regulations, 2010 the Commission has determined the following Renewable Purchase Obligation for the Petitioner for FY 2018-19:
Table 38: Summary of Renewable Purchase Obligation (RPO) (MU)
| Description | FY 2018-19 |
| Sales within State (MU) | 3644.93 |
| Percentage of hydropower (NVVNL Hydro) in total power purchase quantum at Ex-bus | 2.15% |
| Resultant Energy Sales for calculation of RPO (after adjustment of power from hydro sources) (MU) | 3566.73 |
| RPO obligation (in %) | 9.00% |
| Solar | 3.60% |
| Non-Solar | 5.40% |
| RPO obligation for the year (in MU) | 321.01 |
| Solar | 128.40 |
| Non-Solar | 192.60 |
| RPO compliance (Physical Power available at Consumer Periphery after adjusting Inter-State Transmission of 3.66% and Intra-State T&D Loss of 10.75%) | 52.01 |
| Solar | 52.01 |
| Non-Solar | 0.00 |
| RPO compliance (REC certificates to be purchased) | 268.99 |
| Solar | 76.39 |
| Non-Solar | 192.60 |
The cost towards compliance of RPO computed by the Commission has been shown in the following table.
Table 39: Cost towards compliance of Renewable Purchase Obligation (RPO) (In Rs Cr)
| Description | RPO (MU) | Total Cost (Rs Cr) | Avg. Rate (Rs/kWh) |
| NVVNL Solar | 9.44 | 8.45 | 8.95 |
| SECI Solar | 42.58 | 26.24 | 6.16 |
| Solar-REC | 76.39 | 11.46 | 1.50 |
| Non Solar- REC | 192.60 | 28.89 | 1.50 |
| Total RPO | 321.01 | 75.04 | 2.34 |
The cost towards RPO has already been considered in the total power purchase cost approved by the Commission in the previous section.
6.9. Energy Balance
Commission's analysis
Based on the approved energy sales and the revised estimates of the Power purchase quantum, the Commission approves the energy balance as shown in the following table:
Table 40: Energy Balance (MU) approved by Commission
| Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission | |
| A | Energy Requirement | |||
| 1 | Energy sales within the State/UT | 3644.93 | 3644.93 | 3644.93 |
| 2 | Open Access Sales | 0.00 | 0.00 | 0.00 |
| 3 | Less: Energy Savings | 78.60 | 78.60 | 78.60 |
| 4 | Total Sales within the State/UT | 3566.33 | ||
| 5 | Distribution losses | |||
| % | 10.75% | 10.75% | 10.75% | |
| MU | 429.56 | 429.56 | 429.56 | |
| 6 | Energy required at State Periphery | 3995.89 | 3995.89 | 3995.89 |
| B | Energy Transactions at Periphery | |||
| 1 | Add: Sales in Unscheduled Interchange | 0.00 | 0.00 | 0.00 |
| 2 | Add: Sales in Power Exchanges | 0.00 | 0.00 | 0.00 |
| 3 | Less: Purchase under UI (MU) | 0.00 | 0.00 | 0.00 |
| 4 | Less: Open Access Purchase (MU) | 0.00 | 0.00 | 0.00 |
| 5 | Total energy scheduled at State Periphery (MU) | 3995.89 | 3995.89 | 3995.89 |
| 6 | Energy Available at State Periphery from firm sources | 3995.89 | 3995.89 | 3727.11 |
| 7 | Deficit/(Surplus) (5-6) | 0.00 | 0.00 | 268.78 |
The Commission approves an energy deficit of 268.78 MU in FY 2018-19. The Commission
directs the Petitioner to purchase this deficit power from open market or other cheaper
sources rather than from costlier power stations. The Commission has considered the cost
towards this shortfall along with the Power Purchase Cost as approved earlier.
6.10. Operation & Maintenance (O&M) Expenses
Petitioner's Submission
The Petitioner has considered the same O&M Expenses as approved in the MYT Order.
Commission's analysis
The following table provides the O&M expenses approved in the MYT Order, Petitioner's submission and now approved by the Commission.
Table 41: O&M Expenses approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Employee Expenses | 270.41 | 270.41 | 270.41 |
| 2 | Administrative & General Expenses (A&G) | 10.81 | 10.81 | 10.81 |
| 3 | Repair & Maintenance Expenses | 45.60 | 45.60 | 45.60 |
| Total Operation & Maintenance Expenses | 326.82 | 326.82 | 326.82 |
The Commission approves the Operation & Maintenance (O&M) expenses of Rs 326.82 Cr in
the ARR of FY 2018-19.
6.11. Capitalisation
Petitioner's Submission
The Petitioner has considered the same Capitalization as approved in the MYT Order.
Commission's analysis:
The Commission approves the same Capitalization as approved in the MYT Order.
Table 42: Capitalisation approved by the Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Capitalisation | 685.27 | 685.27 | 685.27 |
The Commission approves Capitalization of Rs 685.27 Cr in the ARR of FY 2018-19.
6.12. Depreciation
Petitioner's Submission
The Petitioner has considered the same depreciation as approved in the MYT Order.
Commission's analysis:
The Commission approves the same depreciation as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 43: Depreciation approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Opening Gross Fixed Assets | 1454.96 | 1454.96 | 1454.96 |
| 2 | Addition During the FY | 685.27 | 685.27 | 685.27 |
| 3 | Less: Capitalization through grants in Business Plan Order | 125.77 | 125.77 | 125.77 |
| 4 | Closing Gross Fixed Assets | 2014.46 | 2014.46 | 2014.46 |
| 5 | Average Gross Fixed Assets | 1734.71 | 1734.71 | 1734.71 |
| 6 | Weighted Average Depreciation rate (%) | 5.28% | 5.28% | 5.28% |
| Depreciation | 91.59 | 91.59 | 91.59 |
The Commission approves depreciation of Rs 91.59 Cr in the ARR of FY 2018-19.
6.13. Interest and Finance Charges
Petitioner's Submission
The Petitioner has considered the same Interest and Finance Charges as approved in the MYT Order.
Commission's analysis:
The Commission also approves the same Interest and Finance Charges as approved in the MYT Order.
Table 44: Interest and Finance Charges approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Opening Normative Loan | 773.99 | 773.99 | 773.99 |
| 2 | Add: Normative Loan during the year | 391.65 | 391.65 | 391.65 |
| 3 | Less: Normative Repayment equivalent to Depreciation | 91.59 | 91.59 | 91.59 |
| 4 | Closing Normative Loan | 1074.05 | 1074.05 | 1074.05 |
| 5 | Average Normative Loan | 924.02 | 924.02 | 924.02 |
| 6 | Rate of Interest (%) | 11.60% | 11.60% | 11.60% |
| Interest and Finance Charges | 107.19 | 107.19 | 107.19 |
The Commission approves Interest and Finance Charges as Rs 107.19 Cr in the ARR of FY
2018-19.
6.14. Return on Equity (RoE)
Petitioner's submission
The Petitioner has considered the same RoE as approved in the MYT Order.
Commission's analysis:
The Commission, similar to above, approves the same RoE as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 45: RoE approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Opening Equity | 436.49 | 436.49 | 436.49 |
| 2 | Additions on account of new Capitalization | 167.85 | 167.85 | 167.85 |
| 3 | Closing Equity | 604.34 | 604.34 | 604.34 |
| 4 | Average Equity | 520.41 | 520.41 | 520.41 |
| 5 | Rate of Return on Equity (%) | 16.00% | 16.00% | 16.00% |
| Return on Equity | 83.27 | 83.27 | 83.27 |
The Commission approves Return on Equity of Rs 83.27 Cr in the ARR of FY 2018-19.
6.15. Interest on Security Deposits
Petitioner's submission:
The Petitioner has considered the same Interest of Security Deposit as approved in the MYT Order. Further, the Petitioner has requested the Commission to allow the provision of unpaid security deposit of Rs 9.15 Cr to be included in the total revenue gap to be recovered in the FY 2018-19.
Commission's analysis:
The Commission has considered the same Interest on Security Deposit as approved in the MYT Order. The Commission has not considered any provision for unpaid Interest on the Consumer Security Deposit. The Commission will consider the interest paid on consumer security deposits for the previous years as and when the same is paid to consumers on actual basis as per the audited accounts.
Table 46: Interest on Security Deposits approved by Commission (In Rs Cr)
| S. No | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Opening Security Deposit | 90.57 | 90.57 | 90.57 |
| 2 | Add: Deposits During the year | 1.16 | 1.16 | 1.16 |
| 3 | Less: Deposits refunded | 0.00 | 0.00 | 0.00 |
| 4 | Closing Security Deposit | 91.73 | 91.73 | 91.73 |
| 5 | Average Security Deposit | 91.15 | 91.15 | 91.15 |
| 6 | Rate of Interest (%) | 7.75% | 7.75% | 7.75% |
| 7 | Interest on Security Deposit | 7.02 | 7.02 | 7.02 |
| 8 | Additional provision of unpaid security deposit | - | 9.15 | - |
| Total Interest on Security Deposit | 7.02 | 16.17 | 7.02 |
The Commission approves Interest on Security Deposit as Rs 7.02 Cr in the ARR of FY
2018-19.
6.16. Demand Side Management (DSM) Expenses
Petitioner's submission
The Petitioner has considered the expenses towards DSM as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Commission's analysis:
The Commission approves the same DSM expenses as approved in the MYT Order.
Table 47: DSM Expenses as approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | DSM Expenses | 3.03 | 3.03 | 3.03 |
The Commission approves DSM Expenses as Rs 3.03 Cr in the ARR of FY 2018-19.
6.17. Interest on Working Capital
Petitioner's Submission
The Petitioner has considered the same Interest on Working Capital as approved in the MYT Order.
Commission's analysis:
Since the Power purchase cost has been revised, the same has an impact on the Interest and Working Capital. The Interest on Working Capital has been calculated based on the normative principles outlined in the JERC (Multi-Year Distribution Tariff) Regulations, 2014. Regulation 25 of the MYT Regulations, 2014 states the following:
Working capital for retail supply activity of the licensee shall consist of:
(i) Receivables of two months of billing
(ii) Less power purchase cost of one month
(iii) Less consumer security deposit but excluding Bank Guarantee/Fixed Deposit Receipt
(iv) Inventory for two months based on annual requirement for previous year.
The rate of interest on working capital shall be equal to the base rate for the State Bank of India
on the 1st April of the relevant financial year. The interest on working capital shall be payable on
normative basis notwithstanding that the licensee has not taken working capital loan from any
outside agency or has exceeded the working capital loan worked out on the normative figures."
The Commission has determined the Interest on Working Capital in accordance with the Regulation as cited above. The Interest Rate has been considered as the prevailing SBI Base rate. The table below provides the Interest in Working Capital as approved in the MYT Order and now approved by the Commission:
Table 48: Interest on Working Capital approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Receivables of two months of billing | 342.94 | 342.94 | 325.42 |
| 2 | Less: Power Purchase Cost for one month | 119.42 | 119.42 | 110.81 |
| 3 | Inventory Based on Annual Requirement for Previous FY for 2 months | 0.00 | 0.00 | 0.00 |
| 4 | Total Working Capital Requirement | 223.52 | 223.52 | 214.62 |
| 5 | Less: Average Security Deposit excluding BG/FDR | 90.57 | 90.57 | 91.15 |
| 6 | Net Working Capital | 132.94 | 132.94 | 123.47 |
| 7 | Rate of Interest (%) | 9.30% | 9.30% | 8.65% |
| Interest on Working Capital | 12.36 | 12.36 | 10.68 |
The Commission now approves the Interest on Working Capital as Rs 10.68 Cr in the ARR of
FY 2018-19.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20186.18. Non-Tariff Income (NTI)
Petitioner's submission
The Petitioner has considered the same NTI as approved in the MYT Order.
Commission's analysis:
The Commission also approves the same NTI as approved in the MYT Order.
Table 49: Non –tariff Income approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Non-Tariff Income | 6.74 | 6.74 | 6.74 |
The Commission approves Non-Tariff Income of Rs 6.74 Cr in the ARR of FY 2018-19.
6.19. Aggregate Revenue Requirement (ARR)
Petitioner's submission
The Petitioner has considered the same ARR for FY 2018-19 as approved in the MYT Order along with an additional provision of Interest on Security Deposit.
Commission's analysis
On the basis of the above, the Commission approves the revenue requirement for the FY 2018-19 as shown in the table below:
Table 50: Aggregate Revenue Requirement approved by Commission
for FY 2018-19 (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Power Purchase Cost (inclusive of RPO Cost) | 1433.09 | 1433.09 | 1329.68 |
| 2 | Operation & Maintenance Expenses | 326.82 | 326.82 | 326.82 |
| 3 | Depreciation | 91.59 | 91.59 | 91.59 |
| 4 | Interest and Finance charges | 107.19 | 107.19 | 107.19 |
| 5 | Interest on Working Capital | 12.36 | 12.36 | 10.68 |
| 6 | Interest on Security Deposit | 7.02 | 16.17 | 7.02 |
| 7 | Return on Equity | 83.27 | 83.27 | 83.27 |
| 8 | Provision for Bad Debt | 0.00 | 0.00 | 0.00 |
| 9 | Income Tax | 0.00 | 0.00 | 0.00 |
| 10 | Payment towards DSM | 3.03 | 3.03 | 3.03 |
| 11 | Total Revenue Requirement | 2064.37 | 2073.52 | 1959.28 |
| 12 | Less: Non-Tariff Income | 6.74 | 6.74 | 6.74 |
| 13 | Net Revenue Requirement | 2057.63 | 2066.78 | 1952.54 |
The Commission approves net ARR of Rs 1952.54 Cr for the FY 2018-19.
6.20. Revenue at existing Retail Tariff
Petitioner's submission
The Petitioner has submitted the revenue from sale of power at existing tariff as Rs 1593.75 Cr based on the approved energy sales, connected load and number of consumers in the MYT OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 Order. The revenue for FY 2018-19 has been computed based on the retail tariff notified by the Commission in the Tariff Order for the FY 2017-18 dated 23rd May 2017. The table below provides the category wise revenue computed by the Petitioner for FY 2018-19.
Table 51: Revenue submitted by Petitioner (In Rs Cr)
| S. No. | Category | Sales (MU) | Fixed Charges (Rs Cr) | Energy Charges (Rs Cr) | Total Charges (Rs Cr) | ABR (Rs /kWh) |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| A | Low Tension Supply | |||||
| 1 | Tariff LTD/Domestic and Non- Commercial | 984.51 | 16.49 | 272.07 | 288.56 | 2.93 |
| 1(a) | 0-100 units | 89.28 | 5.09 | 11.61 | 16.69 | 1.87 |
| 1(b) | 101-200 units | 205.24 | 3.18 | 38.99 | 42.18 | 2.06 |
| 1(c) | 201 to 300 units | 174.49 | 3.65 | 41.88 | 45.53 | 2.61 |
| 1(d) | 301 to 400 units | 119.79 | 1.78 | 37.14 | 38.91 | 3.25 |
| 1(e) | Above 400 units | 395.72 | 2.79 | 142.46 | 145.25 | 3.67 |
| 2 | Tariff LTD/Low Income Group | 1.10 | 0.11 | - | 0.11 | 1.00 |
| 3 | Tariff-LTC/Commercial | 340.26 | 5.84 | 126.41 | 132.24 | 3.89 |
| 0-20 KW/Commercial Consumers | 268.67 | 5.72 | 99.66 | 105.38 | 3.92 | |
| 1-100 Units | 114.26 | 2.94 | 37.13 | 40.07 | 3.51 | |
| 101-200 units | 99.42 | 2.67 | 38.77 | 41.45 | 4.17 | |
| 201-400 Units | 52.41 | 0.11 | 22.53 | 22.65 | 4.32 | |
| Above 400 units | 2.59 | 0.00 | 1.22 | 1.22 | 4.71 | |
| >20-90Kw Commercial Consumers | 71.59 | 0.11 | 26.75 | 26.86 | 3.75 | |
| 1-100 Units | 28.04 | 0.05 | 9.11 | 9.17 | 3.27 | |
| 101-200 units | 28.04 | 0.05 | 10.94 | 10.99 | 3.92 | |
| 201-400 Units | 14.78 | 0.00 | 6.36 | 6.36 | 4.30 | |
| Above 400 units | 0.73 | 0.00 | 0.34 | 0.34 | 4.70 | |
| 4 | LTI-Industry | 137.42 | 4.16 | 47.81 | 51.97 | 3.78 |
| 0-500 Units | 7.21 | 0.22 | 2.24 | 2.45 | 3.40 | |
| Above 500 units | 130.21 | 3.94 | 45.57 | 49.52 | 3.80 | |
| 5 | Tariff-LTP/Mixed (Hotel Industries) | 5.31 | 0.15 | 2.39 | 2.54 | 4.79 |
| 6 | LT-Agriculture | 23.86 | 0.56 | 3.13 | 3.69 | 1.54 |
| 7 | Tariff-LTAG/Agriculture (Pump Sets/Irrigation) (A) | 23.03 | 0.40 | 2.99 | 3.40 | 1.48 |
| 8 | Tariff-LTAG/Agriculture Allied (B) | 0.83 | 0.16 | 0.13 | 0.29 | 3.48 |
| 9 | Tariff-LTPL/Public Lighting | 36.95 | 0.46 | 14.41 | 14.87 | 4.02 |
| 10 | Tariff-LT Hoarding and Signboards | 0.35 | 0.00 | 0.35 | 0.35 | 9.97 |
| B | High Tension Supply | |||||
| 11 | Tariff HTD/Domestic | 0.28 | 0.03 | 0.12 | 0.16 | 5.64 |
| 12 | Tariff HT-Commercial | 79.05 | 12.77 | 43.48 | 56.25 | 7.12 |
| 13 | Tariff HTI/Industrial | 1398.09 | 125.17 | 599.70 | 724.87 | 5.18 |
| Connected at 11/33 kV | 1250.34 | 103.90 | 537.64 | 641.55 | 5.13 | |
| Connected at 110 kV | 147.75 | 21.27 | 62.06 | 83.32 | 5.64 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 14 | H.T.Industrial (Ferro Mettallurgical/ Steel Melting/Power Intensive) | 582.70 | 34.43 | 250.56 | 284.99 | 4.89 |
| 15 | HT-Agriculture | 6.08 | 0.37 | 0.98 | 1.34 | 2.21 |
| Tariff-HTAG/Agriculture (Pump Sets/Irrigation) (A) | 2.95 | 0.32 | 0.41 | 0.73 | 2.48 | |
| Tariff-HTAG/Agriculture (Allied Activities) (B) | 3.13 | 0.05 | 0.56 | 0.61 | 1.96 | |
| 16 | H.T. MES/Defence Establishments | 26.89 | 1.49 | 13.45 | 14.93 | 5.55 |
| C | Temporary Supply | - | ||||
| 17 | Tariff-LT/Temporary Domestic | 17.47 | 0.06 | 12.23 | 12.29 | 7.03 |
| 18 | Tariff-LT/Temporary Commercial | 4.61 | 0.03 | 4.57 | 4.60 | |
| 19 | Tariff-HTTS/Temporary Supply | - | - | - | ||
| D | Single Point Supply | - | ||||
| 20 | Residential Complexes | - | - | - | ||
| 21 | Commercial Complexes | - | - | - | ||
| 22 | Industrial Complexes | - | - | - | ||
| Total | 3644.93 | 202.11 | 1391.64 | 1593.75 | 4.37 |
Commission's analysis
The category wise/sub-category wise and slab wise revenue at retail tariff is determined as per the applicable tariff rates. The revenue from demand charges and the energy charges have been projected for each category/sub-category and slab. The revenue from LT-AG-Allied Activities, HT-AG-Allied activities, HT Temporary and Single Point Supply categories has not been computed due to non-availability of data on energy sales, connected load and number of consumers for these categories. The category/sub-category/slab wise revenue as computed by the Commission for FY 2018-19 has been shown in the following table:
Table 52: Revenue from existing retail tariff for FY 2018-19 (In Rs Cr)
| S. No. | Category | Sales (Mus) | Demand Charges (Rs Cr) | Energy charges (Rs Cr) | Total Charges (Rs Cr) | ABR (Rs/unit) |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 1 | DOMESTIC | 1000.73 | 15.53 | 228.58 | 244.11 | 2.44 |
| (i) | LT-D Domestic | 999.35 | 15.38 | 228.46 | 243.84 | 2.44 |
| 0-100 units | 276.28 | 6.08 | 35.92 | 42.00 | 1.52 | |
| 101-200 units | 251.76 | 3.05 | 47.83 | 50.88 | 2.02 | |
| 201-300 units | 164.13 | 3.16 | 39.39 | 42.55 | 2.59 | |
| 301-400 units | 105.43 | 1.43 | 32.68 | 34.11 | 3.24 | |
| Above 400 units | 201.75 | 1.67 | 72.63 | 74.30 | 3.68 | |
| (ii) | Low Income Group | 1.10 | 0.11 | - | 0.11 | 1.00 |
| (iii) | HT-D Domestic | 0.28 | 0.03 | 0.12 | 0.16 | 5.64 |
| 2 | COMMERCIAL | 404.47 | 28.88 | 184.73 | 213.61 | 5.28 |
| (i) | LT-C Commercial | 325.42 | 16.11 | 141.25 | 157.36 | 4.84 |
| 0-100 units | 49.14 | 3.33 | 15.97 | 19.30 | 3.93 | |
| 101-200 units | 31.05 | 0.81 | 12.11 | 12.92 | 4.16 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 201-400 units | 52.14 | 1.69 | 22.42 | 24.11 | 4.62 | |
| Above 400 units | 193.08 | 10.29 | 90.75 | 101.03 | 5.23 | |
| (ii) | HT-C Commercial | 79.05 | 12.77 | 43.48 | 56.25 | 7.12 |
| 3 | INDUSTRIAL | 2123.52 | 124.01 | 899.10 | 1023.11 | 4.82 |
| (i) | LT-I Industrial | 137.42 | 4.16 | 47.30 | 51.46 | 3.74 |
| 0-500 units | 19.96 | 1.95 | 6.19 | 8.14 | 4.08 | |
| Above 500 units | 117.46 | 2.21 | 41.11 | 43.32 | 3.69 | |
| (ii) | Low Tension-Mixed/LT-P (Hotel Industries) | 5.31 | 0.15 | 2.39 | 2.54 | 4.79 |
| (iii) | High Tension-I/HT-I | 1398.09 | 93.87 | 598.85 | 692.73 | 4.95 |
| Connected at 11/33 kV | 1165.47 | 85.19 | 501.15 | 586.34 | 5.03 | |
| Connected at 110 kV | 232.62 | 8.69 | 97.70 | 106.39 | 4.57 | |
| (iv) | High Tension- Ferro/SM/PI/SR | 582.70 | 25.82 | 250.56 | 276.38 | 4.74 |
| 4 | AGRICULTURE | 29.94 | 0.85 | 3.95 | 4.80 | 1.60 |
| (i) | Low Tension-AG/LT-AGP (Pump Sets/Irrigation) | 23.86 | 0.50 | 3.10 | 3.60 | 1.51 |
| (ii) | Low Tension-AG/LT-AGA (Allied Activities) | - | - | - | - | - |
| (iii) | High Tension-AG/HT-AGP (Pump Sets/Irrigation) | 6.08 | 0.35 | 0.85 | 1.20 | 1.98 |
| (iv) | High Tension-AG/HT-AG (Allied Activities) | - | - | - | - | - |
| 5 | MILITARY ENGINEERING SERVICES/DEFENSE ESTABLISHMENTS | 26.89 | 1.49 | 13.45 | 14.93 | 5.55 |
| 6 | PUBLIC LIGHTING | 36.95 | 0.46 | 14.41 | 14.87 | 4.02 |
| 7 | HOARDINGS/SIGNBOARDS | 0.35 | 0.00 | 0.35 | 0.35 | 9.97 |
| 8 | TEMPORARY | 22.08 | 0.13 | 21.06 | 21.19 | 9.60 |
| (i) | LT | 22.08 | 0.13 | 21.06 | 21.19 | 9.60 |
| LT Domestic | 2.74 | 0.01 | 1.92 | 1.93 | 7.03 | |
| LT Commercial | 19.34 | 0.12 | 19.14 | 19.26 | 9.96 | |
| (ii) | HT | - | - | - | - | - |
| TOTAL | 3644.93 | 171.34 | 1365.63 | 1536.97 | 4.22 |
The Commission has determined revenue from sale of power at existing tariff as Rs 1536.97
Cr for FY 2018-19.
6.21. Standalone Revenue Gap/Surplus
Petitioner's submission
Based on the ARR submitted and the revenue from retail tariff, a standalone revenue gap of Rs. 473.03 Cr has been determined by the Petitioner for FY 2018-19.
Commission analysis
Based on the approved ARR and existing retail tariff, the following Revenue Gap/Surplus is arrived at for the FY 2018-19:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 53: Standalone Revenue Gap/Surplus approved by Commission (In Rs Cr)
| S. No. | Particulars | Approved in MYT Order | Petitioner's Submission | Now Approved by Commission |
| 1 | Net Revenue Requirement | 2057.63 | 2066.78 | 1952.54 |
| 2 | Revenue from Retail Sales at Existing Tariff | - | 1593.75 | 1536.97 |
| Net Gap /(Surplus) | - | 473.03 | 415.57 |
The standalone gap at existing retail tariff is Rs 415.57 Cr for FY 2018-19. The estimated gap
is considered while determining the retail tariff for FY 2018-19, as discussed in the
subsequent Chapter.
7. Chapter 7: Tariff Principles and Design
7.1. Overall Approach
The Commission while designing retail tariffs for FY 2018-19 has kept in view the principles of determination of tariff set out in the Electricity Act, 2003 (EA, 2003), Tariff Policy, 2016 and the MYT Regulations, 2014.
The Commission in this Tariff Order, has tried to meet the objectives of the EA 2003, as set out in its Preamble, including the protection of the interest of consumers, the supply of electricity to all areas and the rationalisation of tariffs. The EA, 2003 also directs to maintain a healthy balance between the interests of the Utilities and the reasonableness of the cost of power being supplied to consumers. The Commission has also taken into consideration the Licensees submissions as well as the public responses in these proceedings.
The supply of electricity to all the people is an essential driver for development, and also influences social and economic change. Since, the majority of the energy sales within the Licensees jurisdiction is of industrial nature, the Commission has attempted to ensure that, while industries and commerce are promoted, it is not at the cost of other segments of society.
7.2. Applicable Regulations
Regulation 36 of the MYT Regulations, 2014 states the following:
"a. The Commission shall gradually move towards reduction of cross subsidy in accordance with
Electricity Act, Tariff Policy and such other guidelines of the government as applicable.
b. The Distribution Licensee shall compute the consumer category-wise cost of supply as per the
methodology elaborated below.
c. Allocation of Cost: The Cost to serve shall be allocated to the consumer categories in the
following manner:
Step 1: Functional Demarcation of Cost – Total cost shall be divided on the basis of functions
performed such as power purchase, distribution etc.
Step 2: Classification of Cost –Each of the functionalized costs shall be further classified, based
on its intrinsic nature into Demand related cost, Energy related cost and Customer related cost.
Demand related costs shall generally be of fixed nature, related to capacity creation and shall
include interest on capital borrowing, depreciation etc. Energy cost shall be related to quantum
of electricity consumption of consumer, such as fuel cost, interest on working capital, etc.
Consumer related cost shall include operating expenses associated with meter reading, billing
and accounting.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Step 3: Allocation of Cost
(i) Allocation of Demand Costs: Demand costs of all three functions shall be allocated among
consumer categories on the basis of average coincident peak demand of the tariff
categories (average of past 12 months). To facilitate determination of average coincident
peak demand for the various tariff categories, load research shall be made an integral part
of the operations of the DISCOMs and systematic load research exercises shall be initiated.
(ii) Allocation of Energy Costs: Energy related costs of Distribution functions shall be
allocated to consumer categories on the basis of ratio of electricity consumption of each
consumer category to the total electricity consumption under the purview of the
Distribution Licensee. Energy related costs of Power purchase shall be allocated to various
tariff categories on the basis of block approach on merit order dispatch and incremental
principle, where each tariff category shall be allocated the incremental (energy related)
power purchase cost on the basis of their respective share in the incremental power
purchase. For the purpose of operationalizing the block approach and incremental
principle, the Commission shall identify and notify a suitable year as the "base year".
(iii) Allocation of Customer Costs: Customer related costs shall be allocated to consumer
categories on the basis of the ratio of number of consumers in each category to total
number of consumers under the purview of the Distribution Licensee.
d. Summation of allocated Demand cost, Energy cost and Customer cost across functions shall be
total Cost to serve for respective consumer categories. Cost to serve reduced by revenue from a
consumer category shall give total subsidy for that category. Total subsidy for a consumer
category reduced by Government subsidy, if any, shall be cross-subsidy for that consumer
category.
e. The consumers below poverty line who consume power below a specified level, say 30 units
per month, shall receive a special support through cross subsidy.
f. Cross-subsidy surcharge and additional surcharge in Open Access
(i) The amount received or to be received by the licensee on account of cross-subsidy
surcharge and additional surcharge, as approved by the Commission from time to time in
accordance with the Regulations specified by the Commission, shall be shown separately
against the consumer category that is permitted open access as per the phasing plan.
(ii) Cross-subsidy surcharge and additional surcharge shall be shown as revenue from the
tariff from the consumer categories who have been permitted open access and such
amount shall be utilized to meet the cross-subsidy requirements of subsidized categories
and fixed costs of the Distribution Licensee arising out of his obligation to supply. Provided
that the licensee shall provide such details in its annual filings.
g. Tariff Design
(i) The Commission shall be guided by the objective that the tariff progressively reflects the
efficient and prudent cost of supply of electricity.
(ii) After the costs have been allocated based on the method specified in clauses I and (d)
above, tariffs for different consumer categories shall be designed with due regard to
factors provided under section 62(3) of the Act.
(iii) The time of day tariff would be structured across three time slabs to denote normal, peak
and off-peak periods. The time-periods would vary according to different seasons of the
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018year i.e. summer, winter and the monsoon season. The peak tariff would be 10%-20%
higher than the normal tariff and the off-peak tariff would be priced 5%-10% lower than
the normal tariff.
(iv) Time of Day tariff may be introduced in a phased manner, wherein in phase 1 it would be
for HT Consumers, in phase 2 – for LT consumers consuming more than 25 KW and in
phase 3 for LT consumers consuming more than 10 KW."
7.3. Revenue Gap/Surplus at existing tariff
Petitioner's Submission
The Petitioner has proposed a standalone revenue gap of Rs 473.03 in FY 2018-19. The Petitioner has submitted that the cumulative revenue gap from FY 2014-15 to FY 2017-18 is not being claimed, the same shall be submitted once the audited annual accounts are prepared for respective years. The standalone revenue gap as submitted by the Petitioner has been tabulated below:
Table 54: Standalone Revenue Gap/Surplus submitted by Petitioner (In Rs Cr)
| Particulars | FY 2018-19 |
| Net Revenue Requirement | 2066.78 |
| Revenue from Retail Sales at Existing Tariff inclusive of Regulatory Surcharge applicable in FY 2017-18 | 1593.75 |
| Standalone Gap /(Surplus) for the year | 473.03 |
Commission's analysis
The Commission in the True-up of FY 2013-14 approved the revenue gap/surplus as nil. Further, the Commission has not approved any revenue gap for FY 2014-15 to FY 2016-17 due to non– availability of audited annual accounts and for FY 2017-18 due to unreliable data. Therefore, the Commission approves the standalone revenue gap for FY 2018-19 as follows:
Table 55: Standalone Revenue Gap/ Surplus determined by Commission (In Rs Cr)
| Particulars | FY 2018-19 |
| Net Revenue Requirement | 1952.54 |
| Revenue from Retail Sales at Existing Tariff | 1536.97 |
| Standalone Gap /(Surplus) for the year | 415.57 |
The Commission has computed a standalone revenue gap of Rs 415.57 Cr in the FY 2018-19
at the existing tariff.
7.4. Treatment of the Revenue Gap/ Surplus and Tariff Design
The revenue gap of Rs 415.57 Cr, signifies that the revenue from the existing tariff is not commensurate with the costs incurred by the Petitioner. Therefore, in order to fulfill this revenue deficit and to be financially sustainable, the retail consumer tariffs are required to be increased. The Commission has accordingly dealt with this gap in the following section.
7.4.1. Tariff Proposal
Petitioner's Submission
The Petitioner has proposed to recover the revenue gap of Rs 473.03 Cr, partly from proposed tariff increase and partly from budgetary support from the Govt. of Goa. The Petitioner has proposed an average tariff hike of 4.95% that will earn an additional revenue of Rs 78.94 Cr. The OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 remaining gap of Rs 394.09 Cr is proposed to be met from the budgetary support from the Government.
The category wise existing and proposed tariff submitted by the Petitioner is as under:
Table 56: Retail Tariff proposed by Petitioner
| S. No. | Category | Existing Tariff | Proposed Tariff | ||
| Fixed Charges | Energy Charges (Paisa/kWh) | Fixed Charges | Energy Charges (Paisa/kWh) | ||
| 1 | 2 | 3 | 4 | 5 | 6 |
| 1 | Domestic | ||||
| A | Low Tension-D/LT-D | ||||
| 0-100 units | Single Phase Rs 20/Connection/Month Three Phase Rs 45/Connection/Month | 130 | Single Phase Rs 25/Connection/Month Three Phase Rs 80/Connection/Month | 140 | |
| 101-200 units | 190 | 200 | |||
| 201 to 300 units | 240 | 260 | |||
| 301 to 400 units | 310 | 330 | |||
| Above 400 units | 360 | 380 | |||
| B | Low Tension-LIG/LT-LIG | Rs 30/Connection/Month | Rs 40/Connection/Month | ||
| C | High Tension-D/HT-D | ||||
| All Units | Rs 150/kVA/Month | 440 | Rs 160/kVA/Month | 460 | |
| 2 | Commercial | ||||
| A | Low Tension-C/LT-C | ||||
| 0-100 units | 0-20 kW - Rs 50/Conn/Month Above 20kW-90 kW Rs 50/Conn/month + additional Rs 55/kW for every kW increase above 20 kW | 325 | 0-20 kW - Rs 60/Conn/Month Above 20kW-90 kW Rs 90/Conn/month | 330 | |
| 101-200 units | 390 | 400 | |||
| 201 units- 400 units | 430 | 480 | |||
| Above 400 units | 470 | 520 | |||
| B | High Tension-C/HT-C | ||||
| All Units | Rs 250/kVA/month | 550 | Rs 250/kVA/month | 550 | |
| 3 | Industrial | ||||
| A | Low Tension-I/LT-I | ||||
| 0-500 units | Rs 30/HP/Month | 310 | Rs 35/HP/Month | 330 | |
| Above 500 units | Rs 30/HP/Month | 350 | Rs 35/HP/Month | 380 | |
| B | Low Tension-Mixed/LT- P (Hotel Industries) | ||||
| All Units | Rs 30/kW/Month | 450 | Rs 35/kW/Month | 460 | |
| C | High Tension-I/HT-I | ||||
| Connected at 11/33 kV | Rs 250/kVA/Month | 430 | Rs 250/kVA/Month | 450 | |
| Connected at 110 kV | Rs 250/kVA/Month | 420 | Rs 250/kVA/Month | 450 | |
| D | High Tension- Ferro/SM/PI/SR | ||||
| All Units | Rs 250/kVA/Month | 430 | Rs 250/kVA/Month | 450 |
| 1 | 2 | 3 | 4 | 5 | 6 |
| 4 | Agricultural | ||||
| A | Low Tension-AG/LT- AGP (Pump Sets/Irrigation) | ||||
| All Units | Rs 12/HP/Month | 130 | Rs 15/HP/Month | 150 | |
| Low Tension-AG/LT- AGA (Allied Activities) | |||||
| All Units | Rs. 20/HP/Month | 160 | Rs. 20/HP/Month | 180 | |
| C | High Tension-AG/HT- AGP (Pump Sets/Irrigation) | ||||
| All Units | Rs. 35/kVA/Month | 140 | Rs. 35/kVA/Month | 150 | |
| D | High Tension-AG/HT-AG (Allied Activities) | ||||
| All Units | Rs. 50/kVA/Month | 180 | Rs. 60/kVA/Month | 200 | |
| 5 | Military Engineering Services/Defense Establishments | ||||
| All Units | Rs. 175/kVA/Month | 500 | Rs. 175/kVA/Month | 500 | |
| 6 | Public Lighting | ||||
| All Units | Rs. 40/kW/Month | 390 | Rs. 40/kW/Month | 390 | |
| 7 | Hoardings/Signboards | ||||
| All Units | Rs. 60/kVA/Month | 990 | Rs. 60/kVA/Month | 990 | |
| 8 | Temporary Supply | ||||
| A | LT Temporary Domestic | Rs. 60 per kW per month or part thereof subject to a minimum of Rs. 300/- per connection per month or part thereof | 700 | Rs. 60 per kW per month or part thereof subject to a minimum of Rs. 300/- per connection per month or part thereof | 720 |
| B | LT Temporary Commercial | Rs. 100 per kVA per month or part thereof subject to a minimum of Rs. 500/- per connection per month or part thereof | 990 | Rs. 120 per kVA per month or part thereof subject to a minimum of Rs. 500/- per connection per month or part thereof | 990 |
| C | HT Temporary | Rs 120 per kVA per month or part thereof | 990 | Rs. 120 per kVA per month or part thereof | 990 |
| 9 | Single Point Supply | ||||
| A | Residential Complexes | Rs. 100 per kVA per month or part thereof | 310 | Rs. 100 per kVA per month or part thereof | 330 |
| B | Commercial Complexes | Rs. 200 per kVA per month or part thereof | 430 | Rs. 200 per kVA per month or part thereof | 430 |
| C | Industrial Complexes | Rs. 200 per kVA per month or part thereof | 390 | Rs. 200 per kVA per month or part thereof | 410 |
Commission's analysis
As discussed above, the Commission has determined the retail tariff for the FY 2018-19 in accordance with the principles stated in the Electricity Act, 2003 Tariff Policy, 2016, and the MYT Regulations, 2014.
Tariff design in general is guided by the following principles:
1. Cost reflective: The tariffs determined should efficiently reflect the cost of supply for each consumer category.
2. Progressive tariffs: Ensuring progressivity among tariffs by having telescopic tariff slab within a consumer category which encourages efficient consumption and at the same time promotes intra-category cross-subsidy by way of charging higher tariff for higher consumption to subsidise the lower consumption consumers.
3. Revenue neutrality: There should be no impact on the utility's yearly revenue due to rationalization of tariffs i.e. the overall status quo should be maintained.
4. Revenue stability: Utilities should ensure adequate fixed cost recovery from fixed/demand charges.
5. Affordability: Assessing affordability of electricity for Domestic & Commercial consumers for defining slab ranges and setting tariffs.
6. Avoiding tariff shocks: Tariff shocks should be prevented and consumers should be kept informed about the future trends in tariffs.
7. Demand management and grid stability: Demand management and grid stability should be ensured with demand-based tariffs.
8. Simplified tariff structure: Tariff structure should be simplified to make it easily administrable by the utility and easy to understand for the consumer.
9. Smart tariff design: Tariff rate design should take into consideration trends in electric power such as small scale renewable generation by consumers, energy efficiency, electric vehicle charging, etc.
Keeping in view the above principles and the Petitioner's submission the Commission has determined and modified the Retail Tariff for FY 2018-19 as per the following:
1. The Commission in accordance with the Petitioner' submission has limited the average tariff hike with the remaining gap to be recovered from Govt's budgetary support as discussed in subsequent sections. A relatively higher tariff increase has been done for cross-subsidized categories such as Domestic and Agriculture than cross-subsidizing categories such as Commercial and Industrial category in order to ensure that tariffs progressively reflect the cost of supply.
2. The consumers under the Commercial category having connected load between 20-90 kW used to pay a monthly Demand charge based on both per connection basis as well as on connected load basis. The Commission in this Order has done away with the monthly fixed charge on per connection basis and approved a fixed charge only on the basis of connected load.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20187.4.2. Tariff Increase and Schedule:
As described earlier, the current tariff is not covering the entire cost of the Petitioner for FY 2018-19 necessitating an increase in Retail Tariff. The existing retail tariff and tariff now approved by the Commission for each consumer category has been shown in the table below:
Table 57: Existing and approved tariff
| Category | Existing Tariff | Approved Tariff | |||
| Fixed Charges | Energy Charges (Rs/kWh) | Fixed Charges | Energy Charges (Rs/kWh) | ||
| 1 | 2 | 3 | 4 | 5 | 6 |
| 1 Domestic | |||||
| A Low Tension-D/LT-D | |||||
| 0-100 units | Single Phase Rs 20/Con/Month Three Phase Rs 45/Con/Month | 1.30 | Single Phase Rs 25/Con/Month Three Phase Rs 60/Con/Month | 1.40 | |
| 101-200 units | 1.90 | 2.10 | |||
| 201 to 300 units | 2.40 | 2.65 | |||
| 301 to 400 units | 3.10 | 3.45 | |||
| Above 400 units | 3.60 | 4.00 | |||
| B Low Tension-LIG/LT-LIG | Rs 30/Con/Month | Rs 40/Con/Month | |||
| C High Tension-D/HT-D | |||||
| All Units | Rs 150/kVA/Month | 4.40 | Rs 100/kVA/Month | 3.45 | |
| 2 Commercial | |||||
| A Low Tension-C/LT-C | |||||
| 0-100 units | 0-20 kW - Rs 50/Con/Month Above 20kW-90 kW Rs 50/Con/Month + additional Rs 55/kW for every kW increase above 20 kW | 3.25 | For consumers with Load upto – Rs 50/Con/Month For consumers with Load more than 20 kW and upto 90 kW- Rs 55/kW/Month | 3.40 | |
| 101-200 units | 3.90 | 4.10 | |||
| 201 units- 400 units | 4.30 | 4.60 | |||
| Above 400 units | 4.70 | 5.00 | |||
| B High Tension-C/HT-C | |||||
| All Units | Rs 250/kVA/month | 5.50 | Rs 250/kVA/month | 5.50 | |
| 3 | Industrial | ||||
| A Low Tension-I/LT-I | |||||
| 0-500 units | Rs 30/HP/Month | 3.10 | Rs 35/HP/Month | 3.30 | |
| Above 500 units | Rs 30/HP/Month | 3.50 | Rs 35/HP/Month | 3.80 | |
| B | Low Tension-Mixed/LT-P (Hotel Industries) | ||||
| All Units | Rs 30/kW/Month | 4.50 | Rs 40/kW/Month | 4.70 | |
| C High Tension-I/HT-I | |||||
| Connected at 11/33 kV | Rs 250/kVA/Month | 4.30 | Rs 250/kVA/Month | 4.50 | |
| Connected at 110 kV | Rs 250/kVA/Month | 4.20 | Rs 250/kVA/Month | 4.40 | |
| D | High Tension- Ferro/SM/PI/ SR | ||||
| All Units | Rs 250/kVA/Month | 4.30 | Rs 250/kVA/Month | 4.50 | |
| 4 Agricultural | |||||
| A | Low Tension-AG/LT-AGP (Pump Sets/Irrigation) | ||||
| All Units | Rs 12/HP/Month | 1.30 | Rs 15/HP/Month | 1.40 |
| 1 | 2 | 3 | 4 | 5 | 6 |
| B | Low Tension-AG/LT-AGA (Allied Activities) | ||||
| All Units | Rs 20/HP/Month | 1.60 | Rs 20/HP/Month | 1.70 | |
| C | High Tension-AG/HT-AGP (Pump Sets/Irrigation) | ||||
| All Units | Rs 35/kVA/Month | 1.40 | Rs 35/kVA/Month | 1.50 | |
| D | High Tension-AG/HT-AG (Allied Activities) | ||||
| All Units | Rs 50/kVA/Month | 1.80 | Rs 60/kVA/Month | 1.90 | |
| 5 | Military Engineering Services/Defense Establishments | ||||
| All Units | Rs 175/kVA/Month | 5.00 | Rs 175/kVA/Month | 5.00 | |
| 6 Public Lighting | |||||
| All Units | Rs 40/kW/Month | 3.90 | Rs 50/kW/Month | 4.10 | |
| 7 Hoardings/Signboards | |||||
| All Units | Rs 60/kVA/Month | 9.90 | Rs 60/kVA/Month | 9.90 | |
| 8 | Temporary Supply | ||||
| A LT Temporary Domestic | Rs 60 per kW per month or part thereof subject to a minimum of Rs 300/- per connection per month or part thereof | 7.00 | Rs 60 per kW per month or part thereof subject to a minimum of Rs 300/- per connection per month or part thereof | 7.20 | |
| B | LT Temporary Commercial | Rs 100 per kVA per month or part thereof subject to a minimum of Rs 500/- per connection per month or part thereof | 9.90 | Rs 120 per kVA per month or part thereof subject to a minimum of Rs 600/- per connection per month or part thereof | 9.90 |
| C HT Temporary | Rs 120 per kVA per month or part thereof | 9.90 | Rs 120 per kVA per month or part thereof | 9.90 | |
| 9 | Single Point Supply | ||||
| A Residential Complexes | Rs 100 per kVA per month or part thereof | 3.10 | Rs 100 per kVA per month or part thereof | 3.45 | |
| B Commercial Complexes | Rs 200 per kVA per month or part thereof | 4.30 | Rs 200 per kVA per month or part thereof | 4.60 | |
| C | Industrial Complexes | Rs 200 per kVA per month or part thereof | 3.90 | Rs 200 per kVA per month or part thereof | 4.20 |
Further, the Petitioner has submitted a proposal for recovery of service charge from consumers availing power from MSEDCL. The Commission is of the view that schedule of miscellaneous charges have already been approved by the Commission for various services. The Petitioner is directed to submit a separate proposal along with citations of relevant regulations/judgements for determination of charges and information on the consumer number, connected load and energy sales for these type of consumers.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20187.4.3. Revenue from Approved Retail Tariff for FY 2018-19
Based on the retail tariff approved above, the Revenue from approved tariff is shown in the table below. The revenue from LT-AG-Allied Activities, HT-AG-Allied Activities, HT Temporary and Single Point Supply has been not been computed due to non-availability of data on energy sales, connected load and number of consumers for these categories.
Table 58: Revenue from approved retail tariff (In Rs Cr)
| S . No. | Category | Sales (MUs) | Demand Charges (Rs Cr) | Energy Charges (Rs Cr) | Total Charges (Rs Cr) | ABR (Rs/kWh) | K Factor |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 1 | DOMESTIC | 1000.73 | 19.92 | 252.21 | 272.13 | 2.72 | 0.61 |
| (i) | LT-D Domestic | 999.35 | 19.75 | 252.12 | 271.87 | 2.72 | 0.61 |
| 0-100 units | 276.28 | 7.60 | 38.68 | 46.28 | 1.68 | 0.37 | |
| 101-200 units | 251.76 | 3.81 | 52.87 | 56.68 | 2.25 | 0.50 | |
| 201-300 units | 164.13 | 4.22 | 43.50 | 47.71 | 2.91 | 0.65 | |
| 301-400 units | 105.43 | 1.90 | 36.37 | 38.27 | 3.63 | 0.81 | |
| Above 400 units | 201.75 | 2.22 | 80.70 | 82.92 | 4.11 | 0.92 | |
| (ii) | Low Income Group | 1.10 | 0.15 | - | 0.15 | 1.33 | - |
| (iii) | HT-D Domestic | 0.28 | 0.02 | 0.10 | 0.12 | 4.28 | 0.95 |
| 2 | COMMERCIAL | 404.47 | 28.39 | 193.44 | 221.83 | 5.48 | |
| (i) | LT-C Commercial | 325.42 | 15.62 | 149.97 | 165.58 | 5.09 | 1.13 |
| 0-100 units | 49.14 | 3.33 | 16.71 | 20.04 | 4.08 | 0.91 | |
| 101-200 units | 31.05 | 0.81 | 12.73 | 13.54 | 4.36 | 0.97 | |
| 201-400 units | 52.14 | 1.98 | 23.99 | 25.97 | 4.98 | 1.11 | |
| Above 400 units | 193.08 | 9.50 | 96.54 | 106.04 | 5.49 | 1.22 | |
| (ii) | HT-C Commercial | 79.05 | 12.77 | 43.48 | 56.25 | 7.12 | 1.59 |
| 3 | INDUSTRIAL | 2123.52 | 140.71 | 942.75 | 1083.46 | 5.10 | |
| (i) | LT-I Industrial | 137.42 | 4.85 | 51.22 | 56.08 | 4.08 | 0.91 |
| 0-500 units | 19.96 | 2.28 | 6.59 | 8.87 | 4.44 | 0.99 | |
| Above 500 units | 117.46 | 2.58 | 44.63 | 47.21 | 4.02 | 0.90 | |
| (ii) | Low Tension-Mixed/LT-P (Hotel Industries) | 5.31 | 0.21 | 2.50 | 2.70 | 5.09 | 1.13 |
| (iii) | High Tension-I/HT-I | 1398.09 | 106.39 | 626.81 | 733.21 | 5.24 | 1.17 |
| Connected at 11/33 kV | 1165.47 | 96.54 | 524.46 | 621.01 | 5.33 | 1.19 | |
| Connected at 110 kV | 232.62 | 9.85 | 102.35 | 112.20 | 4.82 | 1.08 | |
| (iv) | High Tension- Ferro/SM/PI/SR | 582.70 | 29.26 | 262.22 | 291.48 | 5.00 | 1.12 |
| 4 | AGRICULTURE | 29.94 | 0.97 | 4.25 | 5.22 | 1.75 | - |
| (i) | Low Tension-AG/LT-AGP (Pump Sets/Irrigation) | 23.86 | 0.62 | 3.34 | 3.96 | 1.66 | - |
| (ii) | Low Tension-AG/LT-AGA (Allied Activities) | - | - | - | - | - | - |
| (iii) | High Tension-AG/HT-AGP (Pump Sets/Irrigation) | 6.08 | 0.35 | 0.91 | 1.26 | 2.08 | - |
| (iv) | High Tension-AG/HT-AG (Allied Activities) | - | - | - | - | - | - |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 5 | Military Engineering Services/Defense Establishments | 26.89 | 1.49 | 13.45 | 14.93 | 5.55 | 1.24 |
| 6 | PUBLIC LIGHTING | 36.95 | 0.58 | 15.15 | 15.73 | 4.26 | 0.95 |
| 7 | HOARDINGS/SIGNBOARDS | 0.35 | 0.00 | 0.35 | 0.35 | 9.97 | 2.22 |
| 8 | TEMPORARY | 22.08 | 0.15 | 21.12 | 21.27 | 9.63 | 2.15 |
| (i) | LT | 22.08 | 0.15 | 21.12 | 21.27 | 9.63 | 2.15 |
| LT Domestic | 2.74 | 0.01 | 1.97 | 1.98 | 7.23 | 1.61 | |
| LT Commercial | 19.34 | 0.14 | 19.14 | 19.28 | 9.97 | 2.22 | |
| TOTAL | 3644.93 | 192.21 | 1442.72 | 1634.92 | 4.49 |
The Commission approves revenue from approved Retail Tariff of Rs 1634.92 Cr for the FY
2018-19.
The average increase in the retail tariff now approved by the Commission vis-à-vis the prevailing tariff is 6.37%. The table below provides the category wise Average Cost of Supply (ACoS), Existing Average Billing Rate (ABR), Approved ABR and the existing and approved recovery vis-à-vis the (ACoS).
Table 59: Tariff increase approved by Commission
| Category | ACoS (Rs/kwh) | ABR at Existing Tariff (Rs/kwh) | ABR at Approved Tariff (Rs/kwh) | Increase (%) |
| Domestic | 5.36 | 2.44 | 2.72 | 11.48% |
| Commercial | 5.36 | 5.28 | 5.48 | 3.85% |
| Industrial | 5.36 | 4.82 | 5.10 | 5.90% |
| Agriculture | 5.36 | 1.60 | 1.75 | 8.82% |
| Military Engineering Services | 5.36 | 5.55 | 5.55 | 0.00% |
| Public Lighting | 5.36 | 4.02 | 4.26 | 5.74% |
| Hoardings/Signboards | 5.36 | 9.97 | 9.97 | 0.00% |
| Temporary | 5.36 | 9.60 | 9.63 | 0.37% |
| Total | 5.36 | 4.22 | 4.49 | 6.37% |
7.4.4. Revised Revenue Gap/Surplus
The Govt. of Goa through its letter No. 1/14/2017-Fin/(Bud)/dated 14th December, 2017 has conveyed its consent for providing the required budgetary support to meet the revenue gap for the year as may be approved by the Commission.
In view of above, the Commission approves the revenue gap as follows:
Table 60: Revised Revenue Gap/Surplus approved by Commission (In Rs Cr)
| S. No. | Particulars | FY 2018-19 |
| 1 | Net Revenue Requirement | 1952.54 |
| 2 | Revenue from Retail Sales at Existing Tariff | 1536.97 |
| 3 | Revenue from Retail Sales at Approved Tariff | 1634.92 |
| 4 | Revenue Gap/(Surplus) at Existing Tariff | 415.27 |
| 5 | Revenue Gap/(Surplus) at Approved Tariff | 317.61 |
| 6 | Gap/(Surplus) for the previous year | 0.00 |
| 7 | Total Gap/(Surplus) | 317.61 |
| 8 | Budgetary support from Govt. of Goa | 317.61 |
| 9 | Final Gap/(Surplus) for FY 2018-19 | 0.00 |
The Commission approves Final Revenue gap for the FY 2018-19 as nil.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20187.4.5. Government Budgetary Support
The Commission has approved an overall revenue gap of Rs 415.27 Cr at existing tariff in FY 2018-19. This gap is recovered partly by increase in retail tariff and partly by budgetary support from Govt. of Goa. In case this gap had to be entirely fulfilled by revenue from consumers then it would have demanded an overall average increase of 27.04%. The Commission, in FY 2018-19, has approved an average tariff increase of 6.37%. In case the Govt. had not provided the budgetary support, then an average increase of 19.43% over and above the approved tariff increase would have been required which would have led to a tariff shock to consumers.
It is observed that the Govt. of Goa has been providing budgetary assistance to the Petitioner during the past few years. The Commission in this matter would like to point out the over reliance of the Petitioner on Govt.'s budgetary support. The Petitioner should prepare itself of the repercussions in case the Govt. withdraws the support in the future.
The table below provides the average tariff increase and ABR with and without Govt. budgetary support. The ABR without the Government Budgetary support has been calculated considering the same per unit Gap of Rs 0.87/kWh (Difference between ACoS and ABR at Approved Tariff with Govt. Budgetary Support) is loaded equally among all consumer categories.
Table 61: Cost of Supply and tariff increase with and without Govt. Budgetary support
| Category | ACoS (Rs/kwh) | ABR at Approved Tariff with Govt. Budgetary Support (Rs/kwh) | Increase with Budgetary Support (%) | ABR without Govt. Budgetary Support (Rs/kwh) | Additional Increase without Budgetary Support (%) |
| Domestic | 5.36 | 2.72 | 11.48% | 3.59 | 32.04% |
| Commercial | 5.36 | 5.48 | 3.85% | 6.36 | 15.89% |
| Industrial | 5.36 | 5.10 | 5.90% | 5.97 | 17.08% |
| Agriculture | 5.36 | 1.75 | 8.82% | 2.62 | 49.93% |
| Military Engineering Services | 5.36 | 5.55 | 0.00% | 6.42 | 15.69% |
| Public Lighting | 5.36 | 4.26 | 5.74% | 5.13 | 20.48% |
| Hoardings/ Signboards | 5.36 | 9.97 | 0.00% | 10.84 | 8.74% |
| Temporary | 5.36 | 9.63 | 0.37% | 10.50 | 9.05% |
| Total | 5.36 | 4.49 | 6.37% | 5.36 | 19.43% |
8. Chapter 8. Open Access Charges for the FY 2018-19
8.1. Wheeling Charges
8.1.1. Allocation Matrix - Allocation of ARR into Wheeling and Retail Supply of Electricity
Petitioner's submission:
The Petitioner has bifurcated the ARR into Wheeling and Retail Supply Charges based on the methodology adopted by the Commission in the Tariff Order of FY 2017-18. The Petitioner has submitted the Wheeling Charges as shown in the table below:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 62: Wheeling Charge calculation as submitted by Petitioner
| Particulars | Unit | Formula | FY 2018-19 |
| Wheeling Cost | Rs Cr | A | 477.21 |
| Wheeling Cost at HT/EHT network | Rs Cr | B=A*54.36% | 259.40 |
| Input required for sales at 11 kV and above | MU | C | 2172.07 |
| Wheeling Charges for HT/EHT network usage | Rs/kWh | D=B/C*10 | 1.19 |
| Wheeling Cost for LT network | Rs Cr | E=A*45.64% | 217.81 |
| Input required for sales at LT level | MU | F | 1757.50 |
| Wheeling Charges for LT network usage | Rs/kWh | G=E/F*10 | 1.24 |
Commission's analysis:
The Commission feels that there has to be a proper bifurcation of all expenses between the functions of the wheeling business (wire business) and the retail supply business. The Commission for the purpose of bifurcation of wheeling and retail ARR, is guided by the Staff Paper on "Operationalisation of Open Access in the State of Goa and UT's". The allocation between wheeling and retail supply business for the FY 2018-19 as per the ARR approved in this Order is provided in the table below:
Table 63: Allocation matrix approved by Commission
| Particulars | Allocation (%) | FY 2018-19 | ||||
| Wheeling | Supply | Wheeling | Supply | Total | ||
| Cost of power purchase for full year | 0% | 100% | 0.00 | 1329.68 | 1329.68 | |
| Employee costs | 70% | 30% | 189.29 | 81.12 | 270.41 | |
| Administration and General Expenses | 50% | 50% | 6.92 | 6.92 | 13.84 | |
| Repair and Maintenance Expenses | 90% | 10% | 41.04 | 4.56 | 45.60 | |
| Depreciation | 90% | 10% | 82.43 | 9.16 | 91.59 | |
| Interest and Finance charges | 90% | 10% | 96.47 | 10.72 | 107.19 | |
| Interest on Working Capital | 22% | 78% | 2.35 | 8.33 | 10.68 | |
| Interest on consumer security deposit | 22% | 78% | 1.54 | 5.48 | 7.02 | |
| Return on NFA/Equity | 90% | 10% | 74.94 | 8.33 | 83.27 | |
| Provision of Bad & Doubtful Debt | 0% | 100% | 0.00 | 0.00 | 0.00 | |
| Income Tax | 90% | 10% | 0.00 | 0.00 | 0.00 | |
| Total Revenue Requirement | 494.99 | 1464.29 | 1959.28 | |||
| Less: Non-Tariff Income | 0% | 100% | 0.00 | 6.74 | 6.74 | |
| Net Revenue Requirement | 494.99 | 1457.55 | 1952.54 |
To determine the wheeling charges, the wheeling costs are allocated on the basis of voltage levels. The wheeling charges are levied for the distribution network utilized by the Open Access consumers and primarily comprises of O&M Expenses and other costs as provided in the table above.
The methodology adopted for allocating the derived wheeling costs at respective voltage levels has been elaborated as follows:
• O&M Expenses consisting of Employee, A&G and R&M expenses are allocated to each voltage level on the basis of number of consumers
• All expenses other than the O&M expenses are allocated to each voltage level on the basis of voltage wise asset allocation. The Petitioner in this regard was directed to submit OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 the voltage wise asset allocation but has failed to submit the desired information and in the absence of such information, the Commission has assumed the voltage wise asset allocation.
• The resultant cost at HT/EHT voltage level derived after performing the above steps is then divided between LT and HT/EHT voltage level on the basis of input energy at respective voltage levels, since the HT/EHT network is used by consumers of both HT/EHT and LT voltage levels.
The energy input has been determined assuming the cumulative loss level of HT/EHT voltage as 3.64%, which is the same as approved in the Tariff Order of FY 2017-18. The Petitioner in this regard has failed to submit the voltage wise losses. The resultant losses have been loaded to the LT voltage level in order to maintain the overall Intra-State T&D loss at 10.75% as approved in the ARR of FY 2018-19.
Table 64: Parameters assumed for voltage wise allocation of wheeling costs
| Category | Consumers | Asset Allocation (%) | Sales (MU) | Cumulative Voltage wise Losses (%) |
| Low Tension (LT) Level | 619987 | 60.00% | 1551.84 | 18.83% |
| High Tension (HT)/ Extra High Tension(EHT) Level | 860 | 40.00% | 2093.09 | 3.64% |
| Total | 620847 | 100.00% | 3644.93 | 10.75% |
Accordingly, the Commission approves the Wheeling Charges as shown in the table below:
Table 65: Wheeling Charges approved by Commission
| Category | O&M | Others | Total | Sales (MU) | Wheeling Charges (Rs/kWh) |
| Low Tension (LT) Level | 237.07 | 202.90 | 439.98 | 1551.84 | 2.84 |
| High Tension (HT)/ Extra High Tension(EHT) Level | 0.17 | 54.83 | 55.01 | 2093.09 | 0.26 |
| Total | 237.25 | 257.74 | 494.99 | 3644.93 |
The Commission approves wheeling charge of Rs 2.84/ kWh at LT voltage level and
Rs. 0.26/kWh at HT/EHT voltage level
8.2. Additional Surcharge
Petitioner's submission:
The Petitioner has not proposed any additional surcharge in the Petition for approval.
Commission's analysis:
The Commission has notified the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Connectivity and Open Access in Intra-State Transmission and Distribution) Regulations, 2017. The Regulation 4.5 (1) of the said Regulations states the following:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018"An Open Access Consumer, receiving supply of electricity from a person other than the
Distribution Licensee of his area of supply, shall pay to the Distribution Licensee an additional
surcharge in addition to wheeling charges and cross-subsidy surcharge, to meet the fixed cost of
such Distribution Licensee arising out of his obligation to supply as provided under sub-section
(4) of Section 42 of the Act:
Provided that such additional surcharge shall not be levied in case Open Access is provided to a
person who has established a captive generation plant for carrying the electricity to the
destination of his own use."
Regulation 4.5 (2) of the said Regulations stipulates:
This additional surcharge shall become applicable only if the obligation of the Licensee in terms
of power purchase commitments has been and continues to be stranded or there is an
unavoidable obligation and incidence to bear fixed costs by the Licensee consequent to such a
contract. However, the fixed costs related to network assets would be recovered through
wheeling charges.
Further, Regulation 5.2 (1) (b) states the following:
The quantum of drawal of electricity by a partial Open Access Consumer from the Distribution
Licensee during any Time Block of a Day should not exceed the "Admissible Drawl of Electricity
by the Open Access Consumer" which is the difference of Contract Demand and maximum
quantum of Open Access for which approval has been granted by the Nodal Agency.
[Illustration: If an Open Access Consumer with a Contract Demand of 10 MW has been given an
approval for a maximum Open Access quantum of 6MW for a period of 3 Months, the Admissible
Drawl of Electricity from the Distribution Licensee during any Time Block shall be 4 MW for any
Day during a period of 3 Months.]"
Therefore, in accordance with the above Regulations, the Commission has determined the Additional Surcharge as per the following:
Table 66: Additional Surcharge approved by Commission
| Particulars | FY 2018-19 |
| Total Power Purchase cost approved | 1329.68 |
| Fixed Cost component in Power Purchase Cost (excluding Transmission Charges) | 320.43 |
| Energy Sales (MU) | 3644.93 |
| Additional Surcharge (Rs/kWh) | 0.88 |
Earlier, a consumer availing Open Access was required to pay fixed charges on the contracted load even when the load was drawn partially from the Distribution Licensee. In addition, the consumer was also required to pay wheeling charges, additional surcharge and the cross-subsidy surcharge. As per the Open Access Regulations, 2017, a consumer now is only required to pay fixed charges on Admissible Drawal rather than on the total contracted load.
The Commission approves an Additional Surcharge of Rs 0.88/kwh for FY 2018-19.
The Commission directs the Petitioner to submit quarterly details of the power stranded on account of consumers opting for open access alongwith the Additional Surcharge recovered from these consumers. The Commission will analyse the information and change the applicable Additional Surcharge, if required.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20188.3. Cross-Subsidy Surcharge
Petitioner's submission:
As per the National Electricity Policy, a surcharge is to be levied by the respective State Commission on consumers switching to alternate supplies under the open access. This is to compensate the host distribution licensee serving such consumers who are permitted Open Access under Section 42 (2) of the Electricity Act, for loss of cross-subsidy element built into the tariff of such consumers. An additional surcharge may also be levied under sub-section (4) of Section 42 of the said Act for meeting the fixed cost of the distribution licensee arising out of its obligation to supply in cases where consumers are allowed open access.
Cross-subsidy surcharge (CSS) has been determined in accordance with the formula specified in the Tariff Policy, 2016.
The category-wise CSS applicable arrived on consideration of the components ABR, C, L & D as proposed by the Petitioner is as follows:
Table 67: Cross-Subsidy Surcharge as proposed by the Petitioner
| Particulars | Unit | HT/EHT |
| T (Tariff payable by the relevant category of consumers, including reflecting the Renewable Purchase Obligation) | Rs/kWh | 5.37 |
| C ( per unit weighted average cost of power purchase by the Licensee, including meeting the Renewable Purchase Obligations) | Rs/kWh | 3.58 |
| D (aggregate of transmission, distribution and wheeling charge applicable to the relevant voltage level) | Rs/kWh | 1.19 |
| L (aggregate of transmission, distribution and commercial losses, expressed as a percentage applicable to the relevant voltage level) | % | 3.64% |
| Surcharge | Rs/kWh | 0.59 |
Commission's analysis:
The Commission in this Order has calculated the cross-subsidy surcharge with respect to voltage wise cost of supply. The following approach has been adopted to determine the voltage wise cost of supply:
• Voltage Wise losses are assumed for HT/EHT voltage level. The remaining losses are adjusted in the LT voltage level in order to maintain the Intra-State T&D losses at 10.75%, as approved in the ARR for FY 2018-19. Voltage wise losses assumed at each level have been shown in the table below:
Table 68: Voltage wise losses assumed by Commission
| Category | Voltage Level Loss (%) | Cumulative Losses upto that voltage level (%) |
| Low Tension (LT) Level | 15.76% | 18.83% |
| High Tension (HT)/Extra High Tension (EHT) Level | 3.64% | 3.64% |
| Total | 10.75% | 10.75% |
Using these losses the energy input at each voltage level is determined based on the energy sales. The table below shows the energy input at each voltage level OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018
Table 69: Energy Input at each voltage level (MU)
| Category | Energy Sales (MU) | Cumulative Losses (%) | Energy Input (MU) |
| Low Tension (LT) Level | 1551.84 | 18.83% | 1911.80 |
| High Tension (HT)/Extra High Tension(EHT) Level | 2093.09 | 3.64% | 2172.16 |
| Total | 3644.93 | 10.75% | 4083.96 |
Now the overall ARR approved for FY 2018-19 is divided into variable and fixed ARR with variable ARR comprising of variable component of the power purchase cost and fixed ARR comprising of all the other costs.
The fixed component comprising of fixed cost of power purchase, O&M etc. is further allocated to each voltage category as per the following principles:
• The fixed cost of power purchase is assigned to each voltage level on the basis of energy input at respective voltage levels.
• The O&M expenses are allocated to each voltage level on the basis of the number of consumers. The resultant cost allocated to HT/EHT level is then further allocated between HT/EHT and LT level on the basis of input energy, as the HT/EHT network is utilized by both LT and HT/EHT network consumers.
• The remaining fixed costs are allocated on the basis of voltage wise asset allocation assumed earlier and further allocated to respective voltage levels on the basis of input energy.
Table 70: Parameters used for allocation of fixed costs
| Category | Energy Input (MU) | Voltage wise Asset Allocation (%) | Number of Consumers |
| Low Tension (LT) Level | 1911.80 | 60.00% | 619987 |
| High Tension (HT)/ Extra High Tension (EHT) Level | 2172.16 | 40.00% | 860 |
| Total | 4083.96 | 100.00% | 620847 |
The Variable component of the Power purchase cost is allocated on the basis of energy input.
The Voltage wise cost of supply (VCoS) is then determined on the basis of energy sales of respective categories.
Accordingly, the VCoS is determined as shown in the table below:
Table 71: Voltage Wise Cost of Supply (VCoS)
| Category | Allocated Fixed Cost (Rs Cr) | Allocated Variable Cost (Rs Cr) | Total Cost (Rs Cr) | Energy Sales (MU) | VCoS (Rs/kwh) |
| Low Tension (LT) Level | 796.34 | 386.39 | 1182.73 | 1551.84 | 7.62 |
| High Tension (HT)/ Extra High Tension(EHT) Level | 330.79 | 439.02 | 769.81 | 2093.09 | 3.68 |
| Total | 1127.13 | 825.41 | 1952.54 | 3644.93 |
This, VCoS is then used to determine the Cross-Subsidy Surcharge at each voltage level.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Table 72: Cross-Subsidy Surcharge approved by Commission (Rs/kWh)
| Category | VCoS (Rs/kWh) | ABR (Rs/kWh) | Cross-Subsidy (Rs/kWh) |
| Low Tension (LT) Level | 7.62 | 3.46 | (4.16) |
| High Tension (HT)/Extra High Tension(EHT) Level | 3.68 | 5.24 | 1.56 |
The Commission approves nil Cross-Subsidy Surcharge at LT Voltage level and Rs 1.56/kWh
at HT/EHT Voltage level, in FY 2018-19.
9. Chapter 9: Tariff Schedule
9.1. Tariff Schedule
Table 73: Tariff Schedule
| S. No. | Category | Approved Tariff | |
| Fixed Charges | Energy Charges (Rs/kWh) | ||
| 1 | 2 | 3 | 4 |
| 1 | DOMESTIC | ||
| A | Low Tension-D/LT-D | ||
| 0-100 units | Single Phase Rs 25/Con/Month Three Phase Rs 60/Con/Month | 1.40 | |
| 101-200 units | 2.10 | ||
| 201 to 300 units | 2.65 | ||
| 301 to 400 units | 3.45 | ||
| Above 400 units | 4.00 | ||
| B | Low Tension-LIG/LT-LIG | Rs 40/Con/Month | |
| C | High Tension-D/HT-D | ||
| All Units | Rs 100/kVA/Month | 3.45 | |
| 2 | COMMERCIAL | ||
| A | Low Tension-C/LT-C | ||
| 0-100 units | For consumers with Load upto – Rs 50/Con/Month For consumers with Load more than 20 kW and upto 90 kW- Rs 55/kW/Month | 3.40 | |
| 101-200 units | 4.10 | ||
| 201 units- 400 units | 4.60 | ||
| Above 400 units | 5.00 | ||
| B | High Tension-C/HT-C | ||
| All Units | Rs 250/kVA/month | 5.50 | |
| 3 | INDUSTRIAL | ||
| A | Low Tension-I/LT-I | ||
| 0-500 units | Rs 35/HP/Month | 3.30 | |
| Above 500 units | Rs 35/HP/Month | 3.80 | |
| B | Low Tension-Mixed/LT-P (Hotel Industries) | ||
| All Units | Rs 40/kW/Month | 4.70 |
| 1 | 2 | 3 | 4 |
| C | High Tension-I/HT-I | ||
| Connected at 11/33 kV | Rs 250/kVA/Month | 4.50 | |
| Connected at 110 kV | Rs 250/kVA/Month | 4.40 | |
| D | High Tension-Ferro/SM/PI/SR | ||
| All Units | Rs 250/kVA/Month | 4.50 | |
| 4 | AGRICULTURAL | ||
| A | Low Tension-AG/LT-AGP (Pump Sets/Irrigation) | ||
| All Units | Rs 15/HP/Month | 1.40 | |
| B | Low Tension-AG/LT-AGA (Allied Activities) | ||
| All Units | Rs 20/HP/Month | 1.70 | |
| C | High Tension-AG/HT-AGP (Pump Sets/Irrigation) | ||
| All Units | Rs 35/kVA/Month | 1.50 | |
| D | High Tension-AG/HT-AG (Allied Activities) | ||
| All Units | Rs 60/kVA/Month | 1.90 | |
| 5 | MILITARY ENGINEERING SERVICES/DEFENSE ESTABLISHMENTS | ||
| All Units | Rs 175/kVA/Month | 5.00 | |
| 6 | PUBLIC LIGHTING | ||
| All Units | Rs 50/kW/Month | 4.10 | |
| 7 | HOARDINGS/SIGNBOARDS | ||
| All Units | Rs 60/kVA/Month | 9.90 | |
| 8 | TEMPORARY SUPPLY | ||
| A | LT Temporary Domestic | Rs. 60 per kW per month or part thereof subject to a minimum of Rs 300/- per connection per month or part thereof | 7.20 |
| B | LT Temporary Commercial | Rs. 120 per kVA per month or part thereof subject to a minimum of Rs 600/- per connection per month or part thereof | 9.90 |
| C | HT Temporary | Rs. 120 per kVA per month or part thereof | 9.90 |
| 9 | SINGLE POINT SUPPLY | ||
| A | Residential Complexes | Rs. 100 per kVA per month or part thereof | 3.45 |
| B | Commercial Complexes | Rs. 200 per kVA per month or part thereof | 4.60 |
| C | Industrial Complexes | Rs. 200 per kVA per month or part thereof | 4.20 |
9.2. Applicability
Low Tension Category - Applicable to Power Supply of Voltages at 230V and 440V Voltages when the Sanctioned Load is below 100 KVA/90 KW/120 HP and power is supplied at single/ /three phase.
High Tension/Extra High Tension Category-Applicable to Power Supply of Voltages at 11KV/33KV/110KV and above i.e. High/Extra High Voltages when the Contracted Demand is above 100 KVA/ 90 KW/120 HP and power is supplied at three phase.
Table 74: Applicability of Tariff Schedule
| Category | Applicability | Point of Supply/Notes |
| 1. LT Domestic | This schedule shall apply to private residential houses, government residential quarters, charitable institutions or educational institutions aided by State/ /Central Board, colleges aided by Goa University and religious institutions etc for consumption of energy using normal domestic appliances. The Professionals i.e. individuals engaged in those activities involving services based on professional skills, like Lawyers, Doctors {only those using OPD/consultancy}, Professional Engineers, Chartered Accountants, etc. may utilize the domestic connection at their residence for carrying out their professional work in the nature of consultancy without attracting commercial tariff for the electricity consumed, provided the area used for professional activity does not exceed the area permitted to be used for such activity in residential area as per the prevailing laws/notifications issued by Town and Country Planning Department/other concerned departments of Government of Goa in this regard. | a. For the premises or flats which are closed or locked for a continuous period of more than three months and having sanctioned /connected load more than 10 kW, the monthly minimum charges would be Rs1000/-. |
| 2. HT Domestic | This schedule shall apply to individual residential consumers of Bungalows, Villas, Cottages, etc. using normal domestic appliances and whose contract demand falls within the threshold limit of HT category. | |
| 3. Low Income Group | This schedule shall apply to consumers of Low Income Group who have a sanctioned load of up to 0.1 kW (primarily 2 points with 2 x 40 watts) and who consume up to 30 units per month only. | The applicability of the Low Income Group category will be assessed at the end of each month and in case the consumption exceeds 30 units per month, the entire consumption would be billed at the rate of LTD-/Domestic for that particular month. |
| 4. Commercial – LT and HT | This tariff is applicable to any activity not specifically covered in any other consumer categories, or although covered in another activity, the use is made for a commercial category. It would include electricity used in all non-residential, non-industrial premises and/or commercial premises for commercial consumption meant for operating various appliances. It would include the following categories but not limited to: Houses with rent back facilities • Government hospitals • Professionals not covered in domestic • category. Commercial Complexes and Business • premises, including Shopping malls/show rooms, offices/shops; Combined lighting and power services for • Entertainment including film studios, cinemas and theatres, including multiplexes, Race Course, Meeting/Town Halls, Clubs, all types of Guest houses; Offices including Government Offices, • Commercial Establishments; Marriage Halls (including halls attached • to religious places), Hotels/Restaurants (without boarding facilities), Ice-cream parlours, Bakeries, Coffee Shops, private educational institutions, private hospitals, private messes, Internet/Cyber Cafes, Mobile Towers, Microwave Towers, Satellite Antennas used for telecommunication activity, Telephone Booths, Fax/Xerox Shops, X-ray installations, bars and cold drink houses, Tailoring Shops, Computer Training Schools, Typing Institutes, Photo Laboratories, Photo Studios, Laundries, Beauty Parlours and Saloons, dry cleaners etc Automobile and any other type of repair • centers, Retail Gas Filling stations, Petrol Pumps and Service Stations including Garages, Tyre Vulcanizing units, Battery Charging Units, Tyre vulcanizing centres etc; Banks, Telephone Exchanges, TV Station, • Micro Wave Stations, All India Radio (AIR) Stations, ATM Centres etc; For common facilities, like Water • Pumping/Street Lighting/Lifts/Fire Fighting Pumps/Premises (Security) Lighting, etc. in Commercial Complexes; Sports Clubs, Health Clubs, Gymnasium, • | Cold Storages which are solely attached to Agriculture and its allied activities shall be charged tariff of Agriculture Allied activities. All other cold storages which are partly or not attached with Agriculture and Allied activities shall be charged commercial tariff. |
| Swimming Pools; Research and Development units situated • outside Industrial premises; Airports, Railways, Railway Stations, Bus • stands of KTC etc; | ||
| 5. LT Industrial | This tariff shall apply to industrial units engaged in industrial activities, manufacturing process etc. It would include the following categories but not limited to: Flour Mills, wet grinding, Dal Mills, Rice • Mills, Poha Mills, Masala Mills, Saw Mills, Power looms including other allied activities like Warping, Doubling, Twisting, etc. Ice Factories, Ice Cream Manufacturing • units/Plants, Dairy Testing Process, Milk Dairies, Milk Processing/Chilling Plants (Dairy) etc; Engineering workshops, Engineering • Goods Manufacturing units, Printing Presses, Transformer repairing Workshops, Tyre retreading units, Motive Power Loads etc; Mining, Quarry and Stone Crushing units • etc; Garment Manufacturing units, • LPG/CNG Bottling plants etc; • Sewage Water Treatment Plants/ • Common Effluent Treatment Plants owned, operated and managed by Industrial Associations and situated within industrial area. Pumping of water for public water • supply, Sewage Treatment Plants, activities related with public water Supply Schemes and Sewage Pumping Stations. Use of electricity/power supply for • activities/facilities exclusively meant for employees of the industry within the premises of the Industry. IT Industry, IT parks etc. • | The above mentioned tariff is based on the supply being given through a single delivery and metering point and at a single voltage. |
| 6. LT Mixed – Hotel Industries | This schedule shall apply to Hotels/ restaurants with lodging and boarding facilities. | Hotel Industry consumers intending to avail the facility of this tariff should produce a certificate from the Tourism Department stating that the intending applicant is registered under Goa Registration of Tourist Trade Act, 1982 and in the Hotel |
| business on a regular basis. On receipt of the certificate, such tariff shall be made effective from the date of original validity of the certificate. In case of failure to produce the certificate, the same shall be considered under Commercial category. | ||
| 7. HT Industrial | This schedule shall apply to consumers taking electricity supply for Industrial purpose. It shall also include the following categories: Bulk Supply of power at 11 KV, 33 kV /110 • KV and above for industries, factories and other industrial purposes. Bulk supply of power at 11 KV and above • for educational institutions owned or aided by Government, non-industrial establishments, Industrial units engaged in Ice • Manufacturing Units; Hotels with lodging and boarding • facilities etc Use of electricity/power supply by an • establishment such as IT Industries, IT Parks, IT Units Pumping of water, public water supply, • public water treatment plant, activities related with Supply Schemes and Sewage Treatment Plants, Sewage Pumping Stations etc | |
| 8. HT Ferro Metallurgical /Steel Rolling/Steel Melting/Power Intensive | This schedule shall apply to supply of power having a Contract Demand from 100 KVA up to 1000 KVA at 11 KV and above 1000 KVA at 33 KV for Steel rolling industry and Metal Alloy, Steel Melting, Ferro Alloy, and Ferro metallurgical industries where melting is involved using electric power. | |
| 9. LT and HT Agriculture Pump sets | This schedule shall apply to establishments for Irrigation pumping, De-watering and Lift Irrigation for cultivation of food crops such as cereals, pulses, vegetables and fruits etc and Cane crusher and/or fodder cutter for self-use for Agricultural purposes. | This tariff shall be applicable from the date of production of a certificate from the Directorate of Animal Husbandry or Agriculture Department of Government of Goa to the effect that the consumer carried on the said activity on regular basis. In |
| 10. LT and HT Agriculture Allied Activities | This schedule shall apply to establishments for other allied activities related to Agriculture and shall include but not limited to: Poultry farms, Livestock farms, • Combination of livestock farms with dairy, Piggery etc Horticulture, Green Houses, Plantations, • all types of nurseries etc. Fish farms including ornamental fish • farms, prawn farms, other aqua farms etc Tissue culture, Mushroom activities, • Aquaculture, Floriculture, Fisheries, Sericulture, Floricultural nurseries, hatcheries etc Any other agricultural activity not falling • under HT-Agriculture (A) shall be covered under this category | case of failure to produce the certificate, the same shall be considered under Commercial category. Cold Storages which are solely attached to Agriculture and its allied activities shall be charged tariff of Agriculture allied activities. All other cold storages which are partly or not attached with Agriculture and Allied activities shall be charged Commercial Tariff. |
| 11. MES/Defense Establishments | This schedule shall apply to supply of power for defense installation establishments, having mixed load with predominantly lighting or non-industrial load of more than 50% of connected load. | |
| 12. LT Public Lighting | This schedule shall apply to public lighting systems. It would include the following categories but not limited to: Market Places, Roads, Pathways and • Parking Lighting belonging to local authorities such as Municipality/ Panchayats/Government; Lighting in Public Gardens; • Traffic Signals and Traffic Islands; • State Transport Bus Shelters; • Public Sanitary Conveniences; and • Public Water Fountains and such other • Public Places open for general public free of charge. Street lighting in the colony of a factory • which is situated separately from the main factory. This shall also be applicable to public • lighting of Government/Semi Government Establishments but shall not be applicable in case of private establishments | |
| 13. LT Hoardings/ Sign Boards | This schedule shall apply to lighting advertisements, hoardings and displays at departmental stores, malls, multiplexes, theatres, clubs, hotels, bus shelters, Railway Stations etc. and shall be separately metered and charged at the tariff applicable for | |
| "Hoardings/Sign Board" category. However use of electricity for displays for the purpose of indicating/displaying the name and other details of the shop, on commercial premises itself, shall be covered under the prevailing tariff for such shops or commercial premises. | ||
| 14. LT Temporary Supply | a) LT Temporary Domestic: This schedule shall apply to usage of electricity for all religious purposes or public functions for non-commercial purposes. It shall also apply for construction of own house by an individual with single tenement b) LT Temporary Commercial: This schedule shall apply to usage of electricity for any of the activities not covered under LT Temporary Domestic. It would include but not be limited to: • All other Constructions including renovation, of all type of structures/ infrastructure, including buildings, bridges, flyovers, dams, power stations, roads, aerodromes, tunnels for laying of pipe lines for all purposes | i. The temporary connection shall be released through a proper meter ii. These temporary tariffs are applicable for temporary supply for a period not exceeding three months which may be extended beyond that period only with the prior permission of the Chief Electrical Engineer, up to a maximum period of six months for general purpose and two years for construction activities. iii. Security deposit shall be collected in advance for an assessed 3 months billing. |
| 15. HT Temporary Supply | This schedule shall apply to usage of electricity for all temporary purposes. | |
| 16. HT SPS Single Point Supply | This schedule shall apply to a group of consumers who desire to take a HT connection at single point for consumption of energy within a Residential Complex – Group Housing Societies, Residential Housing Colonies, Cooperative Group Housing Societies, Township Areas; Commercial Complexes, including Malls; Industrial Complexes, including IT Parks, Bio-Parks or other entities classified as industries by the Government of Goa. | In case of a dispute on whether the complex can be classified as an industrial complex, a certificate from Industries Department, Government of Goa will be required. The following shall be the different combinations for SPS in a defined area: i. All LT consumer mix area ii. All HT consumer mix area iii. HT+LT consumer mix area a. The General Conditions, Miscellaneous and General Charges would also be applicable for all SPS categories. b. Based on technical and administrative feasibility, the ED-Goa may consider |
| providing SPS power supply at HV/EHV level to a complex at a mutually agreed injection point. c. The SPS arrangement would be applicable for the application received from a Residential complex/Association of Persons (AOP)/Developer of the complex or any other such similar person. d. The SPS arrangement would be considered by ED-Goa only if the minimum sanctioned cumulative contracted demand of the complex (group of consumers) is 1.15 MVA/1 MW. e. The complete cost of erection and O&M for the sub-transmission and distribution infrastructure within such complex would need to be borne by the said SPS applicant. f. The SPS applicant would be required to develop and maintain an efficient, co-ordinated and quality sub-transmission and distribution system in its area of electricity supply. Further, the applicant would be responsible to comply with Standards of Performance and Supply Code Regulation as laid down under JERC Regulations and guidelines of Goa Electricity Department, if any. The network within the complex will need to be certified by the Chief Electrical Inspector. g. For Residential Complexes, SPS application shall be entertained for groups of LT consumers only. The loads of common amenities for such group may include pumps for | ||
| pumping water supply, lifts and lighting of common area. However, the consumption of energy for common services shall be separately metered with meters installed by the consumer and tested and sealed by licensee. The consumption of such energy over and above 10% of the total consumption of energy shall be billed at LT Commercial Tariff. The user shall inform the details of every non- domestic activity within the residential complex, such as commercial complex, industrial activity, and recreation club, along with the connected load to the licensee at the time of seeking the connection or at the time of enhancement in contract demand, and shall seek a separate connection for the same in case the common load is more than 10%. h. Individual Domestic HT consumers in a residential complex that opt for SPS shall need to apply separately under HT Domestic category. i. The SPS applicant shall not charge tariff to the downstream consumers higher than stipulated. j. The applicant shall be obliged to pay the total tariff (total billed amount) due to ED-Goa, as measured at HT end of SPS. However, to cover energy transformation losses and other O&M expenses, such applicant would be eligible to get rebates from ED-Goa on full bill payment, within | ||
| the due time: i. 5% on the overall billed amount in all cases of LT and HT consumers ii. Any other loss would be to the account of the applicant. k. For CC and IC applicant, any LT/HT Consumer in the area should have minimum 80% pre- dominant load of their appropriate category i.e. mix load is allowed only upto 20%. For e.g. If a HT/ /LT Industry Consumer has Factory, Residential Colony for its workers and also some Commercial facilities for his staff and the total of Residential and Commercial load is say around 30%, then separate Individual SPD connection may be taken for each such group as per activity. l. The implementation of SPS arrangement should be in accordance with the Electricity Act, 2003 and APTEL judgement dated 11th July 2011 in appeal No. 155 and 156 of 2010 in this regard. |
1) These tariffs are proposed to be made applicable from 1st April 2018 and shall remain valid till further Orders of the Commission.
Tariffs are subject to revision and/or surcharge that may be levied by ED-Goa from time to time as per the directives of the Commission.
2) The tariffs are exclusive of electricity duty and taxes levied by the Government or other competent authority from time to time which are payable by the consumers in addition to the charges levied as per the tariffs.
3) Unless otherwise agreed to, these tariffs for power supply are applicable for supply at one point only.
4) Unless specifically stated to the contrary the figures of energy charges relate to rupee per unit (kWh) charge for energy consumed and fixed charge relates to a month.
5) If the energy supplied for a specific purpose under a particular tariff is used for a different purpose not contemplated in the contract for supply and/or for which a higher tariff is OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 applicable, it shall be deemed as unauthorized use of electricity and shall be assessed under the provisions of section 126 of the Electricity Act, 2003 and Supply Code Regulation 2010 notified by the JERC.
6) If connected load of a domestic category is found to be at variance with the sanctioned/contracted load as a result of replacement of appliances such as lamps, fans, fuses, switches, low voltage domestic appliances, fittings, it shall not fall under Section 126 and Section 135 of the EA 2003.
7) Fixed charges, wherever applicable, will be charged on pro-rata basis from the date of release of connection. These shall be double in case bi-monthly billing is carried out and shall be proportionately calculated as per the number of days of billing, Similarly slabs of energy consumption shall also be considered accordingly in case of bi-monthly or periodic billing.
8) The consumption for factory lighting/pump house lighting shall be billed as per respective main tariff category. A separate energy meter for recording energy consumed towards factory lighting for new installation need not be provided. For the existing installations, till the factory lighting meter's mains are shifted to main meter, the total energy consumption shall be arrived at by adding the energy consumption of the main energy meter and the factory lighting meter.
9) Supply of power in all cases shall be subject to the execution of Agreement between the Electricity Department, Goa and consumers and as per the JERC (Electricity Supply Code) Regulation 2010. The other conditions, definitions etc. shall be applicable as per the Electricity Act 2003 and various JERC Regulations, such as Standards of Performance, Supply Code, Conditions of Supply, Distribution Code etc., issued from time to time.
10) Billing of Demand in excess of Contracted Demand
The billing shall be on the maximum demand recorded during the month or 85% of contracted demand whichever is higher. If in any month, the recorded maximum demand of the consumer exceeds its contracted demand, that portion of the demand in excess of the contracted demand shall be billed at double the normal rate. Similarly, energy consumption corresponding to excess demand shall also be billed at double the normal energy rate.
The definition of the maximum demand would be in accordance with the provisions of the JERC (Electricity Supply Code) Regulations, 2010. If such over-drawal is more than 20% of the contracted demand then the connection shall be disconnected immediately.
Explanation:
Assuming the contract demand as 100 kVA, maximum demand at 120 kVA and total energy consumption as 12000 units, then the consumption corresponding to the contract demand will be 10,000 units (12000 X 100/120) and consumption corresponding to the excess demand will be 2000 units. This excess demand of 20 kVA and excess consumption of 2000 units will be billed at twice the respective normal rate. e.g. in case of HTI/Industrial category, excess demand and consumption will be billed at the rate of Rs 500 per kVA per month and Rs 9.00/kWh respectively. Connections drawing more than 120 kVA shall be disconnected immediately.
11) The adjustment because of Fuel and Power Purchase Cost variation shall be calculated in accordance with the FPPCA formula separately notified by the Commission under the OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 Regulation. Such charges shall be recovered/refunded in accordance with the terms and conditions specified in the FPPCA formula.
12) The values of the 'K' factor applicable for the different consumer categories for use in the FPPCA formula shall be as specified in Section 7.4.3 of this Tariff Order.
13) Power Factor Charges for HT and EHT
a) 'Power Factor' means, the average monthly power factor and shall be the ratio expressed as a percentage of the total kilowatt hours to the total kilovolt ampere hours supplied during the month; the ratio being rounded off to two decimal figures.
b) The consumer shall maintain the monthly average power factor of the supply not less than 90% (lagging). If the monthly average power factor of (a) consumer falls below 90% (0.9 lagging), such consumer shall pay a surcharge in addition to his normal tariff @ 1% on billed demand and energy charges for each fall of 1% in power factor upto 70%(lagging).
c) In case the monthly average power factor of the consumer is more than 95% (95% lagging), a power factor incentive @ 1% on demand and energy charges shall be given for each increase of 1% in power factor above 95% (lagging).
d) If the average power factor falls below 70% (lagging) consecutively for 3 months, the licensee reserves the right to disconnect the consumer's service connection without prejudice for the levy of the surcharge.
14) For staff quarters, rest/guest houses, street lighting in the colony of a factory which is situated separately from the main factory and for distribution lines, service lines, etc. permitted to be owned and maintained by the HT consumer owning the factory, there shall be a separate connection and such energy consumed shall be charged under Single Point Supply.
15) Advance Payment Rebate: If payment is made in advance well before commencement of the consumption period for which the bill is prepared, a rebate @ 1% per month shall be given on the amount (excluding security deposit, taxes and duties) which remains with the licensee at the end of the month. Such rebate, after adjusting any amount payable to the licensee, shall be credited to the account of the consumer.
If payment is made in advance along with prior declaration of premises to be closed for a certain period of time, a rebate of 1% per month shall be given on the amount (excluding security deposit, taxes and duties) which remains with the licensee at the end of the month. Such rebate, after adjusting any amount payable to the licensee, shall be credited to the account of the consumer.
16) Prompt Payment Rebate: If payment is made at least 7 days in advance of the due date of payment a rebate for prompt payment @ 0.25 % of the bill amount (excluding taxes and duties) shall be given. Those consumers having arrears shall not be entitled for such rebate and the amount paid will first be used to set off past liabilities.
17) Delayed Payment Charges (DPC): In case the electricity bills are not paid within the due date mentioned on the bill, delayed payment charges of two percent (2%) (computed on a daily basis on the outstanding bill from the due date till the date of payment) shall be levied OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 on the bill amount. However, if a consumer makes part payment of a bill (in exceptional circumstances, with prior approval of the Chief Electrical Engineer), within the due date, then the delayed payment charges shall be applicable only on the amount which was not paid within the due date.
Such surcharge shall be rounded off to the nearest multiple of one rupee. Amount less than 50 paise shall be ignored and amount of 50 paise or more shall be rounded off to the next rupee.
If the consumer fails to pay the energy bill presented to him by the due date the department shall have the right to disconnect the supply after giving 15 days' notice as per provision of the Electricity Act 2003 and Supply Code Regulations 2010 of JERC as amended from time to time.
In case of non-realization of payment through Cheque, a penalty of 5% of the cheque amount in addition to the Delayed Payment Charges (DPC) will be levied on the consumers.
18) Time of Day Tariff (ToD ):
i. Under the Time of Day (ToD) Tariff, electricity consumption and maximum demand in respect of HT/EHT consumers for different periods of the day, i.e. normal period, peak load period and off peak load period, shall be recorded by installing a ToD meter.
ii. The maximum demand and consumption recorded in different periods shall be billed at the following rates on the tariff applicable to the consumer.
Table 75: Applicability of ToD Tariff
| Time of use | Demand Charges | Energy Charges |
| Normal period (7:00 a.m. to 6:00 p.m) | Normal Rate | Normal rate of energy charges |
| Evening peak load period (6:00 p.m to 11.00 p.m) | Normal Rate | 120% of normal rate of energy charges |
| Off-peak load period (11:00 p.m to 7:00 a.m) | Normal Rate | 90% of normal rate of energy charges |
iii. Applicability and Terms and Conditions of TOD tariff:
a) TOD tariff is mandatory for HT/EHT consumers and shall be optional for LT industrial and commercial consumers
b) The facility of aforesaid TOD tariff shall not be available to HT/EHT consumers having captive power plants and/or availing supply from sources other than ED-Goa through wheeling of power.
c) The HT/EHT industrial consumers who have installed standby generating plants shall also be eligible for the aforesaid TOD tariff.
d) In the event of applicability of TOD tariff to a consumer, all other terms and conditions of the applicable tariff shall continue to apply.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20189.4. Schedule of Miscellaneous Charges
Table 76: Schedule of Miscellaneous Charges
| Description | Approved Charges |
| Monthly Meter Rental Charges (as per provisions of Regulation 7.3 (1) of JERC [Electricity Supply Code] Regulations 2010) | |
| Single Phase LT meter | Rs 10/month |
| Three Phase LT meter | Rs 20/month |
| Three Phase LT meter with CTs | Rs 50/month |
| LT Meter with MD Indicator | Rs 30/month |
| Tri-vector Meter | Rs 1000/month |
| Temporary Supply | Shall be twice as applicable in above meter types |
| Changing or moving a Meter board | Actual Cost + 15% |
| Note: a. For all domestic and other LT loads less than 50 kW loads in Urban and Rural areas-Static single phase/three phase meters b. For LT (contracted load ≥ 50 KW)/HT/EHT consumer–Static, 3 Phase Tri-vector meters with MDI (MD Display) | |
| R econnection Charges (as per provisions of Regulation 9.3 (c) of JERC [Electricity Supply Code] Regulations 2010) | |
| LT Services – At Cut outs | |
| Single Phase • | Rs. 25/- |
| Three Phase • | Rs. 50/- |
| LT Services – At Overhead Mains | |
| Single Phase • | Rs. 30/- |
| Three Phase • | Rs. 50/- |
| LT Services – At Underground Mains | |
| Single Phase • | Rs. 75/- |
| Three Phase • | Rs. 125/- |
| HT Services | Rs. 200/- |
| Note: If the same consumer seeks reconnection within 12 months from the date of reconnection or disconnection, 50% will be added to above charges | |
| Re-Rating of Installations | |
| Lighting Installation | Rs. 25/- |
| Motive Power Installation | Rs. 50/- |
| Testing Fee for Various Metering Equipments (as per provisions of Regulation 7.4 of JERC (Electricity Supply Code) Regulations 2010 | |
| Single phase LT | Rs. 25/energy meter |
| Poly Phase LT without CT | Rs. 50/energy meter |
| L.T. meter with CTs/Demand or Special Type Meters | Rs. 150/energy meter |
| H.T and E.H.T. metering equipment | Rs. 10000/- at site |
| Transformer Oil | Rs. 200/- per sample |
| 3 – Ø Phase Tri-vector Meter Industrial LT Consumer | Rs. 1000/- for laboratory testing |
| 3 – Ø Phase Tri-vector Meter 11 KV and 33kV HT Consumer | Rs. 5000/- at site |
| Three Phase Tri-Vector Meter 110 KV EHT Consumers | Rs. 1000/- at site |
| Combined CTPT Unit for 11kV and 33kV Consumer | Rs. 2500/- |
| 110KV CT/PT Unit | Rs. 10000/- |
| Single Phase CT | Rs. 150/unit |
| Three Phase TT Block | Rs. 500/unit |
| Distribution Transformer Testing (HT con.) | Rs. 6000 |
| Power Transformer Testing ( EHT consumer) | Rs. 20000 |
| Service Connection Charges (as per provisions of Regulation 3.3 (3) of JERC (Electricity Supply Code) Regulations 2010 | |
| Single Phase 1 ф | Rs. 250 |
| Three Phase 3 ф | Rs. 500 to Rs 1200 |
| HT (First 500 KVA) | Rs. 10000 |
| HT (Beyond 500 KVA) | Rs. 20000 |
| Extra Length for 1 ф (beyond 30 meters) | Rs. 50/meter |
| Extra Length for 1 ф for agricultural consumers (beyond 300 meters) | Rs. 25/meter |
| Extra Length for 3 ф (beyond 30 meters) | Rs. 100/meter |
| Extra Length for 3 ф for agricultural consumers (beyond 300 meters) | Rs. 50/meter |
| Testing Consumer's installation (as per provisions of Regulation 4.10 (6) of JERC (Electricity Supply Code) Regulations 2010 | |
| For first test of the new installation on or off an extension to an existing installation if the installation is found to be defective. | NIL |
| For Subsequent test of the new installation or of an existing installation if the installation is found to be defective | |
| • Single phase LT | Rs 100/- |
| • Three phase | Rs 200/- |
| • MS/BS loads upto 70kW | Rs 4000 + ST |
| • LS/BS/RT (loads Above 70kW) Changing the Meter or its position in the same premises at the request of the consumer when no additional material is required (as per provisions of Regulation 6.3 c) of JERC (Electricity Supply Code) Regulations 2010 | Rs 8000 + ST |
| Single phase | Rs. 100/- |
| 3-phase without C.Ts | Rs. 200/- |
| L.T. meter with C.T.s | Rs. 500/- |
| H.T and E.H.T. metering equipment | Rs. 8000 + ST |
| Re-sealing charges irrespective of the number of seals involved against each item below and where seals found to have been broken by the consumer | |
| Meter cupboard/Meter Cubical/Box | Rs. 50/- |
| Where cut-out is independently sealed | Rs. 50/- |
| Meter cover or Meter Terminal cover | Rs. 50/- |
| Meter cover of Meter Terminal cover (3 phase). | Rs. 50/- |
| Maximum demand Indicator or C.T.s chamber | Rs. 50/- |
| Service Charges | |
| General Supply | |
| • Single Phase | Rs. 10/- |
| • Three phase below 70kW | Rs. 20/- |
| • Three phase above 70kW | Rs. 50/- |
| Industrial/bulk/agriculture/Street Lightning Supply | |
| • Upto70kW | Rs. 25/- |
| • Above 70kW | Rs. 50/- |
| Replacement of broken glass | |
| Replacement of broken glass of meter cupboard (When there is default on Consumer Side) | Rs. 50/- |
| Replacement of broken Glass of single phase meter if the consumer has broken or tamper and with meter. | Rs. 50/- |
| Replacement of broken Glass of three phase meter if the consumer has broken or tamper and with meter | Rs. 50/- |
| Supply of duplicate copies of electricity bills | |
| Domestic Consumers | Rs. 5 per bill or Rs. 10 per statement |
| Non Domestic consumers | - |
| LT Industrial upto 20kW and AP Consumer | - |
| H.T Industrial and Bulk supply consumer | Rs. 5 per bill or Rs. 10 per statement |
10. Chapter 10. Fuel and Power Purchase Adjustment Mechanism
The State of Goa and Union Territories of Andaman & Nicobar Islands, Lakshadweep Island, Chandigarh, Daman & Diu, Dadra & Nagar Haveli and Puducherry receive power from the Central Generating Stations, State Generating Stations, Independent Power Producer's (IPP's) through the long-term power purchase agreements and short-term purchases – through exchange, bilateral purchases etc. The distribution licensees procure power from various available sources and supply power to the consumers at retail tariffs determined by the Commission. Power purchase cost accounts for more than 80% of the Annual Revenue Requirements (ARR) of the distribution licensees and includes the cost paid for procurement of power, transmission charges, Deviation Settlement Mechanism (DSM) charges, State Load Despatch Center (SLDC)/Regional Load Despatch Center (RLDC) charges and is netted off with revenue earned from the sale of surplus power.
The cost of the long-term power being procured by the distribution licensees is fixed by the Central Electricity Regulatory Commission (CERC) for plants supplying power to more than one State/UT (for example NTPC, NHPC etc.) and by the JERC for plants located within the region (for IPP's, licensees own generation and other State generating sources). Charges for the Over- drawal/Under-drawal from the Grid and the Inter-State Transmission charges, RLDC charges are fixed by the CERC, while Intra-State Transmission charges and SLDC charges are fixed by the JERC. Short term purchase/sale of power is done through traders, bilateral contracts, banking and power exchanges at market-determined prices.
While determining retail tariff for any year, the Commission first determines the ARR based on the projection of various cost elements including power purchase cost. Power purchase cost of the distribution licensee is derived from the power purchase quantum and per unit power purchase cost. Quantum of power purchase depends upon the energy sales to the retail consumer and distribution losses, out of which energy sales is not under the control of the distribution licensee. There is also variation in actual per unit power purchase cost vis-a-vis projected per unit power purchase cost due to change in fuel cost, change in power purchase mix i.e. thermal/hydel/renewable mix, long term/short term power mix etc. This makes power purchase cost uncontrollable in nature.
The Commission undertakes the truing up exercise for the variation in the cost and revenue once the audited accounts of the distribution licensee are available. For example, True-up of FY 2016-17 will be undertaken by the Commission once the audited accounts of FY 2016-17 are available. If the audited accounts for FY 2016-17 are prepared timely, the impact of true-up of various cost and revenue items is allowed in the tariff of FY 2018-19, along with the carrying cost for 2 years as the power purchase cost is the major cost element of the ARR of the distribution licensee, adjustment due to change in power purchase cost at regular intervals is important in order to avoid the burden of carrying cost on the additional power purchase cost incurred during the year.
10.1. Legal Provisions
The relevant provisions of the Electricity Act, Regulations, Policy document and the ATE judgments, which enable the Commission to devise, adopt and implement a power purchase/ fuel price adjustment mechanism are as follows:-
(a) Indian Electricity Act, 2003- Section 62 (4)
"No tariff or part of any tariff may ordinarily be amended more frequently than once in any
financial year, except in respect of any changes expressly permitted under the terms of any
fuel surcharge formula as may be specified."
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018(b) Tariff Policy, 2016, clause 5.11 – sub-clause (h-4)
"Uncontrollable costs should be recovered speedily to ensure that future consumers are not
burdened with past costs. Uncontrollable costs would include (but not limited to) fuel
costs, costs on account of inflation, taxes and cess, variations in power purchase unit costs
including on account of adverse natural events."
(c) Tariff Policy, 2016, clause 8.2– sub-clause 8.2.1-(1)
"8.2 Framework for revenue requirements and costs
Actual level of retail sales should be grossed up by normative level of T&D losses as
indicated in MYT trajectory for allowing power purchase cost subject to justifiable power
purchase mix variation (for example, more energy may be purchased from thermal
generation in the event of poor rainfall) and fuel surcharge adjustment as per regulations
of the SERC."
(d) Hon'ble ATE judgement in OP1 of 2011 dated 11 November, 2011
The Hon'ble ATE directed the SERCs to develop a power purchase cost adjustment mechanism within six months of the date of the Order. The relevant excerpt of the Order is shown as follows:
"(vi)Fuel and Power Purchase cost is a major expense of the distribution Company which is
uncontrollable. Every State Commission must have in place a mechanism for Fuel and
Power Purchase cost in terms of Section 62 (4) of the Act. The Fuel and Power Purchase
cost adjustment should preferably be on monthly basis on the lines of the Central
Commission's Regulations for the generating companies but in no case exceeding a
quarter. Any State Commission which does not already have such formula/mechanism in
place must within 6 months of the date of this Order must put in place such
formula/mechanism."
10.2. Existing formula
The Commission first introduced the provision for adjustment of fuel surcharge in the Joint Electricity Regulatory Commission for the State of Goa and UT's (Terms and conditions for determination of tariff) Regulations, 2009 notified on 08 February 2010. The relevant Clause 7 of the Regulations is provided below:
"7. Fuel Surcharge Formula
(1) The fuel cost revisions for the generating companies/units owned by the licensee that are due
to reasons beyond the control of the generating companies/the licensee be in accordance with
the fuel surcharge formula as may be decided by the Commission from time to time.
(2) The generating company or the licensee may determine such charge in accordance with the
specified formula and recover the same from such categories of consumers or the licensees, as the
case may be after following procedure and the terms and conditions attached thereto."
The Commission subsequently notified the Joint Electricity Regulatory Commission for the State of Goa and UT's (Terms and conditions for determination of tariff) (First Amendment) Regulations, 2009 on 27 June, 2012 prescribing the methodology for determination and the recovery mechanism of Fuel & Power Purchase Cost Adjustment (FPPCA) formula. Subsequently on 18 January, 2013, the Commission issued a Corrigendum correcting the calculations of the FPPCA for certain consumer categories.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018On 30 June, 2014 the Commission notified the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (except Delhi) (Multi-Year Distribution Tariff) Regulations, 2014 wherein the Commission proposed to adopt the same methodology as prescribed in the Joint Electricity Regulatory Commission for the State of Goa and UT's (Terms and conditions for determination of tariff) (First Amendment) Regulations, 2009 in the MYT Period. Clause 19 of the Regulations is shown as follows
"19. Treatment of Incremental Power procurement cost
The Distribution Licensee shall recover the incremental cost on account of fuel & power purchase
adjustment in accordance with FPPCA formula provided in JERC Terms & Condition for
determination of Tariff (first amendment) Regulations, 2009."
On 19 October, 2016 JERC notified the Joint Electricity Regulatory Commission for the State of Goa and UT's (Multi-Year Distribution Tariff) (Second Amendment) Regulations, 2016 according to which the Fuel and Power Purchase cost adjustment charge shall be levied by distribution licensees on consumer electricity bills on account of the incremental power purchase cost incurred by the licensees and the Transmission charge recovery was also added to the formula. The relevant amendment to the Regulation has been shown as follows:
"1. Recovery Periodicity (Cycle)
The licensee shall compute fuel and power procurement cost variations on quarterly basis
and adjustment shall be made in consumers bills starting after a month following the end
of the quarter on units billed in the month under consideration. For example, Fuel &
Power Purchase Cost Adjustment (FPPCA) for the quarter April-May-June shall be made
in the month of July and shall be reflected in the consumer bills raised in the months of
August-September and October on the units billed for the respective months. The formula
shall be applicable prospectively for the purpose of consideration of Fuel and Power
Purchase Cost Adjustment. FPPCA shall be done for all consumer categories except
Below Poverty Line (BPL) and Agriculture consumers
2. Formula
The formula for determination of per unit Fuel & Power Purchase Cost Adjustment
("FPPCA") is as under:
Per Unit FPPCA (Paisa/unit) = Per Unit Actual cost of Power Purchase - Per Unit
Approved Cost of Power Purchase in Tariff Order
Where
Where:
• : Actual cost of power purchased during the quarter (excluding purchase
from unapproved bilateral and other unapproved sources) includes transmission
charges of PGCIL but excludes SLDC charges, RLDC charges and reactive energy
charges (Rs crores).
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018• : Actual Revenue recognized from Sale of power to persons other than
consumers of the licensee during the quarter (Rs crores).
• : Approved per unit cost of power purchase for use in the FPPCA formula as given in the Tariff Order of the Licensee (Paisa per unit).
• : Actual Energy units (kWh) procured during the quarter in consideration
excluding unapproved sources (million units).
• : Actual Energy Units (kWh) procured during the quarter in consideration (million
units) from power exchanges, power generation within the periphery of the licensee
& used by licensee and units overdrawn from the grid.
• : Approved inter-state transmission losses for the year in consideration
as provided in the Tariff Order (%).
• : Approved T&D losses for the year in consideration as provided in the
Tariff Order (%).
• : Actual Sale of power to persons other than the utility consumers (million units)
during the quarter.
• : Actual energy units billed for BPL and Agriculture category consumers (million
units).
3. Other Terms and conditions
a) For the purpose of Fuel and Power Purchase Cost Adjustment, all the bills admitted
and credits, if any, received by the distribution licensee during the period in
consideration, irrespective of the period to which they pertain shall be considered.
However, the bills or credits of earlier period received by the distribution licensee
earlier than the period under consideration will not be considered for the purpose of
FPPCA.
b) The variation in fuel and power purchase cost adjustment with respect to the
approved per unit power purchase cost, as per the formula specified above shall be
recoverable/payable based on units billed for each category of consumers except
BPL & Agriculture.
c) Per unit rate of FPPCA to be billed to consumers is worked out in Paisa after
rounding off to the next lower integer in case of fraction less than 0.5 and to the
next higher integer in case of fraction equal to or greater than 0.5.
d) The per unit FPPCA so worked out is charged differentially as per the approved
retail tariff of the consumers. The determination of differential per unit FPPCA is
mentioned below:
• Step 1: Determination of Value of K
The value of K for different consumer category or sub category for the year in
consideration is considered as per the respective Tariff Order.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018• Step 2: Determination of proportionate FPPCA (Paisa/unit) consumer category/sub-
category wise
FPPCA to be billed for the consumers category or sub-category (Paisa/unit) =
4. Duties of the licensees and Designated officer
a) Every distribution licensee shall appoint a designated officer not below the rank of
Executive Engineer with Name, Designation, Telephone No. & Fax and Place of
Posting, who shall compute, certify and post the PPCA calculations, PPCA
chargeable & related data summary on the licensees website and clarify to
consumers query, if any.
b) The Designated Officer shall send certified copy of FPPCA calculations immediately
to Joint Electricity Regulatory Commission."
10.3. Need to review the existing mechanism
JERC has been amongst the first few Electricity Regulatory Commission's in India to introduce the concept of adjustment of variation in the power purchase cost in the end consumer tariffs through Fuel and Power Purchase Cost Adjustment (FPPCA) mechanism in 2012.
The Indian Power Sector is very dynamic and has changed a lot since 2012. Further, there have been changes in the methodology for determination and recovery of generation and transmission tariff, transmission pricing mechanism, fuel mix with emergence of renewable energy etc. Other State Electricity Regulatory Commissions (SERCs) have also introduced the concept of the FPPCA wherein the Fuel and Power Purchase cost variations are passed through to the consumer either monthly, bi-monthly or quarterly. In between, the Commission has also received representation from various consumer groups and the distribution licensees seeking clarity and simplicity in the FPPCA mechanism adopted by the Commission. In light of the above and the experiences gained during these years, the Commission has decided to examine the FPPCA mechanism followed in other States vis-à-vis the FPPCA mechanism adopted by the Commission and identify the best practices.
A detailed examination of the methodology followed across other States for calculation of variations in the Fuel and Power Purchase Cost Adjustment revealed the following observations:
• Every State has a different formula for determination of the FPPCA charges. However the fundamental objective of all of them remains the same i.e. to pass on the incremental cost of power procurement to the consumers.
• FPPCA charges are composed of different elements in different States with power purchase cost from approved and long term sources being the only element common across all States.
• FPPCA charges are mostly determined on the Discom Periphery across all the States.
• Power purchase cost considered as base for calculation of FPPCA charges is determined in the Tariff Order.
• For States, procuring power from own generation plants, the Station Heat Rate and other components such as Auxiliary consumption, losses etc. are considered as base as approved in the Tariff Order for calculating the variations in the power purchase costs.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018The key takeaways with respect to certain parameters of the formula are provided in the table below:
Table 77: Key Takeaways
| S. No. | Parameter | Takeaways |
| 1. | Time Period | • Time period for levy of the FPPCA is quarterly in most of the States except in Chhattisgarh and Bihar where recovery is on bi-monthly and monthly basis respectively. |
| 2. | Approval Process | • Some of the SERC's allow the Discoms to recover FPPCA charges upto a certain limit via automatic route (without approval of the Commission) thereby reducing the administrative burden. However, in most of the States like Maharashtra, Kerala, Madhya Pradesh etc. prior approval from the Commission is required. |
| 3. | Elements included while determining FPPCA charges | • In all the States, power purchase cost from long term approved sources is considered while calculating the FPPCA charges; • Central Transmission charges are considered in the States of Gujarat, Maharashtra, Delhi and Uttar Pradesh; • Adjustments (Under-recovery/Over-recovery) due to previous FPPCA period is considered in the States like Bihar, Karnataka, Kerala and Maharashtra; • Power Purchase cost from short term sale/purchase, bilateral exchange, IEX etc. is considered in the States of Gujarat, Maharashtra and Uttar Pradesh; • In States like Karnataka and Madhya Pradesh, only variable cost of power purchase is considered while calculating the FPPCA charges; • In Uttar Pradesh (UP) any kind of arrears/refunds etc. in the period are also considered. |
| 4. | Elements excluded while determining FPPCA charges | • Short term power procurement cost is excluded while calculating FPPCA in most of the States except Gujarat, Maharashtra and Uttar Pradesh. • In UP, power purchase cost from unapproved plants is excluded. • DSM charges are excluded in most of the States. • In Bihar, the Regulations categorically define exclusion of any kind of penalties due to delayed payment, while calculating FPPCA charges. • In Chhattisgarh power purchase cost from renewable sources is excluded. • In the NCT of Delhi, past arrear/credits are not considered unlike UP where they are considered. |
| 5. | Categories excluded | • Almost all categories are covered under the ambit of the FPPCA charges except in the State of Kerala where the domestic consumers upto a certain consumption limit are not levied FPPCA charges. • In Gujarat State, the FPPCA charges for the Agriculture category are subsidized by the State Government. |
| 6. | T&D losses considered for determination | • In most of the States, the T&D losses approved in the Tariff Order are considered for calculation of gross units; however, in Gujarat and Bihar, the approved or actual losses whichever are lower are considered • In Maharashtra, the actual T&D losses are considered. |
| 7. | Notification via Regulations/Tariff Order | • In most of the States like Delhi, Maharashtra, Madhya Pradesh etc., the FPPCA methodology is defined in the Tariff regulations except in Karnataka and Kerala where individual regulations are notified. |
| 8. | Ceiling within a month (%) for recovery | • In States like Maharashtra, Gujarat, Bihar and Karnataka, the upper ceiling of the FPPCA charges is provided which is applicable to all categories. |
| 9. | Ceiling within a month for a category | • Ceiling of the FPPCA charges in a quarter for categories such as Domestic and Agriculture in Chhattisgarh State. |
| 10. | Recovery Mechanism | • FPPCA charges are recovered from the consumers and are part of their electricity bills • In some States like Gujarat and Madhya Pradesh, a uniform FPPCA charge is recovered depending on the billed units while in States like Maharashtra and UP, the category wise FPPCA charges based on the category ABR is determined |
The existing FPPCA mechanism notified by the Commission is in the form of an amendment in the existing Regulation - Joint Electricity Regulatory Commission for the State of Goa and UT's (Multi-Year Distribution Tariff) (Second Amendment) Regulations, 2016. These Regulations are sub-legislations and making any changes in the Regulation involves legal process which is cumbersome and time consuming. The Commission, therefore, proposes to repeal the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (except Delhi) (Multi-Year Distribution Tariff) (Second Amendment) Regulations, 2016 and going forward provide formula for the FPPCA mechanism in the Tariff Order issued by the Commission.
In the section below, the Commission has discussed the proposed FPPCA formula for inclusion in the Tariff Order for the FY 2018-19.
10.4. New formula
Based on the review of the existing formula and examination of the formulas and the best practices adopted by the various SERC's, the Commission proposes the following mechanism for calculation and passing on of variations in the Fuel and Power Purchase Cost Adjustment (FPPCA) in the end consumer tariff, which shall come into force w.e.f. 1st April 2018 (i.e. Power Purchased by the Licensee from 1st April 2018 onwards). For power purchased by the Licensee for the period from 1st January 2018 till 31st March 2018, the FPPCA will be calculated based on the earlier formula.
1. Periodicity for recovery (Cycle)
The licensee shall compute the fuel and power procurement cost variations on a quarterly basis. The adjustment shall be made in the consumers bills starting after a month following the end of the quarter on the units billed in the months following the quarter.
For example, FPPCA for the quarter April-June shall be done in the month of July and shall be reflected in the consumer bills raised in the months of August, September and October on the units billed for the months of July, August and September respectively.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 20182. Chargeability
FPPCA charges shall be levied on all consumer categories excluding Below Poverty Line (BPL) and Agriculture category consumers on per unit basis on monthly/bi-monthly consumption depending on the billing cycle.
3. Formula
The FPPCA formula shall contain the following three components:
1. Power Purchase Cost adjustments which shall contain the following elements:
• Variation in the Power Purchased from long term/firm sources viz. CGS, IPP's, State, Own generation etc. This may consist of fixed cost, variable costs, arrears, other charges but excluding any kind of penalties.
• Variation in Short term power purchase cost through IEX, Bilateral etc. (shall be allowed upto a certain ceiling rate as may be fixed in the Tariff Order by the Commission).
• Variation on account of Deviation Settlement Mechanism – Shall be allowed, but the incentive/penalty shall be excluded.
2. Transmission cost adjustments which shall contain the following elements:
• Variation on account of Central Transmission Charges including arrears/revisions.
• Variation on account of State Transmission charges including arrears/revisions.
3. Other Charges which shall contain all the other elements not forming part of the above two components for example:
• Any adjustments/reversals due to over recovery of charges
• Any adjustments due to under recovery of charges in case the Commission decides to limit the FPPCA charges in previous quarters to avoid tariff shock or other reasons
• Any other adjustments on account of factors not envisaged at the time of tariff fixation
4. Less any revenue from Additional Surcharge collected from Open Access consumer towards the stranded power purchase cost.
Based on the components as defined above, the new FPPCA formula can be represented as follows:
Where:
• Actual Power purchase cost inclusive of fixed cost, variable costs, arrears, and other charges excluding any kind of penalties incurred in the quarter. This shall include:
o Cost of procurement from sources outside the State,
o Cost of procurement from sources within the State,
o Cost of DSM excluding any penal charges, OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 o Cost of procurement from the Bilateral/exchange etc.
o Less: Revenue from sale of surplus power/DSM
• Actual Transmission cost inclusive of any kind of arrears, other charges etc. and excluding any kind of penalties incurred in the quarter. This shall include:
o Inter-State transmission cost (PGCIL charges),
o Intra-State transmission cost
• Adjustments from the previous FPPCA quarter on account of over/ under recovery and any other incidental costs not accounted for at the time of retail tariff fixation
• Revenue from Additional Surcharge collected from Open Access consumer towards the stranded power purchase cost
• Quantum of power purchased in the quarter from sources outside State/ Union Territory
• Approved Inter-State transmission losses for the year in consideration as provided in the relevant Tariff Order
• Quantum of power purchased in the quarter from sources within State/Union Territory, Bilateral/Exchange and Over-drawal under the DSM
• Actual quantum of sale of surplus power/under-drawal under the DSM in the quarter
• Approved T&D losses for the year in consideration as provided in the relevant Tariff Order
• Actual energy sales for agriculture and BPL category consumers in the quarter
• : Total power purchase cost approved in the Tariff Order for a quarter inclusive of fixed costs, variable costs etc. and containing the following elements:
o Cost of procurement from sources outside the State,
o Cost of procurement from sources within the State,
o Cost of procurement from the Bilateral/exchange etc.
o Less: Revenue from sale of surplus power
• : Total transmission charges approved in the Tariff Order for a quarter consisting of the following elements:
o Inter-State transmission charges (PGCIL charges),
o Intra-State transmission charges OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018
• Quantum of power to be procured from sources outside State/Union
Territory in a quarter as approved in the Tariff Order.
• Approved Inter- State transmission losses for the year in consideration as
provided in the relevant Tariff Order.
• Quantum of power to be procured from sources within the State,
bilateral/exchange in a quarter as approved in the Tariff Order.
• Approved T&D losses for the year in consideration as provided in the
Tariff Order.
• Quantum of sale of surplus power approved in the Tariff Order for a
quarter.
• Sales for agriculture and BPL category consumers for a quarter as
approved in the relevant Tariff Order.
4. Other Terms and conditions
1. For the purpose of the Fuel and Power Purchase Cost Adjustment, the Commission suggests that all the bills admitted and credits, if any, received by the distribution licensee during the period in consideration, irrespective of the period to which they pertain, may be considered.
2. The FPPCA charges determined as per the formula above may be recovered from the consumers of all categories based on their billed units excluding the BPL and the agriculture category consumers.
3. The FPPCA charges for a quarter shall be limited to 10% of the ABR for a consumer category. The distribution licensee shall be allowed to collect the FPPCA without obtaining approval from the Commission. However, the distribution licensee shall be required to submit the FPPCA calculation to the Commission atleast one week before levying the same on the consumers.
4. The per unit FPPCA so worked out is charged differentially as per the approved retail tariff of the consumers. The determination of differential per unit FPPCA is mentioned below:
• Step 1: Determination of Value of K
The value of K for different consumer category or sub-category for the year in consideration is considered as approved in this Tariff Order.
• Step 2: Determination of proportionate FPPCA (Rs/unit) consumer category/sub- category wise OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 5. The Petitioner shall compute the fuel and power procurement cost variations, and adjustments shall be made in the consumer bills based on the FPPCA formula as approved by the Commission in this Order.
For the purpose of calculation, the approved per unit cost of power purchase (Rapproved) shall be taken as Rs 3.76/kWh for the FY 2018-19.
Table 78: Rapproved determined by Commission for FY 2018-19
| Particulars | Amount |
| Total Power Purchase Cost (Rs Cr ), Papp | 1,145.84 |
| Transmission Charges (Rs Cr), Tapp | 183.84 |
| Power Purchase Quantum from CGS Stations at Generator Periphery (NTPC, NPCIL, NEEPCO) (MU), PPOapp | 3,713.55 |
| Approved Weighted Average Inter-State Transmission Loss (%), TLapp | 4.41% |
| Power Purchase Quantum from sources within State/ Open Market (Co-Gen and Open Market) (MU), PPIapp | 446.09 |
| Quantum of Sale of Surplus Power (MU), PSOapp | - |
| Approved Intra-State T&D Loss (%), DLapp | 10.75% |
| Energy Sales for LIG and Agriculture consumer category (MU), Zapp (MU) | 31.04 |
| Rapp (Rs/kWh) | 3.76 |
11. Chapter 11: Directives
Over the years, the Commission has issued various directives to the Petitioner for necessary
action at its end. It has been observed that the Petitioner is not fully complying with many
of the directives issued by the Commission. In order to strengthen the effective monitoring
and ensure timely implementation of all the directives in true spirit, the Commission
hereby directs that the Petitioner shall now submit:
• The detailed action plan for compliance of all the directives within 1 month of the
issuance of this Order.
• The quarterly progress report as per the detailed action plan for all the directives
issued in the subsequent sections within 10 days of the end of each quarter of the
calendar year.
11.1. Directives continued in this Order
While examining the compliance note and supporting documents submitted by the Petitioner in the present Petition, it is observed that some of the directives issued in the previous Tariff Orders have not been fully complied with by the Petitioner.
The Commission is of the view that substantial time has already been given to the utility for compliance with these directions. Thus, the Commission hereby directs the utility to comply with the directions mentioned below in the given timeframe, failing which the Commission OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 shall be constrained to initiate necessary action under Section 142 of the Electricity Act, 2003 read with other provisions of the Act, and Regulations made there under.
11.1.1. Annual Statement of Accounts
| Originally Issued in Tariff Order dated 27th June, 2012 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission appreciates the effort undertaken by the Petitioner for the preparation of audited accounts on commercial principles. However, the Commission is of the view that while the Commission has undertaken the True-up for the FY 2011-12 and FY 2012-13 in this Order, in normal course and as per the provisions of Tariff Regulations, 2009, the True-up upto FY 2015-16 should have been done in this Order. The Commission has taken a serious note of this and directs the Petitioner to undertake necessary actions on priority so as to ensure that all the True-ups of FY 2013-14 to FY 2016-17 (along with audited accounts) are submitted with the Tariff Petition of FY 2018-19. The Commission shall be constrained to take appropriate action against the Petitioner in case of further non-compliance. |
| Petitioner's Response in the Present Tariff Petition The status of Audited reports for the previous years is as follows: Financial statements for FY 2013-14 are completed and audit has been undertaken. • Awaiting for CAG Certificate. Financial statements for FY 2014-15 are completed and submitted to CAG for conducting • Audit. Preparation of Financial Statements for FY 2015-16 and 2016-17, are under process. • |
| Commission's Response The Commission has undertaken the True-up for the FY 2013-14 in this Order, even though in normal course and as per the provisions of Tariff Regulations, 2009 and MYT Regulations, 2014, the True-up upto FY 2016-17 should have been done in this Order. The Commission has taken a serious note of this and directs the Petitioner to undertake necessary action on priority so as to ensure that all the True-ups of FY 2014-15 to FY 2017-18 (along with audited accounts) are filed along with the next Tariff Petition submitted to the Commission. The Commission shall be constrained to take appropriate action against the Petitioner in case of further non-compliance. |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission has noted with serious concern that the Petitioner is yet to submit the Fixed Asset and Depreciation Register. In previous year's submission also, the Petitioner had communicated the following: "GIS mapping of the assets will be completed as the part of RAPDRP Part A by 31st March, 2016". Further, the Petitioner has not given any reason for delay in completion of GIS Mapping. The |
| Commission would like the Petitioner to take note of the fact that such submissions without any justifications are not appreciated by the Commission. The Commission now direct the Petitioner to submit action plan along with timelines for preparation of Fixed Assets and Depreciation Register for previous years within 1 month of issuance of this Order. The Commission will be constrained to take appropriate action in case of further non-compliance by the Petitioner. |
| Petitioner's Response in the Present Tariff Petition The status of FAR for the previous years is as follows: FAR for FY 2013-14 and 2014-15 have been completed. • FAR for FY 2015-16 and FY 2016-17, are under process. • |
| Commission's Response The Commission has noted with serious concern that the Petitioner is yet to submit the Fixed Asset Register. The Petitioner is directed to submit the FAR upto FY 2017-18 along with the next tariff petition. |
11.1.3. Energy Audit Reports
| Originally Issued in Tariff Order dated 27th June, 2012 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission has noted with serious concern that the Petitioner is yet to submit the Energy Audit Reports for previous years. The Commission now direct the Petitioner to submit action plan along with timelines for preparation of Energy Audit Report within 1 month of issuance of this Order. The Commission will be constrained to take appropriate action in case of further non-compliance by the Petitioner. |
| Petitioner's Response in the Present Tariff Petition DT metering is not yet completed and still in progress. Only on completion of the same, the Energy Audit Report will be initiated. |
| Commission's Response The Commission has noted with serious concern that the Petitioner is yet to submit the Energy Audit Reports for previous years. The Commission directs the Petitioner to expedite the process of DT and Feeder metering and complete the Energy Audit of the State on priority. |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission has noted with serious concern that the Petitioner is yet to submit a systematic manpower study report with a specific focus on manpower rationalization. The Commission now direct the Petitioner to submit action plan along with timelines for preparation of a systematic manpower study report with a specific focus on manpower |
| rationalization within 2 months of issuance of this Order. The Commission will be constrained to take appropriate action in case of further non-compliance by the Petitioner. |
| Petitioner's Response in the Present Tariff Petition The report has been furnished by the consultant. However EDG is required to scrutinise further and subsequently will be submitted to State Government for decision. Post decision from State Government, the report will be submitted to the Hon'ble Commission. |
| Commission's Response The Commission has noted with serious concern that the Petitioner is yet to submit a systematic manpower study report with a specific focus on manpower rationalization. The Commission directs the Petitioner to finalise the report prepared by the appointed consultant and submit the same for the decision of the State Govt. |
11.1.5. Interest on Consumer Security Deposit
| Originally Issued in Tariff Order dated 31st March, 2013 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission directs the Petitioner to pay the interest on consumer security deposit in the bills of as per the provisions of JERC Supply Code Regulations, 2009. The Commission observes that while the Petitioner has undertaken some efforts towards compliance of this directive, still substantial payment is yet to be done by the Petitioner. The Commission is of the view that substantial time has already been given to the Petitioner. The Commission now directs the Petitioner to compute the quantum of backlog and ensure payment of balance security deposit pertaining to previous years before 31st August, 2017. No further extension will be entertained by the Commission in this matter and in case of further non-compliance, the Commission will be constrained to take appropriate action under Section 142 of the Electricity Act, 2003. |
| Petitioner's Response in the Present Tariff Petition • As on date an amount of Rs 14.79 Cr was allotted for payment of interest on consumer security deposit, out of which an amount of Rs 8.58 Cr has been credited to consumer account and the balance amount will be credited before the end of the financial year. • Further, for FY 2018-19 an amount of Rs 6.47 Cr has been proposed for allotment. |
| Commission's Response The Commission observes that while the Petitioner has undertaken some efforts towards compliance of this directive, a substantial payment is yet to be credited to the consumers. The Commission is of the view that substantial time has already been given to the Petitioner. The Commission now directs the Petitioner to compute the quantum of backlog and ensure payment of balance interest on security deposit pertaining to previous years before 31st August, 2018. |
11.1.6. Sub Divisions as Strategic Business Units
| Originally Issued in Tariff Order dated 06th April, 2015 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission directs the Petitioner to submit the sub-division wise status report of readiness of all the sub-divisions towards introduction of the system of Cost-Revenue Centre Oriented Sub-Divisions within 2 months of issuance of this Order. |
| Petitioner's Response in the Present Tariff Petition As a pilot project, one of the sub-division under Division VI, Mapusa has been taken for that purpose. |
| Commission's Response The Commission has noted the submission of the Petitioner. The Commission directs the Petitioner to submit the report of this pilot project along with the sub-division wise status report of readiness of all the sub-divisions towards introduction of the system of Cost-Revenue Centre Oriented Sub-Divisions within 1 month of issuance of this Order. |
11.1.7. Installation of Pre Paid Meters
| Originally Issued in Tariff Order dated 06th April, 2015 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission would like to highlight the Petitioner has long history of issues related to billing and collection. The pre-paid meters, though being costly as compared to conventional meters, will be cost effective in longer run. Further, GoI is already focusing on installation of smart meters. Thus, the Commission now directs the Petitioner to finalize and submit a proposal for installation of smart meters for following consumers: 1. All HT and EHT Consumers. 2. LT Industries and Hotel Industries. 3. All Government Connections. 4. All connections whose premises remain locked for 3 or more months in a year. The Petitioner is directed to submit this proposal within 4 months of issuance of this Order failing which the Commission will be constrained to take appropriate action against the Petitioner. |
| Petitioner's Response in the Present Tariff Petition As a pilot project under smart city mission, Government has considered installation of Smart Meters for Panaji and surrounding areas at a cost of Rs 70 Crores. Thereafter as directed, the Smart meters will be taken up for (1) All HT and EHT Consumers. (2) LT Industries and Hotel Industries. (3) All Government connections. (4) All Connections whose premise remain locked for 3 or more months in a year. |
| Commission's Response The Commission directs the Petitioner to expedite the process of installation of prepaid meters and submit a compliance report along with the filing of the next tariff petition. |
11.1.8. Unbundling of Electricity Department
| Originally Issued in Tariff Order dated 06th April, 2015 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission has noted the submission of the Petitioner. The Commission directs the Petitioner to actively pursue the unbundling of the Department with the Government of Goa and submit quarterly progress reports in this regard. |
| Petitioner's Response in the Present Tariff Petition It is requested to the Hon'ble Commission that there is no specific directive for unbundling of EDG from the State Government and therefore the said directive may be dropped. |
| Commission's Response The Commission directs the Petitioner to submit the proposal to the State Govt. by June 30th 2018. Till such time a decision is taken by the State Govt. ring fencing of the transmission functions should be initiated. Further, it is directed that the Petitioner should increase its efforts towards making the State Load Dispatch Center (SLDC) fully operational. |
11.1.9. Renewable Energy Obligation
| Originally Issued in Tariff Order dated 06th April, 2015 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission directs the Petitioner to submit the status of finalization of Solar Policy within 1 month of issuance of this Order. |
| Petitioner's Response in the Present Tariff Petition Solar Policy has been approved by Government of Goa and the same is being put in Public domain. |
| Commission's Response The Commission has noted the submission of the Petitioner. The Solar policy may be utilized for increasing the solar installations in the State. Efforts should be made to purchase physical power instead of REC's. |
11.1.10. Billing and Collection Efficiency
| Originally Issued in Tariff Order dated 06th April, 2015 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission notes with serious concern the state of affairs of operation of the department. The Commission directs the Petitioner to take all necessary actions on priority so as to resolve all the issues pertaining to billing and collection and report the status along with next Tariff Filing. |
| Petitioner's Response in the Present Tariff Petition Presently billing and collection efficiency is above 80%. |
| Commission's Response The Commission notes with serious concern that the billing and collection efficiency in the State is very low. The Commission in the MYT Order had approved the collection efficiency of 100% for FY 2018-19 and AT&C loss level of 10.75%. The Commission directs the Petitioner to take all necessary actions on priority so as to resolve all the issues pertaining to billing and collection and report the status along with next Tariff Filing. |
11.2. New Directives issued in this Order
11.2.1. Creation of SLDC
Currently, the functions of scheduling of power is being performed by the EDG itself. The Commission directs the Petitioner to fully operationalize a separate SLDC which is ring fenced from the EDG. The Petitioner is directed to deploy suitable employees dedicated for the SLDC functions.
11.2.2. kVAh based tariff
The Petitioner in the proceedings of this Tariff Order failed to submit the requisite data such as Power factor, kVAh readings etc. to implement kVAh based energy charges for HT/EHT consumers. The Petitioner is hereby directed to submit the status of technological readiness of these high voltage consumers and the requisite information of incentive/disincentive on account of power factor rebate/penalty, power factor for different categories and kVAh based readings of FY 2017-18 along with the filing of the next tariff petition.
11.3. Directives dropped in this Order
While examining the compliance note and supporting documents submitted by the Petitioner in the present Petition, it has been observed that some of the directives issued in previous Tariff Orders are no longer required.
The Commission is of the view that since these directions have been complied with satisfactorily, these directions are no longer required in the present context and are required to be dropped or replaced with new directions. No further compliance/status is required to be submitted by the Petitioner for the following directives:
11.3.1. Management Information System (MIS) and Database Management System (DBMS)
| Originally Issued in Tariff Order dated 06th April, 2015 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission now directs the Petitioner to submit action plan along with timelines for implementation of MIS and DBMS within 2 months of issuance of this Order. |
| Petitioner's Response in the Present Tariff Petition Management Information System (MIS) and Database Management System DBMS has been implemented under APDRP Part A Project. |
| Commission's Response The Commission observes that the objectives of implementation of MIS and DBMS have been achieved, therefore the Commission decides to drop this directive. |
11.3.2. Street Lights switching 'on' and 'off'
| Originally Issued in Tariff Order dated 06th April, 2015 |
| Commission's Latest Directive in Tariff Order dated 23rd May, 2017 The Commission has noted the submission of the Petitioner and directs it to submit quarterly progress reports to the Commission. |
| Petitioner's Response in the Present Tariff Petition The Centralised Control and Monitoring system is in process of installation and is expected to be completed by end of FY 2017-18. |
| Commission's Response The Commission observes that the Petitioner is submitting quarterly progress reports and is in process of installation of CCMS. The Commission, therefore, in accordance with the Petitioner's submission decides to drop this directive. |
ANNEXURES
Annexure 1: Public Notices published by the Commission
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Annexure 2: Public Notices published by the Petitioner
OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 2 (EXTRAORDINARY No. 2) 18TH APRIL, 2018Annexure 3: List of Stakeholders
The following is the list of the stakeholders who have submitted objections/suggestions:
Table 79: List of Stakeholders
| S. No. | List of Stakeholder |
| 1. | Sh. Owen Braganza |
| 2. | Ms. Nancy Fernandes |
| 3. | Sh. Martin Rodrigues |
| 4. | Sh. Porfiro Fernandes |
| 5. | Ms. Mamta Srivastava |
| 6. | Sh. Prashant K. Anvekar |
| 7. | Dr. Kurade |
| 8. | Sh. Agnelo D'Silva |
| 9. | Ramona Almeida |
| 10. | Lorna Fernandes |
| 11. | Jose M. Miranda |
| 12. | Sh. Mayur Chaudhari |
| 13. | Olga Netto |
| 14. | Nicladina F. D'Mello |
| 15. | George Gravier |
| 16. | Vivian Alheida |
| 17. | Roland Martins |
| 18. | Gerand D'Mello |
| 19. | John Diniz |
| 20. | Porfiro Fernandes |
| 21. | Cipriana Fernandes |
| 22. | Ashish Gaundalhan |
| 23. | Silvestre Niassso |
| 24. | B.L. Biyani |
| 25. | Dishant Parab |
| 26. | Atish Tulaskan |
| 27. | Pratik Parab |
| 28. | Xavier Fernandes |
| 29. | Hector Colaco |
| 30. | Vasu R. Patel |
| 31. | Rajesh Shet |
| 32. | Abhay Keny |
| 33. | S.V. Purohit |
| 34. | P.K. Umadathan |
| 35. | Anthony Fernandes |
| 36. | Lira Matu |
| 37. | Aditya Bidre |
| 38. | Lorna Fernandes |
| 39. | Neet De Soya |
| 40. | Camil Pinto |
| 41. | Josephine Pinto |
| 42. | Prakash Lotlikar |
| 43. | Raghee Billava |
| 44. | Maria Magdalena Almeida |
| 45. | Ashley Vales |
| 46. | Nilesh Panehwadkor |
| 47. | Rolance Coutinho |
| 48. | Ratika Naik |
| 49. | Uttam Gaonkar |
| 50. | Rupesh |
| 51. | Confederation of Indian Industries, Goa |
| 52. | Alloys and Steels |
| 53. | Zuary Foods and Tropical Mushroom |
| 54. | Verna Industries Association |
| 55. | Gram Sabha |
| 56. | Aldona Civic and Consumer Forum |
| 57. | Charao Civic and Consumer Forum |
| 58. | Raia Civic and Consumer Forum |
www.goaprintingpress.gov.in
Published and Printed by the Director, Printing & Stationery, Government Printing Press, Mahatma Gandhi Road, Panaji-Goa 403 001.
Price–Rs. 117.00
PRINTED AT GOVERNMENT PRINTING PRESS, PANAJI-GOA—24/200—4/2018.