Servants of Knowledge
Goa Gazette · Government of Goa

Goa Gazette, No. 2122-39, 23 December 2021

Published 23 December 2021

Type
EOG
Gazette no.
2122-39
Num
1
Series
SI
Identifier
in.goa.egaz.2122-39.SI/2122-39-SI-EOG-1
Languages
English, Portuguese
Published at
Original source ↗

Reg. No. RNP/GOA/32/2021-2023

RNI No. GOAENG/2002/6410

Panaji, 23rd December, 2021 (Pausa 02, 1943) SERIES I No. 39 PUBLISHED BY AUTHORITY

EXTRAORDINARY

GOVERNMENT OF GOA

Department of Environment & Climate Change

__

Notification

31-9-2010-STE-DIR/Part-I/Vol.IV/976

In exercise of the powers conferred by sub- sections (1) and (2) of section 54 of the Water (Prevention and Control of Pollution) Act, 1974 (Central Act 6 of 1974), and in consultation with the Goa State Pollution Control Board, conveyed vide No. 8/25/13-PCB/Vol X/Adm./ 19634/Tech/7864 dated 29-07-2021, the Government of Goa hereby makes the following rules, namely:—

1. Short title and commencement.— (1) These rules may be called the Goa Water (Prevention and Control of Pollution) Rules, 2021.

(2) They shall come into force on the date

of their publication in the Official Gazette.

2. Definitions.— (1) In these rules, unless

the context otherwise requires,—

(a) "Act" means the Water (Prevention and Control of Pollution) Act, 1974 (Central Act 6 of 1974);

(b) "Water pollutant" means any solid, liquid or gaseous substance [(including noise)] present in the atmosphere in such concentration as may be or tend to be injurious to human beings or other living creatures or plants or proper ty or environment;

(c) "Board" means the Goa State Pollution Control Board constituted under section 4 of the Water (Prevention and Control of Pollution) Act, 1974 (Central Act 6 of 1974);

(d) "Chairman" means the Chairman of

the Board;

(e) "Chimney" includes any structure with an opening or outlet from or through which any water pollutant may be emitted.

(f) "Conformity" means fulfillment of a requirement to the Consent conditions or directions issued by the Board from time to time;

(g) "Consequence" means an outcome

of an event affecting objectives;

(h) "Control Equipments" means any apparatus, device, equipment or system to control the quality and manner of emission of any water pollutant, an includes any device used for securing the efficient operation of any industrial plant;

(i) "Correction" means action to

eliminate a detected nonconformity;

(j) "CPCB" means Central Pollution Control Board constituted under section 3 of the Water (Prevention and Control of Pollution) Act, 1974 (Central Act 6 of 1974);

(k) "CTE" means Consent to Establish;

2661 Suggestions are welcomed on e-mail: dir–[email protected] OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(l) "CTO" means Consent to Operate;

(m) "Effluent" includes any liquid, gaseous or solid substance which is discharged from any organization/ premises used for carrying on any activity, Industry, operation or process, or treatment and disposal system including domestic sewage;

(n) "Emission" means any solid or liquid or gaseous substance coming out of any chimney, duct or flue or any other outlet;

(o) "Environment" means the surroundings in which an organization operates, including water, water, land, natural resources, flora, fauna, humans and their interrelationships.

(p) "Environmental Audit" mean an audit conducted by an Empanelled Environmental Auditor of the State Board or officials of the State Board;

(q) "Environmental Audit Committee" (EAC) means an Expert Committee constituted by State Board to assess the Environmental Audit reports submitted by the Environmental Auditors and recommend action;

(r) "Environmental Audit Conclusion" means outcome of an audit, af ter consideration of the objectives and all audit findings;

(s) "Environmental Audit Criteria" means the set of policies, procedures, supporting records or requirements which are used as a reference against which audit evidence is compared;

(t) "Environmental Audit Evidence" means consists records, statements of fact, reports or other information which are relevant to the audit criteria and are verifiable;

(u) "Environmental Audit Findings" means results of the evaluation of the collected audit evidence against audit criteria, indicating conformity or nonconformity and additionally observa- tions and scope for improvement;

(v) "Environmental Audit Plan" means description of the activities and arrangements for an audit;

(w) "Environmental Audit protocol" means the checklist used by Empanelled Auditors of the Board as the guide for conducting the Environmental audit;

(x) "Environmental Audit Scope" means

extent and boundaries of an audit;

(y) "Environmental Audit Team" means an Audit team which shall consist of minimum 3 members with an independent Technical/Scientific Expert, if felt required. The qualifications of the team members should be varied to ensure a wider cover having requisite technical and scientific expertise relevant to the Organizations processes and related activities. The composition of the Audit Team shall be as specified in Schedule II;

(z) "Environmental Auditee" means the Organization/Industry and its work force (consisting of employees and contractual or related workers), represented by an authorized full time employee of the organization being audited, no lesser than a representative of senior management;

(aa) "Environmental Auditor" shall mean Goa State Pollution Control Board (GSPCB) empanelled Environmental Auditor from Engineering colleges/Scientific Institutions/ Colleges, Universities, ISO Cer tified Agencies, Officials of the State Board or any other expert the Board deems fit for conducting an Environmental Audit;

(ab) "Environmental Audit Report" shall mean the Environmental Audit report prepared by the Empanelled Environmental Auditor of the State Board or the Officials of the State Board;

(ac) "Event" means an occurrence or change of a particular set of circumstances with or without consequences and can sometimes be referred to as an "incident" or "accident". An event without consequences can also be referred to as a2662 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 "near miss", "incident", "near hit" or "close call";

(ad) "Form" means form appended to

these Rules;

(ae) "Government" means the

Government of Goa;

(af) "Likelihood" means chance of

something happening;

(ag) "Member Secretary " means the

Member Secretary of the Board;

(ah) "Major Non conformity" means Non operation/inefficient operation of the water Pollution Control Equipments/Measures and/or non-fulfillment/violation of the standard of emission prescribed in the consent or direct violation of specific statutory environmental obligation by the Occupier or act of omission of the occupier or negligence on his part whether by any accident or otherwise;

(ai) Minor Non conformity means non- fulfillment of a requirement of the Consent condition which includes non submission of reports or maintenance of records as specified in the Consent Conditions and which is not defined as major Non conformity;

(aj) "Occupier", in relation to any organization, operation or process, premises, means the authorised person who has documented control over the affwaters of the factory or the premises, and includes, in relation to any substance, the persons in possession of the substance;

(ak) "Schedule" means a Schedule

appended to these rules;

(al) "section" means a section of the Act;

(am) "Sewage" means effluent from any sewerage system or sewage disposal works and includes sullage from open drains;

(an) "State water Laboratory" means a laboratory as referred in sub section (a) of section 52 of the Act;

(ao) "State Board Laboratory" means a laboratory as referred to in sub-section (2) of section 17 of the Act;

(ap) "Total estimated investment" means the total estimated value of the proposed industry, operation, process, treatment/ disposal system or an extension/addition thereto, and includes the value of land, building, plant and machinery including the value of leasehold land, building and premises and value of hired plant, machinery and equipment;

(aq) "Total Investment" means the total value of the completed industry, operation, process, treatment/disposal system or an extension/addition thereto, and includes the value of land, building, plant and machinery including the value of leasehold land, building, and premises and value of hired plant, machinery and equipment;

(ar) "Year" means the financial year

commencing on the first day of April.

(2) Words and expressions used and not defined in these rules but defined in the Act shall have the meanings respectively assigned to them in the Act.

3. Travelling allowance, daily allowance and other allowances for members.— (1) The member of the Board shall be entitled to payment of travelling allowance as admissible to the Grade I Officer of the Government from the Board's fund for the journey performed by him for the purposes of the Board.

(2) Every member of the Board shall be entitled to payment of sitting fee at such rate as may be decided by the Board from time to time for each day of such sitting, in addition to travelling allowance.

(3) A member of the Board shall not be entitled to any travelling allowance for journey performed by him on first occasion to take charge of post and also after relinquishment of post.

(4) The Member-Secretary of the Board or any other Officer authorized by the Board shall decide about the sitting fees and travelling allowances of the members.

(5) A non-official member of the Board if he happens to be a member of the Legislative Assembly of Goa, he shall not be eligible for2663 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 payment of travelling allowance if he has claimed travelling allowance, for the same journey and period for which such allowance has been claimed in his bills for attending the meetings of the Legislative Assembly or any Committee thereof.

4. Time and place of meetings of the Board and procedure to be followed at such meetings.— (1) The meetings of the Board shall ordinarily be held at the head quarter of the Board on such dates as may be fixed by the Chairman

(2) The Chairman shall at his discretion or, upon written request of not less than five members of the Board or upon a direction of the Government, call a special meeting of the Board.

(3) Five clear days' notice for an ordinary meeting and two clear days' notice for a special meeting specifying the time and the place at which such meeting is to be held and the business to be transacted there at, shall be given by the Member Secretary to the members of the Board.

(4) Notice of a meeting of the Board may be given to the members of the Board by delivering the same by messenger or sending it by registered post to their last known place of residence or business or by email or in such other manner as the Chairman may, in the circumstances of the case, deem fit.

(5) No member of the Board shall be entitled to bring forward for the consideration of the meeting any matter of which he has not given ten clear days' notice to the Member- Secretary, unless the Chairman, in his discretion, permits him to do so.

(6) The Board may adjourn the meeting from day-to-day or to any particular day, and no fresh notice shall be required for such adjourned meeting.

(7) No proceeding shall be invalidated merely on the ground that the provision in this rule relating to the notice is not strictly complied with.

5. Presiding Officer.— Every meeting of the Board shall be presided over by the Chairman and, in his absence, by an authority/officer as approved and notified by the Government.

6. All questions to be decided by majority.— (1) All questions at a meeting shall be decided by a majority of votes of the members present, and voting shall be by raising of hands in favour of the proposal.

(2) In case of equality of votes, the presiding officer shall have a second or casting vote.

7. Quorum.— (1) Five members shall form

the quorum for any meeting.

(2) If at a time fixed for any meeting or during the course of any meeting a quorum is not present, the presiding officer shall adjourn the meeting and if a quorum is not present on the expiration of fifteen minutes from such adjournment, the presiding officer shall adjourn the meeting to such hours on the following or on some other future date as he may fix.

(3) No quorum shall be necessary for the

adjourned meeting.

(4) No matter which had not been on the agenda of the original meeting shall be discussed at such adjourned meeting.

8. Minutes.— (1) Record shall be kept of the names of members who attended the meeting and of the proceedings at the meeting to be maintained by the Member Secretary and uploaded on the official website of the Board.

(2) The minutes of the previous meeting shall be read at the beginning of the every succeeding meeting, and shall be confirmed and signed by the Presiding Officer at such meeting.

(3) The proceedings shall be open for inspection to any member at the office of the Board during office hours.

9. Maintaining order at meeting.— The Presiding Officer shall maintain order at meeting.

10. Business to be transacted at meeting.— Except with the permission of the Presiding2664 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 Officer, no business which is not entered in the agenda or of which notice has not been given by a member under sub-rule (5) of rule 4, shall be transacted at any meeting.

11. Order of business.— (1) At any meeting the business to be transacted shall be in the order in which it is entered in the agenda.

(2) Either at the beginning of the meeting or after conclusion of the debate on a motion during the meeting the Presiding Officer or a member may suggest a change in the order of business as entered in the agenda and if the majority of the members present agree, such a change shall take place.

12. Procedure for transaction of business of committees constituted by the Board.— (1) The time and place of the meetings of the Committees constituted by the Board under sub-section (1) of section 9 of the Act shall be as specified by the Chairman and the Member Secretary.

(2) The quorum for a meeting of such committees shall be half of the total number of members of the committee.

(3) The committee so appointed by the Board shall take decisions and convey the same to the Board.

(4) The committee may device its own procedure for transaction of its business at its meeting.

13. Fees and allowances to be paid to members of the committee.— A member of a committee shall be entitled to such travelling allowance and sitting fee as admissible to a member of the Board, and, if he is a Government Servant, he shall be entitled only to travelling allowance and dearness allowance at the rates, admissible under the relevant rules of the Government under which he is serving.

14. Persons to be temporarily associated with the Board.— The person temporarily associated with the Board shall be paid travelling allowance and sitting fee if he is a non-official, at the rates specified in rule 3 and if he is a Government Servant as specified in rule 13.

15. Powers and duties to be exercised by the Chairman and the Member-Secretary of the Board and appointment of Officers and employees.— (1) Subject to the policy approved by the Board, the general management of the of waters and business of the Board shall be with the Chairman who shall have power to do all things necessary or desirable for the management of affairs of the Board in carrying out its objectives.

(2) The Chairman may,—

(i) with prior approval of the Government undertake tours within India for carrying out the functions of the Board.

(ii) With the prior approval of the Government, visit any foreign country for carrying out the functions of the Board.

(3) The Chairman shall have power to accord administrative and financial sanction to all estimates without any financial limit in the allocation made for such purposes in the budget of the Board.

(4) In the matter of acceptance of tenders, the Chairman shall have full powers without any monetary limit.

16. Powers and duties of the Member Secretary.— The Member Secretary shall be subordinate to the Chairman and shall, subject to the control of the Chairman, exercise the following powers, namely:—

(i) the Member Secretary may undertake tours within India for the performance of duties entrusted to him by the Board provided that he shall keep the Chairman informed of his tours and obtain the previous permission from the Board for his tours outside the State of Goa.

(ii) the Member Secretary shall be in charge of all the confidential papers of the Board and shall be responsible for preserving them.

(iii) the Member Secretary shall produce such papers whenever so directed by the Chairman or by the Board.

(iv) the Member Secretary shall make available to any member of the Board, for his perusal, any record of the Board.

2665 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(v) the Member Secretar y shall be entitled to issue any direction to any officer or employee of the Board, and call at any time, any file, paper and document, from any section/department of the Board, for checking of accounts, vouchers, bills and other records and stores pertaining to the Board or regional offices there under.

(vi) the Member Secretary may withhold any payment, provided that as soon as may be after such withholding of payment the matter shall be placed before the Board for its approval.

(vii) the Member Secretary shall make all arrangements for holding meetings of the Board and meetings of the committees constituted by the Board.

(viii) all orders, instructions, directions, notices, communications, consents, authorizations or registrations to be issued by the Board shall be under the signature of the Member Secretary or of any other Officer authorized in this behalf by the Chairman or the Board.

(ix) the Member Secretary shall be authorized to sanction or pass and make all payments against estimates sanctioned, within the allocations made for such purposes in the budget approved by the Board.

(x) the Member Secretary shall write and maintain confidential repor ts of all subordinate officers of the Board and shall get them countersigned by the Chairman.

(xi) (a) the Member Secretary shall sanction the annual increments of the officers of the Board subordinate to him.

(b) the annual increments of officers which the Member Secretary is not competent to sanction shall be sanctioned by the Chairman.

(xii) the Member Secretary shall have full power for according technical sanction to all estimates.

(xiii) the Member Secretar y shall exercise such other powers and perform such other functions as may be delegated to him from time to time either by the Board or by the Chairman.

(xiv) the Member Secretary shall have power to execute contract, deed, instrument and assurance of property and in particular (a) all service agreements (b) security bonds (c) con veyance, lease of immovable property and, (d) assurances required by law or otherwise.

(xv) The Member Secretary shall have power to engage legal advisors, Advocates, Attorneys on the terms and conditions to be approved by the Board.

(xvi) The Member Secretary or any other Officer authorized by the Chairman or the Board shall have power to make and give receipts in respect of the claims of and demands on the Board.

(xvii) The Member Secretary shall have power to purchase materials and equipments for execution of construction works up to a limit of the allotments made from time to time.

(xviii) The Member Secretary shall have power to sanction installation of telephones/ broadband/internet connections, etc. in the office of the Board.

17. Appointment of Consulting Engineer.— (1) For the purpose of assisting the Board in the performance of its functions, it may appoint a Consultant for a specified period not exceeding one year:

Provided that the Board may, with the prior approval of the Government extend the period of such appointment from time to time:

Provided further that if at the time of the initial appointment, the Board had reason to believe that the services of the Consultant would be required for a period of more than one year, the Board shall not make the appointment without the prior approval of the Government.

(2) The Board may pay such emoluments or fees to the Consulting Engineer depending on the nature of work and his qualifications and experience:

2666 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

Provided that the Board shall not appoint any person as Consulting Engineer without the prior approval of the Government, if the emoluments or fees payable to him exceeds Rs. 1,00,000/ (Rupees One Lakh only) per month.

18. Power to terminate appointment.— Notwithstanding the appointment of a Consulting Engineer for a specified period, the Board shall have the right to terminate the services of the Consulting Engineer before the expiry of the specified period, if in the opinion of the Board, he is not discharging his duties to the satisfaction of the Board or if such a course of action is necessary in the public interest.

19. Tours by Consulting Engineer.— The Consulting Engineer may undertake tours within the State with prior approval of the Chairman for the performance of the duties entrusted to him by the Board and in respect of such tours, he shall be entitled for travelling and daily allowances as admissible to Grade I Officer of the Government.

20. Consulting Engineer not to disclose information.— The Consulting Engineer shall not disclose any information either given by the Board or obtained during the performance of the duties assigned to him either from the Board or otherwise, to any other person without the written permission of the Board.

21. Duties and functions of the Consulting Engineer.— The Consulting Engineer shall discharge such duties and perform such functions as are assigned to him, by the Board and he shall be duty bound to advise the Board on all technical matters referred to him by the Board.

22. Form of notice.— The notice referred in clause (a) of sub-section (3) of section 21 shall be made in Form I hereto.

23. Form of Report of the Board Analyst.— The report referred in sub-section (1) of section 22 of the Act shall be in Form II hereto and submitted in triplicate.

24. Form for submission of sample to State water Laboratory and report of the Government Analyst.— The submission of the sample of water or effluent shall be sent for analysis under sub-section (1) section 21 of the Act to the State Water Laboratory by a letter in Form III hereto. The report referred in sub-section (1) of section 22 of the Act shall be in Form IV hereto submitted in triplicate.

25. Application for consent of the Board.— (1) The application referred in sub-section (2) of section 25 shall be made online on the website of the Board at www.goapcb.gov.in as applicable and it shall be accompanied by,—

(a) a certificate from the Chartered Accountant in Form V hereto which shall include value of leasehold land, building and premises and value of hired plant, machinery and equipment,

(b) land allotment/earmarking letter or

lease/sale deed;

(c) flow chart and detailed production

process;

(d) copy of Project Report for projects

costing 5 crores and above;

(e) site Plan (not required for units to be

set up in Industrial Estates);

(f) layout plan showing the locations of Manufacturing equipment, water supply/ drainage lines, position of Chimneys, effluent/sewage treatment plant and final discharge point, sludge solid waste disposal points and septic tank/soak pits;

(g) Detailed material balance, water balance for Industries categorised under Red and Orange and large scale Industries under green category;

(h) for large enterprises covered under the Schedule of Environment Impact Assessment Notification, 2006 as amended from time to time, copy of the Environment Impact Assessment Study Report;

(i) copy of the prior Environment Clearance issued by the competent Authority as applicable for projects listed in the Environment Impact Assessment2667 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 Notification, 2006 as amended from time to time.

(j) site plan showing surrounding residential area, public places, water streams, etc, of the proposed factory/ operation/process/mine/quarry site within a radius of five kilometers with Waste water treatment and disposal systems clearly indicating where waste water is proposed to be disposed off after treatment (for medium and large scale enterprises).

(k) schematic sketch of the proposed Effluent/sewage treatment system/plant (ETP/STP) and or septic tank or soakpits duly signed by Authorised person along with detailed design calculation as applicable.

(l) original Authorisation letter of the person to whom authorisation is made to sign this application form except individual proprietary concern.

(m) any other document/clarification as

requisitioned by the Board.

(n) fees as specified in the Table 1(A), 1(B) and 1(C) of Schedule I appended hereto as applicable, to the respective category of industry.

(2) An application without requisite fee

shall not be entertained by the Board.

(3) The fees shall be paid by a bank draft or NEFT/RTGS or NET Banking in favour of the Board.

(4) The Consent to Establish issued by the Board shall be valid for a period of five years from the date of issue.

(5) The Categorization of Industries/ establishments as Red, Orange, Green category shall be as specified in Table 3 annexed herewith.

(6) When any industry, operation, process, treatment/disposal system or/and extension/ addition thereto is established, an application for consent to operate/renewal of Consent to Operate under sub-section (2) of section 25 of the Act shall be made online on the website of the Board www.goapcb.gov.in as applicable to the respective category of industry, operation or process at least two months prior to the scheduled date of commencing operation, and shall be accompanied by,—

(a) a certificate from the Chartered Accountant as specified in Form V which shall also include value of leasehold land, building and premises and value of hired plant, machinery and equipment;

(b) copy of the previous Consent issued

by the Board.

(c) stack analysis report/analysis report of treated effluent/sewage wherever applicable.

(d) any changes/modifications carried out in the Industry/operation or process after obtaining previous Consent;

(e) in case of Renewal of Orange and Green Category Industry, application for Auto Renewal to be accompanied by an Affidavit as specified at Annexure 'B' in SCHEDULE I hereto;

(f) Fees as specified in the Table 2(A), 2(B) or 2(C) of Schedule I as applicable to the respective category of industry;

(g) an application without requisite fees

shall not be entertained by the Board;

(h) the fees referred herein shall be paid by a bank draft or NEFT/RTGS or NET Banking in favour of the Goa State Pollution Control Board;

(i) The validity of consent to operate and renewal of consent to operate shall normally be five years for Red category, ten years for orange category and fifteen years for green categor y industr y, operation or process;

(j) An application for renewal of consent to operate submitted upon expiry of the2668 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 validity period shall also be accompanied by late fees equivalent to 50% of the fees payable for renewal.

26. Manner of enquiry in respect of application for consent.— (1) On receipt of an application for consent under section 21 of the Act, the Board may depute any of its officers, accompanied by as many assistants as may be necessary, to visit the premises of the applicant, to which such application relates for the purpose of verif ying the correctness or otherwise of the particulars furnished in the application or for obtaining such further particulars or information as the Board may consider necessary as specified under sections 23, 24 and 25 of the Act. Such officer may, for that purpose, inspect any place where water emissions or water pollutant are discharged by the applicant or water pollution control equipments and measures and may require the applicant to furnish to him any plan, specification and other data relating to such water pollution control equipments and measures, systems or any part thereof, he considers necessary.

(2) Such officer shall before visiting any premises of the applicant for the purpose of inspection under sub-rule (1), give notice to the applicant of his intention to do so in Form VI hereto. The applicant shall furnish to such officer all facilities that such officer may legitimately require for the purpose.

(3) An officer of the Board may, before or after carrying out an inspection under sub- rule (1), require the applicant to furnish to him, orally or in writing such additional information or clarification, or to produce before him such documents, as he may consider necessary and may, for that purpose, summon the applicant or his authorized agent to the office of the Board.

(4) The Board shall conduct water quality monitoring of such units under sub-section (1) of section 21 of the Act and shall levy such fees as specified by the Board from time to time.

(5) The Board shall conduct environmental audit under sub-section (3) of section 21 of the Act through an Environmental Auditor or Engineering/Scientific Institutions or Officials of the Board upon submission of Environmental Statement by the industry/ Organization and shall follow such procedure as specified in SCHEDULE II hereto.

(6) The Board shall constitute an Environmental Audit Committee comprising of such members as specified in SCHEDULE II hereto.

(7) The tenure of the Environmental Audit

committee shall be for a period of 5 year;

(8) For the purpose of carrying out Environmental Audit the Board shall levy fees

as per actual expenses incurred by the Board

for conducting the Environmental Audit plus

25 percent administrative charges.

(9) The Board shall Empanel Environment

Auditors by following such procedures as

specified in SCHEDULE II hereto;

(10) The Institutions/Agencies/Pro- fessionals/Individuals eligible for Empanel-

ment as Environment Auditor with the Board

shall be as specified in SCHEDULE II hereto;

(11) The Environment Audit Committee

shall review the Environment Audit Report

submitted by the Environment Auditors and

recommend such actions as specified in

SCHEDULE II hereto;

(12) The Environment Audit Committee

shall meet at least once in 3 months;

(13) The Empanelled Auditor shall conduct

an Environment Audit as per the procedure

and submit a Repor t as specified in

SCHEDULE II hereto;

(14) The fee to be paid to Empanelled

Environment Auditor shall be as specified in

SCHEDULE II hereto.

2669 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

27. Form of budget.— (1) Before the last day of the preceding financial year, the budget in respect of the ensuing year showing the estimated receipts and expenditure of the Board shall be prepared under section 38 of the Act in Forms VII hereto;

(2) The estimated receipts and expenditure shall be accompanied by the revised budget estimates for the current year;

(3) The budget shall, as far as may be, based on the account heads specified in SCHEDULE III hereto.

28. Submission of budget estimates to the Board.— (1) The budget estimates shall be placed by the Member Secretary before the Board by the 5th October each year for approval.

(2) After approval of the budget estimates by the Board, four copies of the final budget proposals incorporating therein such modifications as have been decided upon by the Board shall be submitted to the Government by the 15th October each year.

29. Estimates of establishment expenditure and fixed recurring charges.— The estimates of expenditure on fixed establishment as well as fixed monthly recurring charges on account of rent, allowances, etc. shall provide for the gross amount without deductions of any kind.

30. Re-appropriations and emergent expenditure.— No expenditure which is not covered by a provision in the sanctioned budget estimates or which is likely to be in excess over the amount provided under any head, shall be incurred without the approval of the Board and by the Board without provision being made for re-appropriation from some other head, under which savings are firmly established and available.

31. Power to incur expenditure.— The Member Secretary shall have power to incur expenditure against allotments made in the budget estimates sanctioned by the Board and against sanctioned estimates out of the funds of the Board subject to observance of the general financial rules for the purposes of procedure.

32. Operation of fund of the Board.—The fund of the Board shall be operated by the Member Secretary of the Board and in his absence by any officer of the Board duly authorized by the Board in that behalf. The Board shall create and maintain a Corpus Fund.

33. Form of annual report.— The annual report referred in sub-section (2) of section 39 of the Act shall be in Form VIII hereto.

34. Form of annual statement of accounts of the Board.— The annual statement of accounts of the Board referred in sub-section (1) of section 40 shall be in Forms IX, X XI, XII and XIII hereto.

35. Audit of the annual statement of Account.— The annual statement of account of the Board shall be audited by an Auditor appointed by the Government for the purpose in consultation with the Office of the Comptroller and Auditor General in Goa.

36. Directions of the Government.— The Board shall comply with the directions issued by Government from time to time.

37. Repeal and savings.— (1) The Goa Water (Prevention and Control of Pollution) Rules, 1989 are hereby repealed.

(2) Notwithstanding such repeal any action taken or order issued under the provisions of the said repealed Rules prior to the commencement of these Rules shall, in so far as it is not inconsistent with the provisions of these Rules, be deemed to have been taken or issued under the provisions of these Rules.

By order and in the name of the Governor

of Goa.

Dasharath M. Redkar, Director (Envt.)/

ex officio Joint Secretary.

Panaji, 17th December, 2021.

2670 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM I

THE GOA STATE POLLUTION CONTROL BOARD

Notice of intention to have sample analysed

(See rule 22)

To,

Take notice that it is intended to have analyzed the sample of water emissions/flue gas emissions/ ambient monitoring/emissions which is being taken today the ... day of ... 20... from (†) ...

Name and designation of the person who takes

the sample.

(t) Here specify the stream, well, plant, or place

from where the sample is taken.

——— FORM II

Report by the Board Analyst

[See rule 23]

Report No. ...

Dated the ... 20...

I hereby certify that I, (*) ... Board Analyst duly appointed under sub-section (2) of section 53 of the Water (Prevention and Control of Pollution) Act, 1974 (Act 6 of 1974), received on the (†) ... day of ... 20... (‡) ... a sample of ... for analysis. The sample was in a condition fit for analysis reported below:-

I further certify that I have analysed the aforementioned sample on (§) ... and declare the result of the analysis to be as follows-

($) ...

The condition of the seals fastening and

container on receipt was as follows:-

Signed this ... day of ... 20...

Address ...

(Signed)

Board Analyst

To

………..

………….

(*) Here write the full name of the Board Analyst.

(†) Here write the date of receipt of the sample.

(‡) Here write the name of the Board or person or body of persons or Officer from whom the sample was received.

(§) Here write the date of analysis.

($) Here write the details of the analysis and refer to the method of analysis. If the space is not adequate the details may be given on a separate sheet of paper.

———

FORM III

Form of letter for submission of samples to the State Water Laboratory

[See rule 24]

To,

The Government Analyst,

State Water Laboratory

Sir,

I am submitting sample No./Nos…. of water

emissions taken from M/s……......................................

on………........................... according to the provisions

of section 54 of the Water (Prevention and Control

of Pollution) Act, 1974 (Central Act 6 of 1974).

Sample No. Point of Parameters to be

collection analyzed

…………… …………… …………….......

…………… …………… …………….......

…………… …………… …………….......

Yours faithfully,

(signature of the officer taking sample) Designation:-

Copy forwarded to the Member Secretary, Goa

State Pollution Control Board,

............................................................................

(Name and signature of the officer taking sample)]2671 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 FORM IV

Report by the Government Analyst

[See rule 24]

Report No. ...

Dated the ... 20…

I hereby certify that I, (*) .........................................

Government Analyst duly appointed under sub- section (2) of section 53 of the Water (Prevention

and Control of Pollution) Act, 1974 (Act 6 of 1974)

received on the (†) ... day of ... 20... from (‡) ... a

sample of ... for analysis. The sample was in a

condition fit for analysis reported below:–

I further certify that I have analysed the

aforementioned sample on (§) ..........................................

and declare the result of the analysis to be as

follows:—

($) ....

....

....

Signed this ... day of ... 20...

Address ....

(Signature)

Government Analyst

To

………..

…………

(*) Here write the full name of the Government

Analyst.

(†) Here write the date of receipt of the sample.

(‡) Here write the name of the Board or person or body of persons or Officer from whom the sample

was received.

(§) Here write the date of analysis.

($) Here write the details of the analysis and refer to the method of analysis. If the space is not adequate the details may be given on a separate sheet of paper.

FORM V (Form of the certificate of the Chartered Accountant without appreciation and depreciation)

[See rule 25(1)(a)]

I, Shri. ___________________________________

Son/daughter of _________________________, aged

______________________years, Indian National,

resident of ______________________________ ,

hereby solemnly declare an oath as follows.

1. I say that I am the Proprietor/Director

Authorized Signatory of M/s. ___________________

located at ________________________, Goa.

2. I say that the Gross Fixed Asset Value/Gross

Estimated Value (in case of NOC) of our unit is as

follows (including the value of lease/hold land,

building and premises and value of hired plant,

machinery and equipment)

a. Land_________________________

b. Building_________________________

c. Plant & Machinery_______________

d. Other fixed assets_________________

Total _________________________

(Rupees _______________________________)

3. I say that I am filing this Certificate for the

limited purpose of producing it before the Board for obtaining Consent.

Solemnly affirmed at _________________

Dated _____________________

Deponent Name & Signature

Note: Kindly note that application form should be invariably submitted by only authorized person on behalf of the unit"2672 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 FORM VI

THE GOA STATE POLLUTION CONTROL BOARD

NOTICE OF INSPECTION

[See rule 26(2)]

Chairman

Member Secretary ..................................................

Shri .............................................................................

No. ....................................................

Dated..................................................

..........................................................................................

......................................................................................

To,

Take Notice that for the purpose of enquiry under section 21 the following officers of the State Board namely:—

i. Shri ……………………………………

ii. Shri ……………………………………

iii. Shri ……………………………………

and the persons authorized by the Board to assist them shall inspect-

Any systems of your Industrial Plant.

Any other parts thereof or pertaining thereto under management/control of date (a) …………………………………………between ………………………….hours when all facilities requested by them for such inspection should be made available to them on the site. Take Notice that refusal or denial to above stated demand made under the functions of the State Board shall amount to obstruction punishable under section 37(1) of the Act.

By order of the Board Member Secretary

Copy to:

1. ………………………..

2. ………………………..

3. ………………………..

2673 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM VII

THE GOA STATE POLLUTION CONTROL BOARD

(cid:39)(cid:72)(cid:87)(cid:68)(cid:76)(cid:79)(cid:72)(cid:71)(cid:3)(cid:37)(cid:88)(cid:71)(cid:74)(cid:72)(cid:87)(cid:3)(cid:40)(cid:86)(cid:87)(cid:76)(cid:80)(cid:68)(cid:87)(cid:72)(cid:86)(cid:3)(cid:73)(cid:82)(cid:85)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:92)(cid:72)(cid:68)(cid:85)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)

[See rule 27(1)]

ADMINISTRATION

(Expenditure)

Head of Account Actuals for the past three years Sanctioned Estimate for the current year Actuals for last six months i.e. year current year Actuals for last six months of the Revised Estimate for the current year Budget Estimate for the next year Variations between column 5 and 8 Variations between column 8 and 9 Explanation for columns 10-11
1 2 3 4 5 6 7 8 9 10 11 12

Accounts Officer/Accountant

FORM VIII

THE GOA STATE POLLUTION CONTROL BOARD

(cid:36)(cid:81)(cid:81)(cid:88)(cid:68)(cid:79)(cid:3)(cid:53)(cid:72)(cid:83)(cid:82)(cid:85)(cid:87)(cid:3)(cid:73)(cid:82)(cid:85)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:41)(cid:76)(cid:81)(cid:68)(cid:81)(cid:70)(cid:76)(cid:68)(cid:79)(cid:3)(cid:92)(cid:72)(cid:68)(cid:85)(cid:3)(cid:36)(cid:83)(cid:85)(cid:76)(cid:79)(cid:3)(cid:21)(cid:19)(cid:171)(cid:17)(cid:3)(cid:55)(cid:82)(cid:3)(cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)

(See rule 33)

1. Introductory. 2. Constitution of the Board including changes therein. 3. Constitution of Committees by Board and Meetings of the Committees constituted by it. 4. Meetings of the Board. 5. Activities of the Board including the various functions performed under Section 1 of the Act. 6. Prosecutions launched and convictions secured. 7. Finance and Accounts of the Board. 8. Visits to the Board by Experts, important persons etc. 9. Any other important matter dealt with by the Board.

2674

Page 1 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM IX

THE GOA STATE POLLUTION CONTROL BOARD

(cid:53)(cid:72)(cid:70)(cid:72)(cid:76)(cid:83)(cid:87)(cid:86)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:83)(cid:68)(cid:92)(cid:80)(cid:72)(cid:81)(cid:87)(cid:86)(cid:3)(cid:73)(cid:82)(cid:85)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:92)(cid:72)(cid:68)(cid:85)(cid:3)(cid:72)(cid:81)(cid:71)(cid:72)(cid:71)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)

(See rule 34)

Previous year (1) Receipts (2) Previous year (3) Payments (4)
Opening Balance -------- 1.Capital expenditure
Grants received: (i) Works ""
(a) From Government "" (ii) Fixed Assets ""
(b) From other agencies "" (iii) Other Assets: ""
ii. Fees "" (a) Laboratory equipments ""
iii. Fines and Forfeitures "" (b) Vehicles ""
iv. Interest on Investment "" (c) Furniture & Fixtures ""
v. Miscellaneous receipts "" (d) Scientific Instruments and Office appliances ""
vi.Miscellaneous Advances "" (e) Tools and Plant ""
vii. Deposits "" (23) Revenue Expenditure
A. Administrative:
(i) Salaries ""
(ii) Travelling Allowance :
a) Chairman ""
b) Members ""
c) Others ""
(iii) Leave salary and pension contributions ""
(iv) Office expenditure ""
B. (i) Board Laboratory ""
(i) Charges to be paid to State Government Analyst Laboratory ""
C. Running and Maintenance of Vehicles ""
D. Maintenance and Repwaters:
(i) Buildings ""
(ii) Works ""
(iii) Furniture and Fixture ""
(iv) Scientific Instruments and office appliances ""
(v) Tools and plants
E. Fees to consultants and Specialist ""
F. Law Charges ""
G. Miscellaneous ""
H. Fees for Audit
3. Purchases
4. Miscellaneous
5. Advances
6. Deposits
Closing Balance
Total Total
Accounts Officer/Accountant Member Secretary Chairman
2675 Page 2 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM X

THE GOA STATE POLLUTION CONTROL BOARD

Expenditure on works as on 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)(cid:17)

(Item I (cid:178) Assets of the Balance Sheet)

(See rule 34)

Upto 31st March " 'XULQJWKH\HDU"" Upto 31st 0DUFK""
Sr. No. Name of the work Direct expenditure Charges Overhead Total expenditure Direct expenditure Charges Overhead Total expenditure Direct expenditure Charges Overhead Total expenditure
T otal -----------------------------------------------------------------------------------
Accounts Officer/Accountant Member Secretary Chairman

FORM XI

THE GOA STATE POLLUTION CONTROL BOARD

ANNUAL STATEMENT OF ACCOUNTS Fixed Assets as on works as on 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)(cid:17)

(Item 2 (cid:178) Assets of the Balance Sheet)

Other Assets as on 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)

(Item 3 (cid:178) Assets of the Balance Sheet) (See rule 34)

Sr. No. Particulars of Assets Balance as on 31st March " Additions during the year Total Depreciati on during the year Sales or write off during the year Balance as on 31st March " Cumulative depreciation as on 31st March "
Accounts Officer/Accountant Member Secretary Chairman
2676 Page 3 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM XII

THE GOA STATE POLLUTION CONTROL BOARD

ANNUAL STATEMENT OF ACCOUNT

Income and expenditure accounts for year ended 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)(cid:171)(cid:17)

(See rule 34)

Expenditure Income
Previous year Details Total of sub-head Total of Major head Previous year Details Total of sub-head Total of Major head
(1) (2) (3) (4) (5) (6) (7) (8)
Rs.
To By
Revenue expenditure I. Grants received
(A) Administrative (a) From Government
(i) Salaries (b) From other agencies
(ii) Travelling allowances Total
(iii) Leave salary and pension contributions Less:
(iv) %RDUG·VFRQWULEXWLRQWRWKH staff provident fund. Amount utilized for Capital expenditure. Net grant available for Revenue expenditure.
(v) Contingent expenditure
(B) Running expenses of laboratories: (i) Main laboratory (ii) Payments to be made to the State Government Analyst laboratory II Fees III Service rental charges IV Fines and forfeitures V Interest on investments
(C) Running and maintenance of vehicles VI Miscellaneous receipts
(D) Maintenance and Repwaters (i) Building and Land (ii) Drainage Works (iii) Furniture and Fixtures (iv) Scientific Instruments and office appliances (v) Tools and Plant VII Excess of expenditure over income
(E) Fees to consultants and specialists
2677

Page 4 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
(F) Law Charges
(G) Depreciation : (i) Buildings (ii) Laboratory equipment (iii) Vehicles (iv) Furniture and Fixtures (v) Scientific instruments and office appliances (vi) Tools and Plants
(H) Miscellaneous (i) Write off losses (as per details in the statement attached). (ii) Other Miscellaneous expenditure.
(I) Fees for Audit
(J) Excess of Income over expenditure
TOTAL

Accounts Officer/Accountant Member Secretary

FORM XIII

THE GOA STATE POLLUTION CONTROL BOARD

ANNUAL STATEMENT OF ACCOUNTS Balance sheet as at 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:17)(cid:17) (See rule 34)

Capital and Liabilities Property and Assets
Previous year Details Total of sub-head Total of Major head Previous year Details Total of sub-head Total of Major head
(1) (2) (3) (4) (5) (6) (7) (8)
(A) Capital Fund (i) Grants received from Government for Capital Expenditure (a) Amount utilized upto 31st March " ( ii) Grant from other agencies for Capital expenditure (a) Amount utilized upto 31st March " 1. Works--- (as per Form XI) 2. Fixed Assets (As per Form XII) (a) Value of land provided by Govt. (at cost) (b) Buildings³ Balance as per last Balance Sheets Additions during the year ----
(1) (2) (3) (4) (5) (6) (7) (8)
(b) Unutilized balance to 31st 0DUFK" (iii) Value of land provided by Govt. (Per contra)
(B) Capital Receipts Total ----
(c) (i) Deposits received for works from outside bodies Deposits Less Expenditure --- (ii) Other deposit 3. Other Assets-- (As per Form XII) (a) Laboratory Equipment as per last balance sheet additions during the year Total Less depreciation during the year Total -----
-----
-----
-----
(D) Amounts due--- (i) Purchases (ii) Others (b) Vehicles as per last balance sheet Addition during the year -----
Total -----
Less Depreciation during the year -----
Total -----
(E) Excess of income over expenditure : (i) Up to 31st March " (ii) Add for the year (iii) Deduct --- Excess of expendi ture over income (c) Furniture and fixtures as per last Balance Sheet Additions during the year
Total -----
Less Depreciation during the year -----
Total -----
2678 Page 5 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2679

Page 6 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
(1) (2) (3) (4) (5) (6) (7) (8)
(d) Scientific Instruments and Office Appliances --- As per last Balance Sheet Additions during the year Total - ----
- ----
- ----
(e) Tools and Plants ------ As per last Balance Sheet Additions during the year Total Less Depreciation during the year Total - ----
- ----
- ----
- ----
4. Sundry Debtors (i) Amounts due from out site bodies for expenditure incurred----- Expenditure Less Amount received ( ii) Other sundry Debtors
5. Advances------- (a) Miscellaneous Advances (b) Other amount recoverable Cash----- (c) Notice/Short Term Deposits (d) Cash at Bank (e) Cash at Hand (f) Cash in transit - ----
Total Total -----
Accounts Officer/Account ant Member Secretary Chairman
2680

Page 7 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

SCHEDULE I

[See Rule 25]

I An Application for CONSENT TO ESTABLISH, -

(i) A Green Category Industry shall be accompanied by Fee as specified in Table 1(A) below;

(ii) An Orange Category Industry shall be accompanied by Fee as specified in Table 1(B) below;

(iii) A Red Category Industry shall be accompanied by Fee as specified in Table 1(C) below.

II An application for CONSENT TO OPERATE;-

(i) RED Category Industry (Large, Medium and Small scale) shall be accompanied by Fees as specified in Table 2 (A) below.

(ii) ORANGE Category Industry (Large, Medium and Small scale) shall be accompanied by Fees as specified in Table 2(B) below.

(iii) GREEN Category Industry (Large, Medium and Small scale) shall be accompanied by Fee as

Table 1
TOTAL ESTIMATED INVESTMENT (TEI) (Rs. in Lakhs) 1 FEE FOR CONSENT TO ESTABLISH (In Rupees)
Fee (5years) Fee (per year)
350 70
1 - up to 2 700 140
2 - up to 3 1000 200
3 - up to 4 1350 270
4 - up to 5 1700 340
5 - up to 6 2000 400
6 - up to 7 2350 470
7 - up to 8 2700 540
8 - up to 9 3000 600
9 - up to 10 3350 670
10 - up to 15 4000 800
15 - up to 20 4700 940
20 - up to 25 5350 1070
25 - up to 35 6700 1340
35 - up to 45 8000 1600
45 - up to 55 9350 1870
55 - up to 65 10700 2140
65 - up to 75 12000 2400
75 - up to 100 13350 2670
100 - up to 500 17350 3470
500 - up to 1000 21350 4270
1000 ² up to 2000 25350 5070
2000 ² up to 3000 33700 6740
3000 ² up to 4000 42000 8400
4000 ² up to 5000 50350 10070
5000 ² up to 10000 75350 15070
10000 ² up to 20000 100350 20070

Note: Also 2% increase in the above fees for every subsequent financial year.

2681 Page 8 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
Table 2 (A)
Renewal/Consent to operate Red category (L) Red Category (M) Per year Red Category (S)
1 500 500 200
1-up to 2 1000 1000 400
2- up to 3 1500 1500 600
3 - up to 4 2000 2000 800
4 - up to 5 2500 2500 1000
5 - up to 6 3000 3000 1200
6 - up to 7 3500 3500 1400
7 - up to 8 4000 4000 1600
8 - up to 9 4500 4500 1800
9 - up to 10 5000 5000 2000
10 - up to 15 6000 6000 2400
15 - up to 20 7000 7000 2800
20 - up to 25 8000 8000 3200
25 - up to 35 9500 9500 3800
35 - up to 45 11000 11000 4400
45 - up to 55 12500 12500 5000
55 - up to 65 14000 14000 5600
65 - up to 75 15500 15500 6200
75 - up to 100 17000 17000 6800
100 - up to 500 22000 22000 8800
500 - up to 1000 27000 27000 10800
1000 ² up to 2000 37000 37000 14800
2000 ² up to 3000 47000 47000 18800
3000 ² up to 4000 57000 57000 22800
4000 ² up to 5000 67000 67000 26800
5000 ² up to 10000 97000 97000 38800
10000 ² up to 20000 127000 127000 50800

*Note: An application for renewal of Consent submitted after expiry of the validity shall accompany with penalty of 50% of the Consent fees in addition to the prescribed consent fees. Also 2% increase in the above fees for every subsequent financial year.

Table 2 (B)
Renewal/Consent to operate Orange category (L) Orange category (M) Orange category (S)
Per year
1 350 350 150
1-up to 2 700 700 300
2- up to 3 1000 1000 450
3 - up to 4 1350 1350 600
4 - up to 5 1700 1700 750
5 - up to 6 2000 2000 900
6 - up to 7 2350 2350 1000
7 - up to 8 2700 2700 1200
8 - up to 9 3000 3000 1300
9 - up to 10 3350 3350 1450
10 - up to 15 4000 4000 1750
15 - up to 20 4700 4700 2000
2682

Page 9 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
20 - up to 25 5350 5350 2300
25 - up to 35 6350 6350 2800
35 - up to 45 7350 7350 3150
45 - up to 55 8350 8350 3600
55 - up to 65 9350 9350 4000
65 - up to 75 10350 10350 4450
75 - up to 100 11350 11350 4900
100 - up to 500 14700 14700 14700
500 - up to 1000 18000 18000 7750
1000 ² up to 2000 24700 24700 10600
2000 ² up to 3000 31350 31350 13450
3000 ² up to 4000 38000 38000 16300
4000 ² up to 5000 44700 44700 19150
5000 ² up to 10000 64700 64700 27750
10000 ² up to 20000 84700 84700 36300

*NOTE: An application for renewal of Consent submitted after expiry of the validity shall accompany with penalty of 50% of the Consent fees in addition to the prescribed consent fees. Also 2% increase in the above fees for every subsequent financial year.

Table 2 (C)
Renewal/Consent to operate Green category (L) Green category (M) Green category (S)
Per year
1 200 200 100
1 - up to 2 400 400 200
2 - up to 3 600 600 300
3 - up to 4 800 800 400
4 - up to 5 1000 1000 500
5 - up to 6 1200 1200 600
6 - up to 7 1400 1400 700
7 - up to 8 1600 1600 800
8 - up to 9 1800 1800 900
9 - up to 10 2000 2000 1000
10 - up to 15 2400 2400 1200
15 - up to 20 2800 2800 1400
20 - up to 25 3200 3200 1600
25 - up to 35 3800 3800 1900
35 - up to 45 4400 4400 2200
45 - up to 55 5000 5000 2500
55 - up to 65 5600 5600 2800
65 - up to 75 6200 6200 3100
75 - up to 100 6800 6800 3400
100 - up to 500 8800 8800 4400
500 - up to 1000 10800 10800 5400
1000 ² up to 2000 14800 14800 7400
2000 ² up to 3000 18800 18800 9400
3000 ² up to 4000 22800 22800 11400
4000 ² up to 5000 26800 26800 13400
5000 ² up to 10000 38800 38800 19400
10000 ² up to 20000 50800 50800 25400
2683 Page 10 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(cid:36)(cid:49)(cid:49)(cid:40)(cid:59)(cid:56)(cid:53)(cid:40)(cid:3)(cid:182)(cid:36)(cid:183)

Table 3

(See rule 25)

Categorization of Industries

RED CATEGORY
Sr. No. Category
1 Airports and Commercial Air Strips with overall waste water generation > 100KLD
2 Aluminium Smelter
3 Asbestos and asbestos based industries
4 Automobile Manufacturing (integrated facilities)
5 Basic chemicals and electro chemicals and its derivatives including manufacturing o f acid
6 %XLOGLQJDQGFRQVWUXFWLRQSURMHFWVKDYLQJZDVWHZDWHUJHQHUDWLRQ•./'
7 Cement
8 Chlor Alkali
9 Chlorates, per-chlorates & peroxides
10 Chlorine, fluorine, bromine, iodine and their compounds
11 Coke making , liquefaction, coal tar distillation or fuel gas making
12 Common treatment and disposal facilities (CETP, TSDF,CBMWTF, effluent conveyance project, incinerator, MSW sanitary landfill site)
13 CBG plants based on Municipal Solid Waste (MSW) WWG is more than 100KLD
14 CBG plants based on process waste (industrial/process liquid effluent & solid waste like press mud, organic sludge, molasses etc. WWG is more than 100KLD
15 Copper Smelter
16 DG Set of capacity > 5 MVA
17 Distillery (molasses/grain/yeast based)
18 Dyes and Dye- Intermediates
19 Fertilizer (basic) (excluding formulation)
20 Fibre glass production and processing (excluding moulding)
21 Fire crackers manufacturing and bulk storage facilities
22 Health Care establishments (as defined in Bio-Medical Management Waste Rules, 2016 as amended from time to time) with overall waste water generation >100KLD
23 Hotel having overall wastewater generation @100KLD and more
24 Industrial carbon including electrodes and graphite blocks, activated carbon, carbon black
25 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time- Items namely - Spent catalyst containing nickel, cadmium, Zinc, copper, arsenic, vanadium and cobalt,
2684

Page 11 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
26 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time - Items namely - Dismantlers Recycling Plants -Components of waste electrical and electronic assembles comprising accumulators and other batteries included on list A, mercury-switches, activated glass cullets from cathode-ray tubes and other activated glass and PCB-capacitors, or any other component contaminated with Schedule 2 constituents (e.g. cadmium, mercury, lead, polychlorinat ed biphenyl) to an extent that they exhibit hazard characteristics indicated in part C of this Schedule.
27 Industries engaged in recycling/reprocessing/ recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time - Items namely - Integrated Recycling Plants -- Components of waste electrical and electronic assembles comprising accumulators and other batteries included on list A, mercury- switches, activated glass cullets from cathode-ray tubes and other activated glass and PCB-capacitors, or any other component contaminated with Schedule 2 constituents (e.g. cadmium, mercury, lead, polychlorinated biphenyl) to an extent that they exhibit hazard characteristics indicated in part C of this Schedule.
28 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time - Items namely - Lead acid battery plates and other lead scrap/ashes/residues not covered under Batteries (Manageme nt and Handling) Rules, 2001. [* Battery scrap, namely: Lead battery plates covered by ISRI, Code word "Rails" Battery lugs covered by ISRI, Code word "Rakes". Scrap drained/dry while intact, lead batteries covered by ISRI, Code word "rains".
29 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time - Items namely-Spent cleared metal catalyst containing copper, Spent cleared metal catalyst containing zinc,
30 Industry having liquid waste water generation of 100KLD or more including i ndustrial and domestic waste water
31 Industry or process involving metal surface treatment or process such as pickling/ electroplating/paint stripping/heat treatment using cyanide bath/phosphating or finishing and anodizing/enamellings/galvanizing
32 Iron & Steel (involving processing from ore/integrated steel plants) and or Sponge Iron units
33 Isolated storage of hazardous chemicals (as per schedule of manufacturing, stora ge of hazardous chemicals rules,1989 as amended)
34 Lead acid battery manufacturing(excluding assembling and charging of lead-acid battery in micro scale)
35 Manufacturing of explosives, detonators, fuses including management and handling activities
36 Manufacturing of glue and gelatin
37 Manufacturing of lubricating oils, grease and petroleum based products
38 Manufacturing of paints varnishes, pigments and intermediate (excluding blending/mixing)
39 Milk processes and dairy products (integrated project)
40 Mining and ore beneficiation
41 Nuclear power plant
42 Oil and gas extraction including CBM (offshore & on-shore extraction through drilling wells)
43 Oil Refinery (mineral Oil or Petro Refineries)
44 Organic Chemicals manufacturing
45 Pesticides (technical) (excluding formulation)
46 Petrochemicals Manufacturing (including processing of Emulsions of oil and water )
47 Pharmaceuticals
48 Phosphate rock processing plant
49 Phosphorous and its compounds
50 Photographic film and its chemicals
51 Ports and harbour, jetties and dredging operations
52 Power generation plant [except Wind and Solar renewable power plants of all capacities and Mini Hydel power plant of capacity <25MW]
53 Processes involving chlorinated hydrocarbons
54 Pulp & Paper (Large-Agro + wood), Small Pulp & Paper (agro based-wheat straw/rice husk)
55 Pulp & Paper (waste paper based units with bleaching process to manufacture writing & printing paper)
56 Pulp & Paper (waste paper based without bleaching process to manufacture Kraft Paper)
57 Railway locomotive work shop/Integrated road transport workshop/Authorized service centers
58 Railway Stations (Wastewater generDWLRQ•./'
59 Ship Breaking Industries
60 Slaughter house (as per notification S.O.270(E)dated 26.03.2001)and meat processing industries, bone mill, processing of animal horn, hoofs and other body parts
61 Sugar ( excluding Khandsari)
62 Synthetic fibers including rayon , tyre cord, polyester filament yarn
63 Tanneries
64 Thermal Power Plants
65 7\UHDQGWXEHVPDQXIDFWXULQJXQLW•./'ZDVWHZDWHUJHQHUDWLRQ
66 Yarn/Textile processing involving any effluent/emission generating processes includin g bleaching, dyeing, printing and colouring
67 ORANGE CATEGORY Zinc Smelter
Sr. No. Category
1 Airport and Commercial air strips with overall waste water generation <100KLD
2 Almirah, Grill Manufacturing (Dry Mechanical Process)
3 Aluminium & copper extraction from scrap using oil fired furnace (dry process only)
2685 Page 12 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2686

Page 13 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
4 Automobile servicing, repairing and painting (excluding only fuel dispensing)
5 Automobile servicing, repairing and painting (excluding only fuel dispensing)
6 Ayurvedic and homeopathic medicine
7 Bakery and confectionery units (With wood fired ovens /furnaces) and electric/gas ovens > 1T/day
8 Brickfields (excluding fly ash brick manufacturing using lime process)
9 Building and construction projects having built-up area more than 20000sq.mt and waste ZDWHUJHQHUDWLRQ•./'
10 Cashew nut processing
11 Ceramics and Refractories
12 Chanachur and ladoo from puffed and beaten rice (muri and shira) using husk fired oven
13 Coal washeries
14 Coated electrode manufacturing
15 Coffee seed processing
16 Compact disc computer floppy and cassette manufacturing/Reel manufacturing
17 Compressed/Refined Bio-gas production from Biodegradable waste
18 Compressed Biogas (CBG)/Bio-CNG plants CBG plants based on Municipal Solid Waste (MSW) WWG is less than 100KLD
19 CBG plants based on process waste (industrial/process liquid effluent & solid waste like press mud, organic sludge, molasses etc. WWG is less than 100KLD
20 CBG plants based on crop residue (paddy straw/wheat straw/corn sweet sorghum/napier grass etc)
21 CBG plants based on animal waste (dairy farms, poultry farms and other animal) WWG is more than 100KLD
22 Construction and Demolition (C & D) watse processing plants
23 Cotton spinning and weaving ( medium and large scale)
24 Dairy and dairy products (small scale)
25 Dairy Farm having 15 animals and above where milching animals (cows/buffaloes) are housed to produce milk for distribution and supply to milk processing plants
26 DG set of capacity>1MVA but<5MVA
27 Dismantling of rolling stocks (wagons/coaches)
28 Dry cell battery (excluding manufacturing of electrodes) and assembling & charging of acid lead battery on micro scale
29 Dry coal processing, mineral processing, industries involving ore sintering, pelletisating, grinding & pulverization
30 Fermentation industry including manufacture of yeast, beer, distillation of alcohol (Extra Neutral Alcohol)
31 Ferrous and Non- ferrous metal extraction involving different furnaces through melting, refining, re-processing, casting and alloy-making
32 Fertilizer (granulation/formulation/blending only)
33 Fish feed, poultry feed and cattle feed
34 Fish processing and packing (excluding chilling of fishes)
35 Flakes from rejected PET bottle
36 Foam manufacturing
37 Food and food processing including fruits and vegetable processing
38 Forging of ferrous and non- ferrous metals (using oil and gas fired furnaces)
39 Formulation/pelletization of camphor tablets, naphthalene balls from camphor/naphthalene powders.
40 Gaushalas where weak, sick, injured, handicapped and abandoned homeless cattle/cows are housed for rehabilitation is 100KLD and more.
41 Glass ceramics, earthen potteries and tile manufacturing using oil and gas fired kilns, coating on glasses using cerium fluorides and magnesium fluoride etc.
42 Gold Assaying & Hallmarking Centres
43 Gravure printing, digital printing on flex, vinyl
44 Health Care establishments (as defined in Bio-Medical Management Waste Rules, 2016 as amended from time to time) with overall waste water generation >100KLD
45 Heat treatment using oil fired furnace ( without cyaniding)
46 Hot mix plants
47 Hotels (< 3 star) or hotels having > 20 rooms and less than 100 rooms
48 Hotels (<3 star) or hotels having > 20 rooms and less than 100 rooms
49 Ice cream
50 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Brass Dross, Copper Dross, Copper Oxide Mill Scale, Copper Reverts, Cake & Residues, Waste Copper and copper alloys in dispersible form, Slags from copper processing for further processing or re fining, Insulated Copper Wire, Scrap/copper with PVC sheathing including ISRI-code material namely "Druid", Jelly filled Copper cables, Zinc Dross-Hot dip Galvanizers SLAB, Zinc Dross- Bottom Dross, Zinc ash/Skimming arising from galvanizing and die casting operations, Zinc ash/Skimming/other zinc bearing wastes arising from smelting and refining, Zinc ash and residues including zinc alloy residues in dispersible from,
51 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Paint and ink Sludge/residues
52 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Used Oil-As per specifications prescribed from time to time.
53 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Waste Oil ³As per specifications prescribed from time to time.
54 Industry or processes involving foundry operations
55 Jute processing without dyeing
56 Lime manufacturing (using lime kiln)
57 Liquid floor cleaner, black phenyl, liquid soap, glycerol mono-stearate manufacturing
58 Manufacturing of glass
59 Manufacturing of iodized salt from crude/raw salt
60 Manufacturing of mirror from sheet glass
61 Manufacturing of mosquito repellent coil
62 Manufacturing of silica gel
63 Manufacturing of Starch/Sago
64 Manufacturing of tooth powder, toothpaste, talcum powder and other cosmetic items
65 Mechanized laundrt using oil fired boiler
66 Mechanized laundry using oil fired boiler
67 Modular wooden furniture from particle board, MDF
68 New highway construction project
69 New highway construction project
70 Non-alcoholic beverages (soft drink) & bottling of alcohol/non alcoholic products
71 Paint blending and mixing (Ball mill)
72 Paints and varnishes (mixing and blending)
73 Parboiled Rice Mills
74 Pharmaceutical formulation and for R & D purpose (For sustained release/extended release of drugs only and not for commercial purpose)
75 Ply-board manufacturing( including Veneer and laminate) with oil fired boiler/thermic fluid heater (without resin plant)
76 Potable alcohol (IMFL) by blending, bottling of alcohol products
77 Powder Coating Compound manufacturing units
78 Printing ink manufacturing
79 Printing or etching of glass sheet using hydrofluoric acid
80 Printing press
81 Producer gas plant using conventional up drift coal gasification ( linked to rolling mills glass and ceramic industry refectories for dedicated fuel supply)
82 5DLOZD\6WDWLRQV :DVWHZDWHUJHQHUDWLRQ•./'EXW./'
83 Reprocessing of waste plastic including PVC
84 Rolling mill (oil or coal fired) and cold rolling mill
85 Scrapping Centres (for End of Life of Vehicles and other scraps such as plant and machineries, structural material, railway coaches and wagons etc.) a. Collection, De-Pollution, Dismantling Centres
86 Scrapping Centres (for End of Life of Vehicles and other scraps such as plant and machineries, structural material, railway coaches and wagons etc.) a. Collection, De-Pollution, Dismantling Centres and Shredding Centres
87 Scrapping Centres (for End of Life of Vehicles and other scraps such a s plant and machineries, structural material, railway coaches and wagons etc.) a. Shredding Centres (can include white goods "fother scraps also) Note-Recyclingldisnicntling of white goods are covered under E -Waste (Management & Handling Rules, 2016. end have already been categorised in CPCS document-Classification of industrial Sector- (Feb., 2016)
88 Silk screen printing, sari printing by wooden blocks
89 Spray painting, paint baking, paint shipping
90 Steel and steel products using various furnaces like blast furnace/open hearth furnace/induction furnace/arc furnace/submerged arc furnace/basic oxygen furnace/hot rolling reheated furnace
91 Stone crushers
93 Stone Quarries
94 Surgical and medical products including prophylactics and latex
95 Synthetic detergents and soaps (excluding formulation)
96 Synthetic resins
97 Synthetic rubber excluding molding
98 Tephlon based products
99 Thermocol manufacturing (with boiler)
100 Thermometer manufacturing
101 Tobacco products including cigarettes and tobacco/opium processes
102 Transformer repairing/ manufacturing ( dry process only)
103 Tyres and tubes vulcanization/ hot retreating
104 Vegetable oil manufacturing including solvent extraction and refinery/hydrogenated oils
105 GREEN CATEGORY Wire drawing and wire netting
Sr. No. Category
1 Aluminium utensils from aluminium circles by pressing only (dry mechanical operation)
2 Assembly of antenna
3 Ayurvedic and homeopathic medicines (without boiler)
4 Bakery/confectionery/sweets products (with production capacity <1tpd (with gas or electrical oven)
5 Bi-axially oriented PP film along with metalizing operations
6 Biomass briquettes (sun drying) without using toxic hazardous wastes
7 Blending of melamine resins & different powder, additives by physical mixing
8 Brass and bell metal utensils manufacturing from circles(dry mechanical operation without re-rolling facility)
9 Building and construction projects having built-up area less than 20000sq.mt and waste ZDWHUJHQHUDWLRQ”./'
10 Bus body building excluding painting
11 Candy
12 Cardboard or paper gated box and paper products (excluding paper or pulp manufacturing and without using boilers)
13 Carpentry & wooden furniture manufacturing (excluding saw mill) with the help of electrical (motorized) machines such as electrical wood planner, steel saw cutting circular blade, etc.
14 Catering Service other then on tiffin basis and self help groups.
15 Cement products (without using asbestos/boiler/steam curing) like pipe ,pillar, jafri, well ring, block/ tiles etc. (should be done in closed covered shed to control fugitive emissions)
16 Ceramic colour manufacturing by mixing & blending only (not using boiler and wa stewater recycling process)
17 Chilling plant and ice making without using ammonia
18 Chilling plant, cold storage and ice making
2687 Page 14 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2688 Page 15 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2689 Page 16 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2690

Page 17 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
19 CO2 recovery
20 Coke briquetting (sun drying)
21 Compressed/Refined Bio-Gas Production from Bio-degradable Wastes. No waste water discharge from digester and also feed slurry to digester having Volatile Organic Fraction more than 75%.
22 CBG plants based on crop residue (paddy straw/wheat straw/corn sweet sorghum/n apier grass etc) WWG is less than 100KLD
23 CBG plants based on animal waste (dairy farms, poultry farms and other animal waste) WWG is less than 100KLD
24 Cotton spinning and weaving (small scale)
25 Cutting, sizing and polishing of marble stone
26 Dal Mills
27 Decoration of ceramic cups and plates by electric furnace
28 Diesel generator sets (15KVA to 1MVA)
29 Digital printing on PVC clothes
30 Distilled water (without boiler) with electricity as source of heat
31 Electrical and electronic item assembling with painting activity
32 Emery powder (fine dust of sand) manufacturing
33 Facility of handling, storage and transportation of food grains in bulk
34 Facility of handling, storage and transportation of food grains in bulk)
36 Flour mills (dry process)
37 Flyash export, transport & disposal facilities
38 Gaushalas where weak, sick, injured, handicapped and abandoned homeless cattle/cows are housed for rehabilitation is less than 100KLD.
39 Glass , ceramic, earthen potteries, tile and tile manufacturing using electrical kiln or not involving fossil fuel kiln
40 Glue from starch (physical mixing) with gas/electrically operated oven/boiler.
41 Gold and silver smithy (purification with acid smelting operation and sulphuric acid polishing operation) (using less or equal to 1 litre of sulphuric acid/nitric acid per month)
42 Heat treatment with any of the new technology like ultrasound probe, induction hardening , ionization beam, gas carburizing etc.
43 Hotels (up to 20 rooms and without boilers) and overall waste water generation < 100KLD
44 Hotels (upto 20 rooms and without boiler)
45 Insulation and other coated papers (excluding paper or pipe manufacturing)
46 Leather foot wear and leather products (excluding tanning and hide processing except cottage scale)
47 Lubricating oil, greases or petroleum based products (only blending at normal temperature)
48 Manufacture of sanitary pads
49 Manufacturing of optical lenses (using electrical furnace)
50 Manufacturing of pasted veneers using gas fired boiler or thermic fluid heater and by sun drying
52 Marriage Halls
2691

Page 18 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
53 Mineral stack yard/Railway sidings
55 Mineralized water
56 Oil and gas transportation pipeline
57 Oil mill Ghani and extraction (no hydrogenation/refining)
58 Packing materials manufacturing from non asbestos fibre, vegetable fibre yarn
59 Papad and Pickels manufacturing
60 Phenyl/toilet cleaner formulation and bottling
61 Polythene and plastic processed products manufacturing (virgin plastic)
62 Poultry, Hatchery and Piggery
63 Power looms (without dye and bleaching)
64 Puffed rice (muri) (using gas or electrical heating system)
65 Pulverization of bamboo and scrap wood
66 Railway Stations (Wastewater generation<10KLD)
67 Ready mix cement concrete
68 Reprocessing of waste cotton
69 Rice mill (Rice hullers only)
70 Rolling mill (gas fired) and cold rolling mill
71 Rubber goods industry (with gas operated baby boiler)
72 Saw mills
73 Seasoning of wood in steam heated chamber
75 Soap manufacturing (hand made without steam boiling/boiler)
76 Spice grinding (20 HP motor)
77 Steel furniture without spray painting
78 Steeping and processing of grains
79 Surface treatment using water spray rinsing, degreasing, heating in ovens, electrostatic powder coating and curing using oven
80 Synthetic detergent formulation
81 Tamarind powder manufacturing
82 Tea processing (with boiler)
83 WHITE CATEGORY Tyres and tube retreating (without boilers)
Sr. No. Category
1 Assembly of air coolers/conditioners, repairing and servicing
2 Assembly of bicycles, baby carriages and other small non motorizing vehicles
3 Automobile fuel outlets (only dispensing)
4 Bailing (hydraulic press) of waste papers
5 Bio fertilizer and bio-pesticides without using inorganic chemicals
6 Biscuits trays etc from rolled PVC sheet (using automatic vacuum forming machines)
7 Blending and packing of tea
2692

Page 19 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
8 Block making of printing without foundry (excluding wooden block making)
9 Catering serving food on tiffin basis, self help groups.
10 Cement Godown
11 Chalk making from plaster of Paris (only casting without boilers etc. ( sun drying/electrical oven)
12 Compressed oxygen gas from crude liquid oxygen (without use of any solvents and b y maintaining pressure & temperature only for separation of other gases)
13 CBG plants (irrespective of the type of feed) producing Fermented Organic Manure (FOM) & Liquid Fermented Organic Manure (LFOM) as by-products
14 Household bio-digesters/gobar-gas (cow-dung) plants based on biodegradable wastes etc.
15 Cotton and woolen hosiers making (Dry process only without any dying/washing operation)
16 Cycle/motor track
17 Dairy Farm having less than 15 animals where milching animals (cows/buffaloes) are housed to produce milk for distribution and supply to milk processing plants
18 Diesel pump repairing and servicing (complete mechanical dry process)
19 Domestic bio-digestors based on cow-dung or household biodegardable wastes (such as gobar gas plants)
20 Electric lamp (bulb) and CFL manufacturing by assembling only
21 Electrical and electronic item assembling (completely dry process)
22 Engineering and fabrication units (dry process without any heat treatment/metal surface finishing operations/painting)
23 Fabrication carrying out metal primer application/hand painting activity
24 Flavoured betel nuts production/grinding (completely dry mechanical operations)
25 Fly ash bricks/block manufacturing
26 Fountain pen manufacturing by assembling only
27 Glass bottles and vilas making from glass tubes
28 Glass putty and sealant (by mixing with machine only)
29 Ground nut decorticating
30 Handloom/carpet weaving (without dying and bleaching operation)
31 Leather cutting and stitching (more than 10 machine and using motor)
32 Manufacturing of coir items from coconut husks
33 Manufacturing of metal caps containers etc
34 Manufacturing of shoe brush and wire brush
35 Medical oxygen
36 Organic and inorganic nutrients (by physical mixing)
37 Organic manure (manual mixing)
38 Packing of powdered milk
39 Paper pins and u clips
40 Repairing of electric motors and generators (dry mechanical process)
41 Rope (plastic and cotton)
42 Scientific and mathematical instrument manufacturing
2693

Page 20 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
43 Sewage tankers
44 Solar module non conventional energy apparatus manufacturing unit
45 Solar power generation through solar photovoltaic cell, wind power and mini hydel power (less than 25 MW)
46 Surgical and medical products assembling only (not involving effluent / emission generating processes)
47 Stand-alone Massage Parlours, Beauty Parlour, Hair Cutting Saloon and SPAs
48 Tea stall
49 Used Cooking Oil (UCO) collection centres

Note: Any industry/industrial activity, process or trades which do not fall under any of the above mentioned categories, the decision with regards to their categorization/classification, will be taken by the Board, from time to time when such need arises, either suo motto or on the specific request by the Industrial unit. Industrial unit concerned may apply to the Goa State Pollution Control Board in this respect for necessary action.

ACCOMPANIMENTS:

The following documents should invariably be attached alongwith the application as follows: A. Consent to Establish/Consent to Operate

1. Land Allotment/earmarking letter or lease/Sale deed/Form I & XIV.

2. Flow Chart and detailed production process.

3. A copy of Project Report for projects costing Five crores and above.

4. Site plan (not required for units to be set up in Industrial Estates.)

5. Layout plan showing the location of manufacturing equipments, water supply/drainage lines, position of chimneys, effluent treatment plant and final discha rge Point, Sludge solid waste disposal points and septic tanks/soak pits.

6. For industries/activities listed in Schedule I of the Environmental Impact Assessment (EIA) Notification 2006 copy of the EIA report/Form/Report submitted for obtaining Environmenta l Clearance and other survey, if required will have to be furnished in the prescribed time limit.

7. Photocopy of the prior Environmental Clearance (EC) issued by the Competent Authority, if applicable, for project listed in the Environment Impact Assessment (EIA) Notification, 2006, as amended from time to time.

8. Site plan showing surrounding Residential area, public places, water stream, etc., of the factory site within a radius of 5kms with waste water treatment and disposal systems clearly indicating where waste (cid:178) water is proposed to be disposed off (for medium and large scale enterprises).

9. Schematic sketch of the proposed effluent/sewage treatment system/plant (ETP/STP) and/or septic tanks/soak pit, duly signed by authorized person, along with detailed des ign calculation.

10. Certificate from Chartered Accountant certifying the Total Estimated Investment (T.E.I). (refer sample specimen below). In case of leased/hired premises/plant/machinery/ /equipment a certificate from a Registered Valuer towards capital cost is to be submitted without appreciation and depreciation.

11. Original authorization letter of the person to whom authorization is made to sign this application form except individual proprietary concern.

12. Any other documents/clarification as requisition by the Goa State Pollution Control Board.

2694 Page 21 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

B. Renewal of Consent to Operate

1. Certificate from Chartered Accountant certifying the Total Estimated Investment (T.E.I). (refer sample specimen below). In case of leased/hired premises/plant/machinery/ /equipment a certificate from a Registered Valuer towards capital cost is to be submitted without appreciation and depreciation.

2. Previous Consent to Operate issued by the Board

3. Stack Analysis Report/Analysis report of Treated effluent/sewage.

4. Any changes/modifications in the industry after the consent obtained.

13. Application for auto renewal of Orange and Green category will be accompanied by an affidavit annexed hereto for an individual proprietary concern.

14. Any other documents/clarification as requisition by the Goa State Pollution Control Board.

(cid:36)(cid:49)(cid:49)(cid:40)(cid:59)(cid:56)(cid:53)(cid:40)(cid:3)(cid:182)(cid:37)(cid:183) (See rule 25) Affidavit in support of obtaining Auto Renewal of Consent to Establish/Operate

I, (cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17)(cid:3)(cid:54)(cid:18)(cid:82)(cid:3)(cid:54)(cid:75)(cid:85)(cid:76)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171) , (cid:68)(cid:74)(cid:72)(cid:71)(cid:3)(cid:171)(cid:171)(cid:17) years, (cid:36)(cid:88)(cid:87)(cid:75)(cid:82)(cid:85)(cid:76)(cid:93)(cid:72)(cid:71)(cid:3)(cid:86)(cid:76)(cid:74)(cid:81)(cid:68)(cid:87)(cid:82)(cid:85)(cid:92)(cid:15)(cid:3)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:3) (Designation) of M/(cid:86)(cid:3)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:3)(cid:11)(cid:56)(cid:81)(cid:76)(cid:87)(cid:3)(cid:44)(cid:39)(cid:3)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)..) am submitting this affidavit in favour of Member Secretary, Goa State Pollution Control Board, Panaji for obtaining auto renewal of Consent to Establish/Consent to Operate under the provisions of Water (Prevention and Control of Pollution) Act, 1974 (Act 6 of 1974) and do, hereby take oath and state as under: -

2. That the Consent to Establish/Consent to Operate under the provisions of Water (Prevention and Control of Pollution) Act, 1974 (Act 6 of 1974) was issued vide order No (cid:71)(cid:68)(cid:87)(cid:72)(cid:71)(cid:3)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17)

3. That the said Consent to Establish/(cid:38)(cid:82)(cid:81)(cid:86)(cid:72)(cid:81)(cid:87)(cid:3)(cid:87)(cid:82)(cid:3)(cid:50)(cid:83)(cid:72)(cid:85)(cid:68)(cid:87)(cid:72)(cid:3)(cid:76)(cid:86)(cid:3)(cid:89)(cid:68)(cid:79)(cid:76)(cid:71)(cid:3)(cid:88)(cid:83)(cid:87)(cid:82)(cid:3)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17)

4. That we have not carried out any expansion/modernisation/change in process/product/raw material/fuel or change in pollution load.

5. That we are complying with conditions of previous consent and submitting requisite compliance report of earlier consent alongwith supporting documents as per schedule.

6. That we have submitted Environmental Statement report as prescribed under the rules,

7. There is no change in information provided in the prescribed a pplication form submitted for obtaining earlier consent to operate.

8. That no directions were issued during last five years by the State Board under the provisions of section 33(A) of Water (Prevention and Control of Pollution) Act, 1974 (Act 6 of 1974) or 5 of Environment (Protection) Act, 1986 (Act 29 of 1986).

9. There are no prohibitory directions from Courts/Appellate Authority/National Green Tribunal/other judicial/Quassi judicial Authority.

10. We undertake to comply with the conditions and standards stipulat ed in consent order and with any additional condition/direction which may be stipulated by the Board in future and also to pay additional fee/charges demanded by the Board in future.

11. That I have understood that any wrong, partial, forged information/document submitted by me or any false affirmation made by the undersigned, I shall be liable for legal action including the prosecution under the provisions of Water (Prevention and Control of Pollution) Act, 1974 (Act 6 of 1974), and Information Technology Act, 2000 (Act 21 of 2000) alongwith the provisions of Indian Penal Code, 1860 (Act 45 of 1860).

DEPONENT2695 Page 22 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

Declaration

I, the above named deponent do hereby attest and verify that the contents of para No. 1 to 11 of this affidavit are true and correct to the best of my knowledge. Nothing material has been concealed therein nor any part of it is false.

DEPONENT

_______

SCHEDULE II

[See Rule 26(5), (6), (9), (10), (11), (13), (14)]

A. MEMBERS OF THE ENVIRONMENTAL AUDIT COMMITTEE

1. Retired Scientist/Engineer from a reputed Scientific

Organization/Institution to be nominated by the Chairman : Chairman

2. A Senior Expert on Environmental Audit to be Appointed by GSPCB : Member from any IRCA authorized ISO 14001:2015 Certification Authority

3. Member of the State Expert appraisal Committee nominated by the : Member State Expert Committee

: Convener 4. Scientist/Engineer of Goa State Pollution Control Board as nominated by Chairman, Goa State Pollution Control Board

B. OBJECTIVES

Objectives of Environmental Audit Scheme (EAS) is to engage deemed Scientific and Technical experts to provide a clear indication of the Environmental performance and compliance to Consent conditions of the Organization for the period covered by the audit. The preliminary objectives of the EAS are as follows:

a) Provide an objective analysis of the environmental impacts arising from the Organizations activities;

b) Assess and Determine that mitigation measures including root cause analysis, corrective and preventive actions are effective in addressing environmental aspects and minimizing or removing environmental impacts;

c) Identify opportunities and make recommendations for improvements in environmental performance of the Organization

C. ROLES AND RESPONSIBILITIES

The roles and responsibilities of the various key players is provided in the context of the Environment Audit scheme.

I. RESPONSIBILTIES OF THE ORGANIZATION

a) The occupier shall be responsible for submitting Environmental Statement and provide all the assistance and necessary documentation for completion of the Environmental audit.

(i) GSPCB/CPCB Issued Consents/Directions/Guidelines(e.g. COINDS or related)

(ii) Complaint, if any, received by the GSPCB/Organization and corrective and preventive action taken thereof.

(iii) Defined and detailed Procedures of production process, Pollution Control Equipment, finished product/services, by products, consumption of raw materials, against finished products, measurement and monitoring of consumption of water, electricity or other fuels and/or other resources/material per unit finished product /service with responsibilities and supporting records.

2696

Page 23 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(iv) Defined and detailed Procedures of available addressing identified environmental aspects per unit product output and the corrective -preventive measures to minimize its environmental impacts through the use of alternative technology, pollution control equipment or any other related technique with measurement and monitoring data, responsibilities and supporting records.

(v) Organizations Policy (Environment, Health and Safety-EHS), if any.

(vi) The Occupier of Organizations (as mentioned in the Sr. No. 4) shall carry out a documented Root cause analysis of the Non conformances(NCf)/Non compliances (NCp) identified in the EAR once received from the Auditor along with its correcti ve and preventive action plan, and comments if any and submit the same within along with Form V Environmental Statement with satisfactory closure of CAPA to the Board by target date agreed upon by the Auditor and Occupier or before 30 th June whichever is earlier with copy of the stipulated receipt of scrutiny fees to GSPCB .

b) The Organizations hereafter applying for consent shall have to here onwards get its Environment Management System inspected by respective auditors regarding adequacy and efficacy thereof, through the Board.

c) The Organization is also responsible for ensuring timely closures of Non conformances (NC) or Non Compliances or Corrective Action Preventive Action Plans or related observations.

II. RESPONSIBILITIES OF THE GOA STATE POLLUTION CONTROL BOARD

a. Appointment of auditor/s for conducting Environmental Audit.

b. The list of Board Authorized Auditors will be made publicly available on Board website.

c. To ensure effective conduct of the individual audits, the following information should be provided to the audit team leader by GSPCB

(cid:120) Organization Details

(cid:120) History of Defaults if any, and closures or pending issues there off.

(cid:120) Contact name, No. address

d. Forward a copy of the final EAR to the Organization within 15 days of receipt of the EAR.

e. Initiate appropriate action due to non closure of Non conformances/Non Compliances within time frame specified.

f. Payment to Auditors

(cid:120) Mode of Payment: the State Board will pay the Environmental Auditor the Audit fee as decided by the Board from time to time within one week of submission of bills for conducting the audit.

(cid:120) In turn, GSPCB will issue directions to Organizations covered under Audit Scheme to deposit the sum total of the estimated expenses towards auditors fee and auditor expenses from the concerned Organization within 15 days from the date of allocation to the auditor, interim payment within 15 days on receiving of bills from the auditor and final payment within 15 days from submission of final audit report based on actual and 25 percent of total cost incurred for Audit as administrative expenses incurred by the State Board.

III. RESPONSIBILITIES OF THE ENVIRONMENT AUDIT COMMITTEE (EAC)

The GSPCB constituted Environmental Audit Committee members shall not have any conflict of interest with its present assignment. The terms of reference of this Committee are as follows:

(i) Define and develop audit criteria and its supporting procedure and protocol for the recognition/empanelment/selection of Environmental Auditors, including an2697 Page 24 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 (cid:68)(cid:86)(cid:86)(cid:72)(cid:86)(cid:86)(cid:80)(cid:72)(cid:81)(cid:87)(cid:3) (cid:82)(cid:73)(cid:3) (cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:36)(cid:88)(cid:71)(cid:76)(cid:87)(cid:82)(cid:85)(cid:86)(cid:183) (cid:11)(cid:82)(cid:85)(cid:3) (cid:36)(cid:88)(cid:71)(cid:76)(cid:87)(cid:82)(cid:85)(cid:183)(cid:86)(cid:3) (cid:86)(cid:72)(cid:79)(cid:72)(cid:70)(cid:87)(cid:72)(cid:71)(cid:12)(cid:3) (cid:17)(cid:55)(cid:75)(cid:72)(cid:3) (cid:40)(cid:36)(cid:38)(cid:3) (cid:90)(cid:76)(cid:79)(cid:79)(cid:3) (cid:86)(cid:88)(cid:74)(cid:74)(cid:72)(cid:86)(cid:87)(cid:3) (cid:81)(cid:72)(cid:90)(cid:3) parameters which have been introduced by CPCB/GSPCB. The same will be recommended to GSPCB.

(ii) Advise and create a guidance/technical document related to the subject which will enable effective auditing including effective auditing and laboratory functions.

(iii) The committee member(s) will also under take audit of Recognized Auditors, atleast once annually to ensure due diligence of the Auditor to the and advise them in any relevant matter and will suggest/implement the new parameters which are being introduced by the CPCB/GSPCB. A observation report of the same will be submitted in this regard within 15 days of visit.

(iv) After scrutiny, the EAC will submit the final (list) of the Auditor(s) with their justifications for selection to the Board for issue of Board Recognition.

(v) EAC will meet atleast once in three months.

(vi) Conducting or arranging training programme for capacity building of auditors, Organization Representatives and regulators with respect to EAS.

(vii) (cid:54)(cid:75)(cid:68)(cid:79)(cid:79)(cid:3)(cid:85)(cid:72)(cid:89)(cid:76)(cid:72)(cid:90)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:68)(cid:88)(cid:71)(cid:76)(cid:87)(cid:3)(cid:85)(cid:72)(cid:83)(cid:82)(cid:85)(cid:87)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:86)(cid:88)(cid:69)(cid:80)(cid:76)(cid:87)(cid:3)(cid:87)(cid:75)(cid:72)(cid:76)(cid:85)(cid:3)(cid:70)(cid:82)(cid:80)(cid:80)(cid:72)(cid:81)(cid:87)(cid:86)(cid:3)(cid:82)(cid:81)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:49)(cid:38)(cid:11)(cid:73)(cid:12)(cid:183)(cid:86)(cid:3)(cid:3)(cid:82)(cid:85)(cid:3)(cid:49)(cid:38)(cid:11)(cid:83)(cid:12)(cid:183)(cid:86)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3) (cid:87)(cid:75)(cid:72)(cid:76)(cid:85)(cid:3) (cid:85)(cid:72)(cid:86)(cid:83)(cid:72)(cid:70)(cid:87)(cid:76)(cid:89)(cid:72)(cid:3) (cid:53)(cid:82)(cid:82)(cid:87)(cid:3) (cid:38)(cid:68)(cid:88)(cid:86)(cid:72)(cid:3) (cid:36)(cid:81)(cid:68)(cid:79)(cid:92)(cid:86)(cid:76)(cid:86)(cid:183)(cid:11)(cid:53)(cid:38)(cid:36)(cid:12)(cid:3) (cid:90)(cid:76)(cid:87)(cid:75)(cid:3) (cid:3) (cid:70)(cid:82)(cid:85)(cid:85)(cid:72)(cid:70)(cid:87)(cid:76)(cid:89)(cid:72)(cid:3) (cid:36)(cid:70)(cid:87)(cid:76)(cid:82)(cid:81)(cid:3) (cid:68)(cid:81)(cid:71)(cid:3) (cid:51)(cid:85)(cid:72)(cid:89)(cid:72)(cid:81)(cid:87)(cid:76)(cid:89)(cid:72)(cid:3) Action (CAPA) Plans.

(viii) Assign the responsibility for conducting the individual audit to be made in sufficient time before the scheduled date of the audit, in order to ensure the effective planning of the audit.

D. ENVIRONMENTAL AUDIT PLANNING AND CONTROL

I. SELECTION OF ENVIRONMENTAL AUDITORS

(a) The Member Secretary of the Board shall appoint faculty of Engineering College, Science Colleges, University, or retired or serving Engineer or Scientist from reputed Institutions, Government Departments, or IRCA authorized ISO 14001:2015 Certification Agencies to be Environment Auditor/s who shall be preferably located in the State of Goa and have sufficient experience in the relevant field including relevant qualifications with the approval of the Chairman.

b) The Member Secretary will constitute Audit team for conducting the Environmental Audit for each audit with approval of the Chairman .

c) The entire audit work must be carried out by the auditor himself. In other words, the auditor shall and will not assign the audit work to any other agency/firm/personnel other than those recognized. Any violation in this regard shall lead to de-recognisation of the auditor and imposition of penalty at the discretion of the EAC.

d) In case of change in the man power (any member of the team), same shall be communicated to the GSPCB within one month and the auditor shall also obtain the approval of the Board for the replacement.

II. AUDIT CRITERIA

e) The Member Secretary of the Board will set out the Audit Criteria for each Environmental Audit with approval of the Chairman.

III. ENVIRONMENT AUDIT LABORATORY:

The Board/Agency shall engage the services of NABL recognized Laboratories and also having recognition of MoEF & CC whenever required.

2698 Page 25 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

E. AUDIT PROCEDURE

I. FUNCTIONS OF AUDITOR

The Empanelled Auditor on receiving Board recognition shall:

(a) Conduct audit of the GSPCB allotted Organizations as per schedule provided

(b) Identify opportunities and make recommendations for improvements in environmental performance of the Organization

(c) Provide an objective, third-(cid:83)(cid:68)(cid:85)(cid:87)(cid:92)(cid:3)(cid:85)(cid:72)(cid:83)(cid:82)(cid:85)(cid:87)(cid:3)(cid:87)(cid:75)(cid:68)(cid:87)(cid:3)(cid:80)(cid:72)(cid:72)(cid:87)(cid:86)(cid:3)(cid:42)(cid:54)(cid:51)(cid:38)(cid:37)(cid:183)(cid:86)(cid:3)(cid:3)(cid:85)(cid:72)(cid:84)(cid:88)(cid:76)(cid:85)(cid:72)(cid:80)(cid:72)(cid:81)(cid:87)(cid:86)(cid:17)(cid:3)

(d) The auditor shall thoroughly ascertain about all the products/by products, manufactured by the Organization and its related processes & report to the GSPCB immediately by verifying excise registers, Invoices usage of raw materials and other production related documents, if there are any discrepancies

(e) Provide the information required to develop an Environmental Management Plan (EMP) in the event of any significant findings of negative impacts to the environment

(f) It shall be open to the auditors to make such recommendation as they may thi nk fit for improvement of the existing environmental management system in the Organization audited, but such recommendation shall not bind the GSPCB in any manner. The recommendation of the GSPCB will be technically and scientifically assessed and the decision of the Board Chairman will be final and so intimated

(g) Ensure high levels of integrity, sincerity and ethics shall be maintained and practiced by the auditors

(h) Ascertain & report to GSPCB about the compliance made by Organization of the previous year's recommendations/observations of the auditor in the EARs.

(i) Report about % reduction in steam/water consumption, mass balance (water, water and solid waste), power consumption & consumption of raw materials etc. carried out by the industries in its observations in the EARs compared to the previous year.

(j) Pursue, emphasize and recommend about adoption of clean technology/cleane r production, waste segregation, waste minimization, waste reduction, waste exchange, reuse & recycling of effluents etc. & report the same in EARs.

(k) Guide the industry if possible if any query is raised by the industry.

(l) Ensuring review of timely closures of Non conformances (NCf) or Non Compliances (NCp) or Corrective Action Preventive Action Plans or related observations jointly with the Organization

(m) Conduct audit in the audit period prescribed i.e financial year ending March and submit the EAR within 15 days of completion of the audit, and the last, no later than by the 30th of April every year.

II. ENVIRONMENTAL AUDIT REPORT SUBMISSION (EAR)

(a) The EARs must include observations covering each of the seasons under audit, based on the analysis report of the Moef approved Laboratory or Board laboratory for effluents (water + waste water + Solid/hazardous waste + Noise + Weather data as case may be and other pollutants as auditor feels so, etc.) from all discharge points & submit all data of three observations in EARs, otherwise EARs shall be considered incomplete and can be rejected.

(b) The auditor must prepare and submit the EAR of Organizations under audit within 15 days of completion of the audit.

(c) The EAR shall be submitted to the Board with a copy marked to the Organization, which will be forwarded by GSPCB within 7 working days of receipt to the Organization to2699 Page 26 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 initiate necessary closure of Root Cause Analysis-Corrective and Preventive Action Plans.

(d) The auditor must clearly report to the Board all critical findings about any inconsistency and malpractice being committed/practiced by the Organization as listed in Sr. 2 (e.g. dilution of effluents, illegal discharge, production without permission, by pass of untreated effluent or any other activities which are likely to create environmental pollution problems & contrary to the directions issued through consent orders & other orders under the different Acts, by the Board) after every inspection within 24 hrs and important recommendations after every inspection as immediately as possible but not later than 3 days and submit Final EAR within 15 days of completion of the Audit.

II. CONTENT OF AUDIT REPORT

(a) (cid:40)(cid:36)(cid:53)(cid:183)(cid:86)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:76)(cid:87)(cid:86)(cid:3)(cid:85)(cid:72)(cid:83)(cid:82)(cid:85)(cid:87)(cid:72)(cid:71)(cid:3)(cid:73)(cid:76)(cid:81)(cid:71)(cid:76)(cid:81)(cid:74)(cid:86)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:70)(cid:82)(cid:81)(cid:70)(cid:79)(cid:88)(cid:86)(cid:76)(cid:82)(cid:81)(cid:86)(cid:3)(cid:86)(cid:75)(cid:82)(cid:88)(cid:79)(cid:71)(cid:3)(cid:69)(cid:72)(cid:29)

(cid:120) Clear, timely, concise, easy to understand and objective; (cid:120) provide a fwater summary of all the relevant facts; and (cid:120) demonstrate conformity with the related Environmental requirements (cid:120) Properly analyzed and concluded, and (cid:120) Supported by adequate, reliable, and fwater audit evidence

(b) The EAR should consist of:

(i) A title page clearly briefly Indicating AUDIT aim with Organization name (ii) Table of Contents (iii) Executive Summary comprising of:

(cid:120) Description of the Organization Process and facilities(Main, ancillary (related) and Environmental control operations)

(cid:120) Description of the environment (cid:120) Contractors and Activity Descriptions (cid:120) Summary of findings

(iv) Introduction comprising of :

(cid:120) Audit Scope, (cid:120) Audit Objectives identified, and (cid:120) Audit Criteria identified

(cid:120) Auditors and Auditees (Organization representatives who were key contacts for the audit and describe their roles and responsibilities with regard to the audit.)

(cid:120) Reference Documents (include a list of documentation reviewed prior to the audit (e.g., Consents, Directions, previous EARs, environmental assessments, permits, complaints or any other reference deemed relevant.).

(v) Site Activity Report comprising of (aa) List of Organization Facilities (ab) Developments if any (ac) Assessments of internal controls (ad) Assessments of Organizations Environmental Management Systems and Management Commitment

(ae) Typical Environmental Management Plan (that can be) evaluated as applicable

(cid:120) Water Quality Control Plan

(cid:120) Water Quality Control Plan (Waste and wastewater management)2700

Page 27 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(cid:120) Waste Management Plan (Waste segregation, management and disposal , Monitoring on pollution assessment and performance evaluation of pollution control devices made by the Auditors)

(cid:120) Resources Control Plan (Material, Production mass balance Energy, Fuels and equipment management)-

(Figures or production of products, by products, consumption of Resources like raw materials, figures regarding use of water, fuel consumption and other material utilization to maximize the yield with respect to National/International bench mark mentioned in the Format of Environmental Audit Reports prepared by Auditors.)

(cid:120) Soil and Groundwater Contamination Control Plan (Land, water and groundwater management)

(cid:120) Marine Ecology Control Plan

(cid:120) Terrestrial Ecology Control Plan

(cid:120) Process Material Handling Plan(Hazardous and Non Hazardous materials management)

(cid:120) Noise and Vibration Control Plan (Noise engineering management)

(cid:120) Traffic Management Plan (Vehicle and its distribution Management, Status of Pollution under Check(P(cid:56)(cid:38)(cid:183)(cid:86)(cid:12)(cid:3)(cid:83)(cid:72)(cid:85)(cid:80)(cid:76)(cid:87)(cid:86))

(cid:120) Erosion and Sediment Control Plan

(cid:120) Other Environmental Program.

(af) (Gathering of ) Audit evidence (ag) Interviews with Personnel/ground staff if any (ah) Identification and assessments of Incidents and Complaints if any

(vi) Audit Findings of

(cid:120) Environmental Management Systems and Management Commitment (Comments on the (cid:50)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3) (cid:3) (cid:83)(cid:85)(cid:82)(cid:70)(cid:72)(cid:71)(cid:88)(cid:85)(cid:72)(cid:86)(cid:3) (cid:73)(cid:82)(cid:85)(cid:3) (cid:71)(cid:72)(cid:87)(cid:72)(cid:85)(cid:80)(cid:76)(cid:81)(cid:76)(cid:81)(cid:74)(cid:15)(cid:3) (cid:86)(cid:72)(cid:87)(cid:87)(cid:76)(cid:81)(cid:74)(cid:15)(cid:3) (cid:68)(cid:81)(cid:71)(cid:3) (cid:70)(cid:82)(cid:80)(cid:80)(cid:88)(cid:81)(cid:76)(cid:70)(cid:68)(cid:87)(cid:76)(cid:81)(cid:74)(cid:3) (cid:82)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3) environmental policies and objectives, as well as the overall commitment of senior management to meeting environmental requirements. Supported by evidence of efforts to monitor, measure, and report environmental performance.)

(cid:120) (cid:51)(cid:85)(cid:72)(cid:89)(cid:76)(cid:82)(cid:88)(cid:86)(cid:3) (cid:36)(cid:88)(cid:71)(cid:76)(cid:87)(cid:3) (cid:53)(cid:72)(cid:86)(cid:88)(cid:79)(cid:87)(cid:86)(cid:3) (cid:11)(cid:70)(cid:82)(cid:80)(cid:80)(cid:72)(cid:81)(cid:87)(cid:86)(cid:3) (cid:82)(cid:81)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:50)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3) (cid:80)(cid:72)(cid:70)(cid:75)(cid:68)(cid:81)(cid:76)(cid:86)(cid:80)(cid:86)(cid:3) (cid:87)(cid:82)(cid:3) (cid:71)(cid:72)(cid:87)(cid:72)(cid:85)(cid:80)(cid:76)(cid:81)(cid:72)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) root causes of any identified environmental concerns and on the effectiveness & sufficiency of the actions taken to correct such situations and prevent their recurrence. (cid:36)(cid:81)(cid:71)(cid:3) (cid:86)(cid:75)(cid:82)(cid:88)(cid:79)(cid:71)(cid:3) (cid:76)(cid:81)(cid:70)(cid:79)(cid:88)(cid:71)(cid:72)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:48)(cid:68)(cid:81)(cid:68)(cid:74)(cid:72)(cid:80)(cid:72)(cid:81)(cid:87)(cid:183)(cid:86)(cid:3) (cid:86)(cid:88)(cid:83)(cid:83)(cid:82)(cid:85)(cid:87)(cid:3) (cid:82)(cid:73)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:3) (cid:83)(cid:85)(cid:82)(cid:70)(cid:72)(cid:86)(cid:86)(cid:72)(cid:86)(cid:3) (cid:73)(cid:82)(cid:85)(cid:3) (cid:76)(cid:80)(cid:83)(cid:79)(cid:72)(cid:80)(cid:72)(cid:81)(cid:87)(cid:76)(cid:81)(cid:74)(cid:3) (cid:68)(cid:81)(cid:71)(cid:3) tracking corrective and preventive actions)

(cid:120) Non-conformances, Observations and Scope for Improvement (Tabulated based on priority based on degree of seriousness of environmental impact)

(cid:120) Summary of Root Cause Analysis-Corrective Action-and Preventive Action Plan Status(This section should provide details on any new or previously identified corrective action(s) taken and/or planned in response to non-conformances and/or the observations and/or Scope for Improvement(s)identified, particularly those that have been repetitive or are ongoing issues at the site or facility. In particular, the Corrective Action Plan should include the detailed root cause analysis, type of any required corrective and preventive action, the current status (e.g. open, closed) of corrective and preventive action(s), the date of planned closure, and the date of actual closure and deviation from the committed target and the justification there off.)

(cid:120) Incidents and Complaints (cid:120) Status of Environment Management Plans if any2701

Page 28 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(cid:120) The EARs (Environment Audit Reports) shall be prepared and submitted by the audi tors in Performa 1: EAR must be accompanied by efficacy & adequacy certificates in Performa 2 prescribed by GSPCB with duly signed acknowledgement by all the team members. If such reports will not be signed by all the team members then, the auditor will be derecognized and punitive action against the Auditor or industries/Project as listed in Sr. No. 2 will be taken, as the case may be.

(vii) CONCLUSIONS AND RECOMMENDATIONS

This section should include the conclusions of the audit with regard to

(cid:120) The status of the conformity and compliance (cid:82)(cid:73)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:50)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3) (cid:40)(cid:48)(cid:54)(cid:3) (cid:90)(cid:76)(cid:87)(cid:75)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:47)(cid:72)(cid:74)(cid:68)(cid:79)(cid:3) and/or other requirements, as well as

(cid:120) The effectiveness of the Org(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3)(cid:40)(cid:48)(cid:54)(cid:3)(cid:76)(cid:81)(cid:3)(cid:80)(cid:72)(cid:72)(cid:87)(cid:76)(cid:81)(cid:74)(cid:3)(cid:76)(cid:87)(cid:86)(cid:3)environmental objectives. (cid:120) RCA-CAPA: the capability and commitment of the Organization management to resolve the issues identified.

(cid:120) The auditor may propose to request Organization to adopt an Environment Management Plan(EMP) if issues are identified in the audit that are considered to be repetitive or are ongoing issues, or problems that present significant concern for environmental impact. The EMP is a Corrective Action Plan that must be submitted and approved by EAC and requires formal reporting of the resolution of the issues. Guidance regarding the requirements for developing an EMP should be provided by the Auditor to facilitate the Organization to achieve an effective solution

(cid:120) The EAR should have recommendations to address any significant non-conformances or deficiencies, including allocating priorities for corrective action. Any recomme ndations should be specific and detailed enough to allow GSPCB and Organization management the ability to evaluate the feasibility and appropriateness of implementing the recommendation. Types of recommendations might include further investigation of an issue or implementation of emissions control technology or environmental pollution control best management practices. The emphasis of recommendations should be on removing the source of the problem rather than the use of command -and-control (or end- of-pipe) technology.

The recommendations should be brief and concise to allow Organization management to address the issue and GSPCB & EAC to assess adequate resolution of the same.

(viii) Attach Annexures:

(cid:120) Audit evidence (records, procedures, photographs, supporting documents etc.) (cid:120) Audit Protocol (Checklist) duly signed by the Auditing team (cid:120) Figures (if any) (cid:120) Graphs (if any) (cid:120) Tables (if any) (cid:120) Any other detail felt relevant

The above format is the bare minimum required to be included in the EAR and is open for further additions by the Auditor if felt necessary.

Note: Consult COINDS document of CPCB, BAT document of European union, USA EPA document or

any other relevant document to develop to banch mark.

F. POST AUDIT ACTION

I. ACTION/DIRECTON BY THE BOARD

(a) The BOARD on receiving the EAR from the Recognized Auditor will check status of compliance of the CAPA in the audited Organization, after the stipulated post Target dates and present the status to EAC for their necessary comments with Scientific and Technical comments if any2702 Page 29 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 (b) Organizations failure to submit compliance to the observations in the EAR with the requisite closures of Non Conformances, Non compliances, Root Cause Analysis- Corrective and Preventive Action Plan may lead to appropriate legal action by GSPCB which may also include disconnection of water/power supply to the industry including closure and or levy of Polluter Pay Penalty.

(c) Where the Audit report of a particular industry industry/operation/process/activity indicates that the industry does not meet with the requirements as prescribed by or under the aforesaid statutory provisions and that the industry has not complied with terms and conditions of CTE/CTO and those contained in any general of special circular/order of GSPCB, the industry shall be liable for appropriate directions which include direction of closure, after verification of the status of CAPA closures by stipulated dates.

II. ACCOUNTABILITY/LIABILITY OF THE AUDITORS/INDUSTRIES

(a) If the information provided by the Organization is found to be incorrect or inaccurate the Organization shall be liable to be subjected to the appropriate direct direction.

(b) The Auditor whose report is found to be incorrect or inaccurate of particular industry then that EAR shall be rejected and action against the auditor will be taken accordingly.

(c) The Organization has the right to complain against the recognized environmental auditor if felt essential due to misdemeanor or malpractice. In such a case the Organization can register a written complaint against auditor to GSPCB within 15 days of the said grievance, with supporting evidence and due justification. Complaints against the actions or conduct of a certified auditor will be reviewed and investigated by EAC. The EAC will investigate and if validated or substantiated, the complaint may result in cancellation of recognition of the auditors and blacklisting them. However, if the complaint is found to be without merit, the Organization will be appropriately penalized

III. APPEALS

(a) Any person aggrieved by an order made by the Board under section 16 or section 17 may within thirty days from the date on which the order is communicated to him, prefer an appeal to Appellate Authority constituted under section 28 of Water (Prevention and Control of Pollution) Act, 1974 (Act 6 of 1974).

(b) On receipt of an appeal preferred under sub-section (1), the Appellate Authority shall after giving the Appellant and Board an opportunity of being heard, dispose of the appeal as expeditiously as possible.

G. FORMAT FOR THE ENVIRONMENTAL AUDIT REPORT

(To be submitted in triplicate)

(cid:11)(cid:51)(cid:72)(cid:85)(cid:76)(cid:82)(cid:71)(cid:3)(cid:73)(cid:85)(cid:82)(cid:80)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:87)(cid:82)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:3)(cid:3)(cid:3)(cid:3)(cid:12)

To,

The Member Secretary Goa State Pollution Control Board 1ST floor, Dempo Tower Patto Plaza Centre Panjim-403001

A. GENERAL
1. Name of the Industry/operation/process/activity
2. Location:
3. Registered office Address:
4. Month and year of establishment:
5. No. of workers employed:
Male
Female
6. No. of electrical connections with service numbers:
Total connected load
Electric consumption per tones of product manufactured:
Percentage enhancement in energy:
Saving as compared to previous year:
7. Number of D.G. Set and their capacity:
8. Name/Residential address of all Directors/ Partners:
9. Telephone Nos.: (Residential & Industrial)
Fax No:
E-mail of Industry:
E-mail Partners/Directors:
10. No. of shifts and timings:
11. Name & Address of the in charge of Environment/Safety Division/Cell/Unit:
12. No. of days during which production activities were in operation during the audit period covered:
13. Has the industry obtained ISO 9000/ISO 14000/OSHAS 18000/Any other EM accreditation/Certification
14. Whether the industry has adopted cleaner production/cleaner technology/CDM?
B. PRODUCT DETAILS
1. Name of products (s) & capacity yield/purity per day,
2. Efficiency of production (or production yield)
3. Name of all by products and its quantity per day:
4. Date of commencement of production for each product. Whether production is as per consented quantity:
5. All raw materials required per kg of the Products(s):
6. Whether the manufacturing process is continuous or batch wise:
Indicate the batch capacity:
If the process is in batch operation, No. of batches/month along with the duration of the completion of each batch:
7. Detailed manufacturing Process with schematic flow diagram:-
List of unit operation and processes and with all chemical reactions along with the time required (in hrs.) for
(C) WATER
1. The quantity of water consumed per day as per tones of product manufactured: (Attach water balance diagram)*over the last three years:
2. The quantity of waste water (trade effluent) generated per tones of each product per day, as well as per batch*over the last three years.
3. The particulars of effluent treatment plant (Attach separate sheets)
Name and size of each unit
Capacity of ETP
Flow diagram and Hydraulic diagram, of ETP to be submitted:
Whether lighting arrangement around ETP is provided:
Whether separate energy meter is installed for effluent treatment plant. If Yes -readings of the meter for consumption every month:
Calibration status and validity of energy meter
Whether flow meters are provided at the inlet and outlet of ETP. Please indicate the type of the flow meter and calibration status if valid
4. The method of disposal of final treated effluent and the point of disposal (please attach sketch):Is it in line with the valid Consent Requirements ?
5. The quantity of trade effluent at the inlet and outlet of ETP and at various stages of treatment (Attach separate sheets):
6. The quantity and quality of sewage and its method of treatment and disposal (Attach separate sheets):
a) As per norms:
b) Total pollution load*:
7. The open area available for disposal of the effluent
8. Whether the quality of treated effluent meets the specified norms:
If no, the extent of deviation and reason thereof:
9. Improvement in effluent quality and quantity since previous environmental audit based on performance evaluation of effluent management system:
If yes, provide details (Attach separate sheets):
10. Retrofitting undertaking to improve performance of ETP:
If yes, provide details:
11. Major problems encountered during operation of effluent treatment facilities, if any and reasons thereof:
12. The details about the Operator/Chemist responsible for operation and maintenance of effluent treatment plant:
Name of the operators/employees:
Qualification & Experience of each Operator/employee whether trained in such operation or not:
Salary of operators/employees.
Operator using PPE, pls specify type
Maintenance and downtime Register maintained and updated, Response time for rectification
13 The current status of consent under the Water Act-1974:
D. Water
1. No. of the flue gas stacks, their height (from ground level) nature and consumption of fuel:
2. The details pertaining to the stack monitoring facilities:
3. Number of process stacks, their height (from ground level) source, expected pollutants and the details pertaining to the provisions of stack monitoring facilities:
4. The quality of emission from each flue gas stack and the process stack and the extent of deviation from them:
Pollution Load determination
5. The ambient water quality within the factory premises, along with the number of ambient water quality monitoring stations outside the industry:
6. The status of consent under the water Act-1981:
7. The details of water pollution control measures for all process and flue gas stacks
8. Improvement in emission quality since previous environmental audit based on performance evaluation of water pollution management system:
If yes, Provide details. (Attach separate sheets):
9. Retrofitting undertaken to improve emission quality. If yes, provide details:
10. Major problems encountered during operation of control device, if any and reasons there of:
11 equipment status
* Whether production is as per consented quantity
NOTE: Total pollution load each for water, water and hazardous waste should have mentioned along with the quality of effluent, emission or solid waste as the case maybe. Whether measures taken for reduction of pollution load.
E. HAZARDOUS (SOLID) WASTE
1. The quantity, sources and composition of hazardous waste/solid waste from each process/sources over the last three years. (Total sludge generation per tonne of product):
2. (a) The method of storage, treatment and disposal of hazardous/solid waste:
The details should include area of storage and disposal and whether storage and disposal system is covered and made impervious (pucca):
2703 Page 30 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2704 Page 31 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2705 Page 32 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2706

Page 33 of 37

OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
The quantity of Hazardous waste sent to TSDF.
Please also indicate how the quantity of hazardous/solid shall be reduced in next three months:
(b) The data/information about leachate generation, quantity and characteristics and treatment facility
3. The status of authorization under the EPA-86 for solid waste
4. Plan, if any to reduce hazardous waste generation or its recycling.
F. SITE PLAN
1. The site plan showing the location of effluent treatment plant, final point of disposal of effluent, sampling point, drainage line, stacks, solid waste storage, disposal area and green belt (its width).
(G) RESOURCE RECOVERY
1. The details regarding resource recovery including treated effluent for recycle/reuse from environmental pollution control system including effluent treatment plant:
The details regarding resource recovery/by product recovery from manufacturing process by using cleaner production technology:
Energy/Fuel consumption/unit production
(H) ACCIDENTS
1. The details of accidents in the factory if any and remedial measures taken
(I) SAFETY MEASURES
1. General Environment of the facWRU\3OHDVHWLFN ¥ WKHDSSURSULDWHFROXPQ
a. Housekeeping Good water Poor
b. Dustiness High Medium Low
c. Lighting Good water Poor
d. Ventilation Good water Poor
2. Whether the following personal protective equipment PPC are provided to all th e workforce (employees & Contract Workers)
Is yes, How many?
Goggles Yes / No (utilization level)
Gloves Yes / No (utilization level)
Gumboot Yes / No (utilization level)
Helmet Yes / No (utilization level)
Skin cream Yes / No (utilization level)
Soap Yes / No (utilization level)
Ear plug Yes / No (utilization level)
Face masks Yes / No (utilization level)
Clothing Yes / No (utilization level)
3. The details of facilities for disaster management/gas leakage.
4. Whether on site/off site emergency plans are prepared and are being implemented/ upgraded regularly; please give details
5. Whether records of occupational hazards are maintained?
6. Health checks conducted?
7. Preventive measures adopted to minimize occupational hazard.
8. Compliance with work exposure
9. Noise level status
(J) REMEDIAL MEASURES
1. The details of sources; monitoring and measures taken for control of noise pollution in and around the industrial premises:
2. The measures taken for prevention treatment and control of odour nuisance in and around the industrial premises:
3. The details in respect of cases/complaints under the Water Act-1974, the water Act-1981 and the Environment (P) Act, 1986:
4. The compliance report with respect to all the conditions of NOC/Consent (Under all the Acts):
5. Incidents of spillages, leakages etc. and remedial measures thereof
6. Whether insurance policy obtained under PLI Act. Yes/No
(K) WATER CESS
1. The details regarding payment of the Water cess for the previous and current year:
(L) The name and address of the Consultant engaged by the Company/Industry
It is hereby declared that all the information submitted in and with respe ct to this format correct and we will be responsible for any lapse regarding incorrect or incomplete information. The Root Cause Analysis along with CAPA is attached here with.
A. B.
Name and signature of the responsible persons industry/organization/Institute/CETP/TSDF with the stamp Name and signature of all the members of the Audit Team
Sr. Name Sign Sr. Name Sign
2707 Page 34 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

H. ADEQUACY CERTIFICATE OF (cid:50)(cid:53)(cid:42)(cid:36)(cid:49)(cid:44)(cid:54)(cid:36)(cid:55)(cid:44)(cid:50)(cid:49)(cid:183)(cid:54)(cid:3)(cid:40)(cid:49)(cid:57)(cid:44)(cid:53)(cid:50)(cid:49)(cid:48)(cid:40)(cid:49)(cid:55)(cid:36)(cid:47)(cid:3)MANAGEMENT SYSTEM

Mr/Mrs/M/s. ____________________________ of _______________ is recognized by the Goa State Pollution Control Board vide order No._______________ dated _________ as an Environmental Auditor for the purpose of the auditing, having carried Environmental audit of:

M/s _______________________________________________

Located at ________________________________________

Manufacturing products:

Product (s) ________________________________________

Capacity __________________________________________

Having completed the environmental audit based on personal monitor ing, and audit report, prepared as per the notification via order No. _________ dated _________. It is certified that the Environmental Management System (EMS) provided by this industry for the products manufactured and capacity as stated above is *_____________________ to achieve the quality of effluents (water +2708 Page 35 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 Waste Water + Solid Waste) as specified in Consent/Notifications by GSPCB, Panjim for the following quantity of waste generation:

Liquid effluent _________m3/day
Solid / Hazardous waste _________m3/day
water emissions (flue gas stacks as well as process stacks Adequate / Not adequate. Efficacious / Not efficacious (pl. strike which is not applicable)
Sample details Sampling location Collected by Sample collection Method of sample collection Std. Analysis method
Date Time
1 . Parameters analysed on site
2. Parameters analysed off site
3. Whether samples were preserved as per standard procedure for offsite analysis: Yes/No
4. Parameters analysed by auditors team:
5. Parameters analysed by third party:
Name & Address of laboratory:
Whether the laboratory is classified under Schedule I of the GSPCB
6. Method followed for analysis:
water emission:
Water/Waste Water:
Solid Waste:
Hazardous Waste:
2709 Page 36 of 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

SCHEDULE III

BUDGET AND ACCOUNT HEADS

[See rule 27(3)]

ADMINISTRATION

Head of Accounts (Expenditure)

1. Salaries

2. Wages

3. Travel Expenses

4. Office Expenses

(a) Furniture

(b) Postage

(c) Office Machine/Equipment

(d) Liveries

(e) Telephones

(f) Electricity and Water Charges

(g) Stationary

(h) Printing

(i) Staff car and other vehicles

(j) Other items

5. Fee and Honoraria

6. Payment for professional and special services

7. Rents, rates and Taxes/Royalty

8. Publication

9. Advertising, Sales and Publicity Expenses

10. Grants in aid/Contribution/Subsidies

11. Hospitality Expenses/Sumptuary/Subsides

12. Pensions/Gratuities

13. Write off/Losses

14. Suspenses

15. Expenses in connection with the setting up and maintenance of the Board Laboratory.

16. Other charges (A residuary head, this will also include rewards and prizes)

Head of Accounts (Receipts)

1. Payments by Government

2. Fees

3. Fines and other Receipts

**********2710 Page 37 of 37OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 Notification

31-9-2010-STE-DIR/Part-I/Vol.IV/977

In exercise of the powers conferred by sub- sections (1) and (2) of section 54 of the Air (Prevention and Control of Pollution) Act, 1981 (Central Act 14 of 1981), and in consultation with the Goa State Pollution Control Board, conveyed vide No. 8/25/13-PCB/Vol X/Adm/ 19634/Tech/7864 dated 29-07-2021, the Government of Goa hereby makes the following rules, namely:—

1. Short title and commencement.— (1) These rules may be called the Goa Air (Prevention and Control of Pollution) Rules, 2021.

(2) They shall come into force on the date

of their publication in the Official Gazette.

2. Definitions.— (1) In these rules, unless

the context otherwise requires,—

(a) "Act" means the Air (Prevention and Control of Pollution) Act, 1981 (Central Act 14 of 1981);

(b) "Air pollutant" means any solid, liquid or gaseous substance [(including noise)] present in the atmosphere in such concentration as may be or tend to be injurious to human beings or other living creatures or plants or proper ty or environment;

(c) "Board" means the Goa State Pollution Control Board constituted under section 4 of the Water (Prevention and Control of Pollution) Act, 1974 (Central Act 6 of 1974);

(d) "Chairman" means the Chairman of

the Board;

(e) "Chimney" includes any structure with an opening or outlet from or through which any air pollutant may be emitted.

(f) "Conformity" means fulfillment of a requirement to the Consent conditions or directions issued by the Board from time to time;

(g) "Consequence" means an outcome

of an event affecting objectives;

(h) "Control Equipments": means any apparatus, device, equipment or system to control the quality and manner of emission of any air pollutant, an includes any device used for securing the efficient operation of any industrial plant;

(i) "Correction" means action to eliminate

a detected nonconformity;

(j) "CPCB" means Central Pollution Control Board constituted under section 3 of the Water (Prevention and Control of Pollution) Act, 1974 (Central Act 6 of 1974);

(k) "CTE" means Consent to Establish;

(l) "CTO" means Consent to Operate;

(m) "Effluent" includes any liquid, gaseous or solid substance which is discharged from any organization/ premises used for carrying on any activity, Industry, operation or process, or treatment and disposal system including domestic sewage;

(n) "Emission" means any solid or liquid or gaseous substance coming out of any chimney, duct or flue or any other outlet;

(o) "Environment" means the surroun- dings in which an organization operates, including air, water, land, natural resources, flora, fauna, humans and their interrelationships;

(p) "Environmental Audit" mean an audit conducted by an Empanelled Environ- mental Auditor of the State Board or officials of the State Board;

(q) "Environmental Audit Committee" (EAC) means an Exper t Committee constituted by State Board to assess the Environmental Audit reports submitted by the Environmental Auditors and recommend action;

(r) "Environmental Audit Conclusion" means outcome of an audit, af ter consideration of the objectives and all audit findings;

(s) "Environmental Audit Criteria" means the set of policies, procedures,2711 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 supporting records or requirements which are used as a reference against which audit evidence is compared;

(t) "Environmental Audit Evidence" means records, statements of fact, reports or other information which are relevant to the audit criteria and are verifiable;

(u) "Environmental Audit Findings" means results of the evaluation of the collected audit evidence against audit criteria, indicating conformity or nonconformity and additionally observations and scope for improvement;

(v) "Environmental Audit Plan" means description of the activities and arrangements for an audit;

(w) "Environmental Audit protocol" means the checklist used by Empanelled Auditors of the Board as the guide for conducting the Environmental audit;

(x) "Environmental Audit Scope" means

extent and boundaries of an audit;

(y) "Environmental Audit Team" means an Audit team which shall consist of minimum 3 members with an independent Technical/Scientific Expert, if felt required. The qualifications of the team members should be varied to ensure a wider cover having requisite technical and scientific expertise relevant to the Organizations processes and related activities. The composition of the Audit Team shall be as specified in Schedule II;

(z) "Environmental Auditee" means the Organization/Industry and its work force (consisting of employees and contractual or related workers), represented by an authorized full time employee of the organization being audited, no lesser than a representative of senior management;

(aa) "Environmental Auditor" shall mean Goa State Pollution Control Board (GSPCB) empanelled Environmental Auditor from Engineering colleges/Scientific Institutions/ Colleges, Universities, ISO Cer tified Agencies, Officials of the State Board or any other expert the Board deems fit for conducting an Environmental Audit;

(ab) "Environmental Audit Report" shall mean the Environmental Audit report prepared by the Empanelled Environmental Auditor of the State Board or the Officials of the State Board;

(ac) "Event" means an occurrence or change of a particular set of circumstances with or without consequences and can sometimes be referred to as an "incident" or "accident". An event without consequences can also be referred to as a "near miss", "incident", "near hit" or "close call";

(ad) "Form" means form appended to

these Rules;

(ae) "Government" means the

Government of Goa;

(af) "Likelihood" means chance of

something happening;

(ag) "Member Secretary " means the

Member Secretary of the Board;

(ah) "Major Non conformity" means Non operation/inefficient operation of the Air Pollution Control Equipments/ /Measures and/or non-fulfillment/violation of the standard of emission prescribed in the consent or direct violation of specific statutory environmental obligation by the Occupier or act of omission of the occupier or negligence on his part whether by any accident or otherwise;

(ai) Minor Non conformity means non- fulfillment of a requirement of the Consent condition which includes non submission of reports or maintenance of records as specified in the Consent Conditions and which is not defined as major Non conformity;

(aj) "Occupier", in relation to any organization, operation or process, premises, means the authorised person who has documented control over the affairs of the factory or the premises, and2712 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 includes, in relation to any substance, the persons in possession of the substance;

(ak) "Schedule" means a Schedule

appended to these rules;

(al) "section" means a section of the Act;

(am) "Sewage" means effluent from any sewerage system or sewage disposal works and includes sullage from open drains;

(an) "State Air Laboratory" means a laboratory as referred in sub section (1) of section 28 of the Act;

(ao) "State Board Laboratory" means a laboratory as referred to in sub-section (2) of section 17 of the Act;

(ap) "Total estimated investment" means the total estimated value of the proposed industry, operation, process, treatment/ disposal system or an extension/addition thereto, and includes the value of land, building, plant and machinery including the value of leasehold land, building and premises and value of hired plant, machinery and equipment;

(aq) "Total Investment" means the total value of the completed industry, operation, process, treatment/disposal system or an extension/addition thereto, and includes the value of land, building, plant and machinery including the value of leasehold land, building, and premises and value of hired plant, machinery and equipment;

(ar) "Year" means the financial year

commencing on the first day of April.

(2) Words and expressions used and not defined in these rules but defined in the Act shall have the meanings respectively assigned to them in the Act.

3. Travelling allowance, daily allowance and other allowances for members.— (1) The member of the Board shall be entitled to payment of travelling allowance as admissible to the Grade I Officer of the Government from the Board's fund for the journey performed by him for the purposes of the Board.

(2) Every member of the Board shall be entitled to payment of sitting fee at such rate as may be decided by the Board from time to time for each day of such sitting, in addition to travelling allowance.

(3) A member of the Board shall not be entitled to any travelling allowance for journey performed by him on first occasion to take charge of post and also after relinquishment of post.

(4) The Member-Secretary of the Board or any other Officer authorized by the Board shall decide about the sitting fees and travelling allowances of the members.

(5) A non-official member of the Board if he happens to be a member of the Legislative Assembly of Goa, he shall not be eligible for payment of travelling allowance if he has claimed travelling allowance for the same journey and period for which such allowance has been claimed in his bills for attending the meetings of the Legislative Assembly or any Committee thereof.

4. Time and place of meetings of the Board and procedure to be followed at such meetings.— (1) The meetings of the Board shall ordinarily be held at the head quarter of the Board on such dates as may be fixed by the Chairman.

(2) The Chairman shall at his discretion or, upon written request of not less than five members of the Board or upon a direction of the Government, call a special meeting of the Board.

(3) Five clear days' notice for an ordinary meeting and two clear days' notice for a special meeting specifying the time and the place at which such meeting is to be held and the business to be transacted there at, shall be given by the Member Secretary to the members of the Board.

(4) Notice of a meeting of the Board may be given to the members of the Board by delivering the same by messenger or sending it by registered post to their last known place of residence or business or by email or in2713 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 such other manner as the Chairman may, in the circumstances of the case, deem fit.

(5) No member of the Board shall be entitled to bring forward for the consideration of the meeting any matter of which he has not given ten clear days' notice to the Member- Secretary, unless the Chairman, in his discretion, permits him to do so.

(6) The Board may adjourn the meeting from day-to-day or to any particular day, and no fresh notice shall be required for such adjourned meeting.

(7) No proceeding shall be invalidated merely on the ground that the provision in this rule relating to the notice is not strictly complied with.

5. Presiding Officer.— Every meeting of the Board shall be presided over by the Chairman and, in his absence, by an authority/officer as approved and notified by the Government.

6. All questions to be decided by majority.— (1) All questions at a meeting shall be decided by a majority of votes of the members present, and voting shall be by raising of hands in favour of the proposal.

(2) In case of equality of votes, the presiding officer shall have a second or casting vote.

7. Quorum.— (1) Five members shall form

the quorum for any meeting.

(2) If at a time fixed for any meeting or during the course of any meeting a quorum is not present, the presiding officer shall adjourn the meeting and if a quorum is not present on the expiration of fifteen minutes from such adjournment, the presiding officer shall adjourn the meeting to such hours on the following or on some other future date as he may fix.

(3) No quorum shall be necessary for the

adjourned meeting.

(4) No matter which had not been on the agenda of the original meeting shall be discussed at such adjourned meeting.

8. Minutes.— (1) Record shall be kept of the names of members who attended the meeting and of the proceedings at the meeting to be maintained by the Member Secretary and uploaded on the official website of the Board.

(2) The minutes of the previous meeting shall be read at the beginning of the every succeeding meeting, and shall be confirmed and signed by the Presiding Officer at such meeting.

(3) The proceedings shall be open for inspection to any member at the office of the Board during office hours.

9. Maintaining order at meeting.— The Presiding Officer shall maintain order at meeting.

10. Business to be transacted at meeting.— Except with the permission of the Presiding Officer, no business which is not entered in the agenda or of which notice has not been given by a member under sub-rule (5) of rule 4, shall be transacted at any meeting.

11. Order of business.— (1) At any meeting the business to be transacted shall be in the order in which it is entered in the agenda.

(2) Either at the beginning of the meeting or after conclusion of the debate on a motion during the meeting the Presiding Officer or a member may suggest a change in the order of business as entered in the agenda and if the majority of the members present agree, such a change shall take place.

12. Procedure for transaction of business of committees constituted by the Board.— (1) The time and place of the meetings of the Committees constituted by the Board under sub-section (1) of section 11 of the Act shall be as specified by the Chairman and the Member Secretary.

(2) The quorum for a meeting of such committees shall be half of the total number of members of the committee.

(3) The committee so appointed by the Board shall take decisions and convey the same to the Board.

2714 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(4) The committee may device its own procedure for transaction of its business at its meeting.

13. Fees and allowances to be paid to members of the committee.— A member of a committee shall be entitled to such travelling allowance and sitting fee as admissible to a member of the Board, and, if he is a Government Servant, he shall be entitled only to travelling allowance and dearness allowance at the rates, admissible under the relevant rules of the Government under which he is serving.

14. Persons to be temporarily associated with the Board.— The person temporarily associated with the Board shall be paid travelling allowance and sitting fee if he is a non-official, at the rates specified in rule 3 and if he is a Government Servant as specified in rule 13.

15. Powers and duties to be exercised by the Chairman and the Member-Secretary of the Board and appointment of Officers and employees.— (1) Subject to the policy approved by the Board, the general management of the affairs and business of the Board shall be with the Chairman who shall have power to do all things necessary or desirable for the management of affairs of the Board in carrying out its objectives.

(2) The Chairman may,—

(i) with prior approval of the Government undertake tours within India for carrying out the functions of the Board.

(ii) With the prior approval of the Government, visit any foreign country for carrying out the functions of the Board.

(3) The Chairman shall have power to accord administrative and financial sanction to all estimates without any financial limit in the allocation made for such purposes in the budget of the Board.

(4) In the matter of acceptance of tenders, the Chairman shall have full powers without any monetary limit.

16. Powers and duties of the Member Secretary.— The Member Secretary shall be subordinate to the Chairman and shall, subject to the control of the Chairman, exercise the following powers, namely:—

(i) the Member Secretary may undertake tours within India for the performance of duties entrusted to him by the Board provided that he shall keep the Chairman informed of his tours and obtain the previous permission from the Board for his tours outside the State of Goa.

(ii) the Member Secretary shall be in charge of all the confidential papers of the Board and shall be responsible for preserving them.

(iii) the Member Secretary shall produce such papers whenever so directed by the Chairman or by the Board.

(iv) the Member Secretary shall make available to any member of the Board, for his perusal, any record of the Board.

(v) the Member Secretary shall be entitled to issue any direction to any officer or employee of the Board, and call at any time, any file, paper and document, from any section/department of the Board, for checking of accounts, vouchers, bills and other records and stores pertaining to the Board or regional offices there under.

(vi) the Member Secretary may withhold any payment, provided that as soon as may be after such withholding of payment the matter shall be placed before the Board for its approval.

(vii) the Member Secretary shall make all arrangements for holding meetings of the Board and meetings of the committees constituted by the Board.

(viii) all orders, instructions, directions, notices, communications, consents, authorizations or registrations to be issued by the Board shall be under the signature of the Member Secretary or of any other Officer authorized in this behalf by the Chairman or the Board.

2715 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(ix) the Member Secretary shall be authorized to sanction or pass and make all payments against estimates sanctioned, within the allocations made for such purposes in the budget approved by the Board.

(x) the Member Secretary shall write and maintain confidential repor ts of all subordinate officers of the Board and shall get them countersigned by the Chairman.

(xi) (a) the Member Secretary shall sanction the annual increments of the officers of the Board subordinate to him.

(b) the annual increments of officers which the Member Secretary is not competent to sanction shall be sanctioned by the Chairman.

(xii) the Member Secretary shall have full power for according technical sanction to all estimates.

(xiii) the Member Secretar y shall exercise such other powers and perform such other functions as may be delegated to him from time to time either by the Board or by the Chairman.

(xiv) the Member Secretary shall have power to execute contract, deed, instrument and assurance of property and in particular (a) all service agreements (b) security bonds (c) conveyance, lease of immovable property and, (d) assurances required by law or otherwise.

(xv) the Member Secretary shall have power to engage legal advisors, Advocates, Attorneys on the terms and conditions to be approved by the Board.

(xvi) the Member Secretary or any other Officer authorized by the Chairman or the Board shall have power to make and give receipts in respect of the claims of and demands on the Board.

(xvii) the Member Secretary shall have power to purchase materials and equipments for execution of construction works up to a limit of the allotments made from time to time.

(xviii) the Member Secretary shall have power to sanction installation of telephones/broadband/internet connections, etc. in the office of the Board.

17. Appointment of Consultant.— (1) For the purpose of assisting the Board in the performance of its functions, it may appoint a Consultant for a specified period not exceeding one year:

Provided that the Board may, with the prior approval of the Government extend the period of such appointment from time to time:

Provided further that if at the time of the initial appointment, the Board had reason to believe that the services of the Consultant would be required for a period of more than one year, the Board shall not make the appointment without the prior approval of the Government.

a. The Board may pay such emoluments or fees to the Consultant depending on the nature of work and his qualifications and experience:

Provided that the Board shall not appoint any person as Consultant without the prior approval of the Government, if the emoluments or fees payable to him exceeds Rs. 1,00,000/- (Rupees one lakh only) per month.

18. Power to terminate appointment.— Notwithstanding the appointment of a Consultant for a specified period, the Board shall have the right to terminate the services of the Consultant before the expiry of the specified period, if in the opinion of the Board, he is not discharging his duties to the satisfaction of the Board or if such a course of action is necessary in the public interest.

19. Tours by Consultant.— The Consultant may undertake tours within the State of Goa with prior approval of the Chairman for the2716 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 performance of the duties entrusted to him by the Board and in respect of such tours, he shall be entitled for travelling and daily allowances as admissible to Grade I Officer of the Government.

20. Consultant not to disclose information.— The Consultant shall not disclose any information either given by the Board or obtained during the performance of the duties assigned to him either from the Board or otherwise, to any other person without the written permission of the Board.

21. Duties and functions of the Consultant.— The Consultant shall discharge such duties and perform such functions as are assigned to him, by the Board and he shall be duty bound to advise the Board on all technical matters referred to him by the Board.

22. Form of notice.— The notice referred in clause (a) of sub-section (3) of section 26 shall be made in Form I hereto.

23. Form of Report of the Board Analyst.— The report referred in sub-section (1) of section 27 of the Act shall be in Form II hereto and submitted in triplicate.

24. Form for submission of sample to State Air Laboratory and report of the Government Analyst.— The submission of the sample of air or emission shall be sent for analysis under section 26 of the Act to the State Air Laboratory by a letter in Form III hereto. The report referred in sub-section (3) of section 27 of the Act shall be in Form IV hereto and submitted in triplicate.

25. Application for consent of the Board.— (1) The application referred in sub-section (2) of section 21, shall be made online on the website of the Board at www.goapcb.gov.in as applicable and it shall be accompanied by,—

(a) a certificate from the Chartered Accountant in Form V hereto which shall include value of leasehold land, building and premises and value of hired plant, machinery and equipment;

(b) land allotment/earmarking letter or

lease/sale deed;

(c) flow chart and detailed production

process;

(d) copy of Project Report for projects

costing 5 crores and above;

(e) site Plan (not required for units to be

set up in Industrial Estates);

(f) layout plan showing the locations of Manufacturing equipment, water supply/ drainage lines, position of Chimneys, effluent/sewage treatment plant and final discharge point, sludge solid waste disposal points and septic tank/soak pits;

(g) Detailed material balance, water balance for Industries categorised under Red and Orange and large scale Industries under green category;

(h) for large enterprises covered under the Schedule of Environment Impact Assessment Notification, 2006 as amended from time to time, copy of the Environment Impact Assessment Study Report.

(i) copy of the prior Environment Clearance issued by the competent Authority as applicable for projects listed in the Environment Impact Assessment Notification, 2006 as amended from time to time.

(j) site plan showing surrounding residential area, public places, water streams, etc. of the proposed factory/ operation/process/mine/quarry site within a radius of five Kilometers with Waste water treatment and disposal systems clearly indicating where waste water is proposed to be disposed off after treatment (for medium and large scale enterprises)

(k) schematic sketch of the proposed Effluent/sewage treatment system/plant2717 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 (ETP/STP) and or septic tank or soakpits duly signed by Authorised person along with detailed design calculation as applicable.

(l) original Authorisation letter of the person to whom authorisation is made to sign this application form except individual proprietary concern.

(m) any other document/clarification as

requisitioned by the Board.

(n) fees as specified in the Table 1(A), 1(B) and 1(C) of Schedule I appended hereto as applicable, to the respective category of industry.

(2) An application without requisite fee

shall not be entertained by the Board.

(3) The fees shall be paid by a bank draft or NEFT/RTGS or NET Banking in favour of the Board.

(4) The Consent to Establish issued by the Board shall be valid for a period of five years from the date of issue.

(5) The Categorization of Industries/ establishments as Red, Orange, Green category shall be as specified in Table 3 annexed herewith.

(6) When any industry, operation, process, treatment/disposal system or/and extension/ addition thereto is established, an application for consent to operate/renewal of Consent to Operate under sub-section (2) of section 21 of the Act shall be made online on the website of the Board www.goapcb.gov.in as applicable to the respective category of industry, operation or process at least two months prior to the scheduled date of commencing operation, and shall be accompanied by,—

(a) a certificate from the Chartered Accountant as specified in Form V which shall also include value of leasehold land, building and premises and value of hired plant, machinery and equipment;

(b) copy of the previous Consent issued

by the Board.

(c) stack analysis report/analysis report of treated effluent/sewage wherever applicable.

(d) any changes/modifications carried out in the Industry/operation or process after obtaining previous Consent;

(e) in case of Renewal of Orange and Green Category Industry, application for Auto Renewal to be accompanied by an Affidavit as specified at Annexure 'B' in SCHEDULE I hereto;

(f) fees as specified in the Table 2(A), 2(B) or 2(C) of Schedule I as applicable to the respective category of industry;

(g) an application without requisite fees

shall not be entertained by the Board;

(h) the fees referred herein shall be paid by a bank draft or NEFT/RTGS or NET Banking in favour of the Goa State Pollution Control Board;

(i) the Validity of Consent to Operate and renewal of Consent to Operate shall normally be five years for Red category, ten years for orange category and fifteen years for green categor y industr y, operation or process;

(j) an application for renewal of consent to operate submitted upon expiry of the validity period shall also be accompanied by late fees equivalent to 50% of the fees payable for renewal.

26. Manner of enquiry in respect of application for consent.— (1) On receipt of an application for consent under section 21 of the Act, the Board may depute any of its officers, accompanied by as many assistants as may be necessary, to visit the premises of the applicant, to which such application relates for the purpose of verifying the correctness or otherwise of the particulars furnished in the application or for obtaining2718 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 such further particulars or information as the Board may consider necessary as specified under sections 23, 24 and 25 of the Act. Such officer may, for that purpose, inspect any place where air emissions or air pollutant are discharged by the applicant or air pollution control equipments and measures and may require the applicant to furnish to him any plan, specification and other data relating to such air pollution control equipments and measures, systems or any part thereof, he considers necessary.

(2) Such officer shall before visiting any premises of the applicant for the purpose of inspection under sub-rule (1), give notice to the applicant of his intention to do so in Form VI hereto. The applicant shall furnish to such officer all facilities that such officer may legitimately require for the purpose.

(3) An officer of the Board may, before or after carrying out an inspection under sub- -rule (1), require the applicant to furnish to him, orally or in writing such additional information or clarification, or to produce before him such documents, as he may consider necessary and may, for that purpose, summon the applicant or his authorized agent to the office of the Board.

(4) The Board shall conduct air quality monitoring of such units under sub-section (3) of section 21 and section 26 of the Act and shall levy such fees as specified by the Board from time to time.

(5) The Board shall conduct environmental audit under sub-section (3) of section 21 of the Act through an Environmental Auditor or Engineering/Scientific Institutions or Officials of the Board upon submission of Environmental Statement by the industry/ /Organization and shall follow such procedure as specified in SCHEDULE II hereto.

(6) The Board shall constitute an Environmental Audit Committee comprising of such members as specified in SCHEDULE II hereto.

(7) The tenure of the Environmental Audit

committee shall be for a period of 5 year.

(8) For the purpose of carrying out Environmental Audit the Board shall levy fees as per actual expenses incurred by the Board for conducting the Environmental Audit plus 25 percent administrative charges.

(9) The Board shall Empanel Environment Auditors by following such procedures as specified in SCHEDULE II hereto;

(10) The Institutions/Agencies/Professionals /Individuals eligible for Empanelment as Environment Auditor with the Board shall be as specified in SCHEDULE II hereto.

(11) The Environment Audit Committee shall review the Environment Audit Report submitted by the Environment Auditors and recommend such actions as specified in SCHEDULE II hereto;

(12) The Environment Audit Committee

shall meet at least once in 3 months;

(13) The Empanelled Auditor shall conduct an Environment Audit as per the procedure and submit a Repor t as specified in SCHEDULE II hereto;

(14) The fee to be paid to the Empanelled Environment Auditor shall be in SCHEDULE II hereto.

27. Form of budget.— (1) Before the last day of the preceding financial year, the budget in respect of the ensuing year showing the estimated receipts and expenditure of the Board shall be prepared under section 34 of the Act in Form VII hereto;

(2) The estimated receipts and expenditure shall be accompanied by the revised budget estimates for the current year;

(3) The budget shall, as far as may be, based on the account heads specified in SCHEDULE III hereto.

28. Submission of budget estimates to the Board.— (1) The budget estimates shall be placed by the Member Secretary before the Board by the 5th October each year for approval.

2719 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(2) After approval of the budget estimates by the Board, four copies of the final budget proposals incorporating therein such modifications as have been decided upon by the Board shall be submitted to the Government by the 15th October each year.

29. Estimates of establishment expenditure and fixed recurring charges.— The estimates of expenditure on fixed establishment as well as fixed monthly recurring charges on account of rent, allowances, etc. shall provide for the gross amount without deductions of any kind.

30. Re-appropriations and emergent expenditure.— No expenditure which is not covered by a provision in the sanctioned budget estimates or which is likely to be in excess over the amount provided under any head, shall be incurred without the approval of the Board and by the Board without provision being made for re-appropriation from some other head, under which savings are firmly established and available.

31. Power to incur expenditure.— The Member Secretary shall have power to incur expenditure against allotments made in the budget estimates sanctioned by the Board and against sanctioned estimates out of the funds of the Board subject to observance of the general financial rules for the purposes of procedure.

32. Operation of fund of the Board.— The fund of the Board shall be operated by the Member Secretary of the Board and in his absence by any officer of the Board duly authorized by the Board in that behalf. The Board shall create and maintain a Corpus Fund.

33. Form of annual report.— The annual report referred in sub-section (2) of section 35 of the Act shall be in form VIII-hereto.

34. Form of annual statement of accounts of the Board.— The annual statement of accounts of the Board referred in sub-section (1) of section 36 shall be in Forms IX, X, XI, XII and XIII hereto.

35. Audit of the annual statement of Account.— The annual statement of account of the Board shall be audited by an Auditor appointed by the Government for the purpose in consultation with the Office of the Comptroller and Auditor General in Goa.

36. Directions of the Government.— The Board shall comply with the directions issued by Government from time to time.

37. Repeal and savings.— (1) The Goa Air (Prevention and Control of Pollution) Rules, 1989 are hereby repealed.

(2) Notwithstanding such repeal any action taken or order issued under the provisions of the said repealed Rules prior to the commencement of these Rules shall, in so far as it is not inconsistent with the provisions of these Rules, be deemed to have been taken or issued under the provisions of these Rules.

By order and in the name of the Governor

of Goa.

Dasharath M. Redkar, Director (Envt.) ex

officio Jt. Secretary.

Panaji, 17th December, 2021.

______

FORM I

THE GOA STATE POLLUTION CONTROL

BOARD

Notice of intention to have sample analysed

(See rule 22)

To,

Take notice that it is intended to have analyzed the sample of air emissions/flue gas emissions/ /ambient monitoring/emissions which is being taken today the ... day of ... 20... from (†) ...

Name and designation of the person who takes

the sample.

(t) Here specify the stream, well, plant, or place

from where the sample is taken.

______

FORM II

Report by the Board Analyst

[See rule 23]

Report No. ...

Dated the ... 20...

I hereby certify that I, (*) ... Board Analyst duly appointed under sub-section (2) of section 29 of the2720 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 Air (Prevention and Control of Pollution) Act, 1981 (Act 14 of 1981), received on the (†) ... day of ... 20... ( ‡) ... a sample of ... for analysis. The sample was in a condition fit for analysis reported below:—

I further certify that I have analysed the aforementioned sample on (§) ... and declare the result of the analysis to be as follows—

($) ...

The condition of the seals fastening and

container on receipt was as follows:—

Signed this ... day of ... 20...

Address ...

(Signed)

Board Analyst

To

………..

………..

(*) Here write the full name of the Board Analyst.

(†) Here write the date of receipt of the sample.

(‡) Here write the name of the Board or person or body of persons or Officer from whom the sample was received.

(§) Here write the date of analysis.

($) Here write the details of the analysis and refer to the method of analysis. If the space is not adequate the details may be given on a separate sheet of paper.

______

FORM III

Form of letter for submission of samples to the State Air Laboratory [See rule 24]

To, The Government Analyst, State Air Laboratory.

Sir,

I am submitting sample No./Nos. …. of air emis- sions taken from M/s……. on……… according to the provisions of section 54 of the Air (Prevention and Control of Pollution) Act, 1981 (Central Act 14 of 1981).

Sample Point of Parameters to be

No. collection analyzed ..................... ......................... ................................. ..................... ......................... ................................. ..................... ......................... .................................

Yours faithfully,

(Signature of the officer taking sample)

Designation:—

Copy forwarded to the Member Secretary, Goa State Pollution Control Board,

.............................................................

(Name and signature of the officer taking sample)]

FORM IV

Report by the Government Analyst

[See rule 24]

Report No. ...

Dated the ... 20...

I hereby certify that I, (*) ... Government Analyst duly appointed under sub-section (1) of section 29 of the Air (Prevention and Control of Pollution) Act, 1981 (Act 14 of 1981) received on the (†) ... day of ... 20... from (‡) ... a sample of ... for analysis. The sample was in a condition fit for analysis reported below:—

I further certify that I have analysed the aforementioned sample on (§) ... and declare the result of the analysis to be as follows:—

($) .....

.....

.....

Signed this ... day of ... 20...

Address ...

(Signature)

Government Analyst

To

………..……..……..……..…….. …………..……..……..…………

(*) Here write the full name of the Government

Analyst.

(†) Here write the date of receipt of the sample.

2721 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(‡) Here write the name of the Board or person or body of persons or Officer from whom the sample was received.

(§) Here write the date of analysis.

($) Here write the details of the analysis and refer to the method of analysis. If the space is not adequate the details may be given on a separate sheet of paper.

______

FORM V

(Form of the certificate of the Chartered

Accountant without appreciation and depreciation)

[See rule 25(1)(a)]

I, Shri. _____________________________________

Son/daughter of _________________________, aged ________years, Indian National, resident of ____________________________________, hereby solemnly declare an oath as follows.

1. I say that I am the Proprietor/Director/ Authorized Signatory of M/s. ___________________ located at ________________________, Goa.

2. I say that the Gross Fixed Asset Value/Gross Estimated Value (in case of NOC) of our unit is as follows (including the value of lease/hold land, building and premises and value of hired plant, machinery and equipment)

a. Land_________________________

b. Building_________________________

c. Plant & Machinery_________________

d. Other fixed assets_________________

Total ______________________

(Rupees _____________________________)

3. I say that I am filing this Certificate for the limited purpose of producing it before the Board for obtaining Consent.

Solemnly affirmed at ________________

Dated ______________________

Deponent Name & Signature Note: Kindly note that application form should be invariably submitted by only authorized person on behalf of the unit"

______

FORM VI

THE GOA STATE POLLUTION CONTROL BOARD

Notice of Inspection [See rule 26(2)]

Chairman

Member Secretary…………….

Shri……………………………..

No. ……………………………..

Dated……………………………

………………………………….

………………………………….

To,

Take Notice that for the purpose of enquiry under section 21 the following officers of the State Board namely;—

i. Shri ……………………………………

ii. Shri ……………………………………

iii. Shri ……………………………………

and the persons authorized by the Board to assist

them shall inspect—

Any systems of your Industrial Plant.

Any other parts thereof or pertaining thereto under management/control of date (a) …………………………… between …………………………. hours when all facilities requested by them for such inspection should be made available to them on the site. Take Notice that refusal or denial to above stated demand made under the functions of the State Board shall amount to obstruction punishable under section 37(1) of the Act.

By order of the Board Member Secretary

Copy to:

1. ………………………..

2. ………………………..

3. ………………………..

2722 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM VII

THE GOA STATE POLLUTION CONTROL BOARD

(cid:39)(cid:72)(cid:87)(cid:68)(cid:76)(cid:79)(cid:72)(cid:71)(cid:3)(cid:37)(cid:88)(cid:71)(cid:74)(cid:72)(cid:87)(cid:3)(cid:40)(cid:86)(cid:87)(cid:76)(cid:80)(cid:68)(cid:87)(cid:72)(cid:86)(cid:3)(cid:73)(cid:82)(cid:85)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:92)(cid:72)(cid:68)(cid:85)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)

[See rule 27(1)]

ADMINISTRATION

(Expenditure)

Head of Account Actuals for the past three years current year Sanctioned Estimate for the i.e. year Actuals for last six months of the current year Actuals for last six months current year Revised Estimate for the next year Budget Estimate for the column 5 and 8 Variations between column 8 and 9 Variations between Explanation for columns 10-11
1 2 3 4 5 6 7 8 9 10 11 12

Accounts Officer/Accountant

_______

FORM VIII

The GOA STATE POLLUTION CONTROL BOARD

(cid:36)(cid:81)(cid:81)(cid:88)(cid:68)(cid:79)(cid:3)(cid:53)(cid:72)(cid:83)(cid:82)(cid:85)(cid:87)(cid:3)(cid:73)(cid:82)(cid:85)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:41)(cid:76)(cid:81)(cid:68)(cid:81)(cid:70)(cid:76)(cid:68)(cid:79)(cid:3)(cid:92)(cid:72)(cid:68)(cid:85)(cid:3)(cid:36)(cid:83)(cid:85)(cid:76)(cid:79)(cid:3)(cid:21)(cid:19)(cid:171)(cid:17)(cid:3)(cid:55)(cid:82)(cid:3)(cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)

(See rule 33)

1. Introductory.

2. Constitution of the Board including changes therein.

3. Constitution of Committees by Board and Meetings of the Committees constituted by it.

4. Meetings of the Board.

5. Activities of the Board including the various functions performed under Section 1 of the Act. 6. Prosecutions launched and convictions secured.

7. Finance and Accounts of the Board.

8. Visits to the Board by Experts, important persons etc.

9. Any other important matter dealt with by the Board.

2723 1 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM IX

THE GOA STATE POLLUTION CONTROL BOARD

(cid:53)(cid:72)(cid:70)(cid:72)(cid:76)(cid:83)(cid:87)(cid:86)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:83)(cid:68)(cid:92)(cid:80)(cid:72)(cid:81)(cid:87)(cid:86)(cid:3)(cid:73)(cid:82)(cid:85)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:92)(cid:72)(cid:68)(cid:85)(cid:3)(cid:72)(cid:81)(cid:71)(cid:72)(cid:71)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)

(See rule 34)

Previous year Receipts Previous year Payments
(1) (2) (3) (4)
Opening Balance -------- 1. Capital expenditure
Grants received: (i) Works ""
(a) From Government "" (ii) Fixed Assets ""
(b) From other agencies "" (iii) Other Assets: ""
ii. Fees "" (a) Laboratory equipments ""
iii. Fines and Forfeitures "" (b) Vehicles ""
iv. Interest on Investment "" (c) Furniture & Fixtures ""
v. Miscellaneous receipts "" (d) Scientific Instruments and Office appliances ""
vi. Miscellaneous Advances "" (e) Tools and Plant ""
vii. Deposits "" (23) Revenue Expenditure
A. Administrative:
(i) Salaries ""
(ii) Travelling Allowance :
a) Chairman ""
b) Members ""
c) Others ""
(iii) Leave salary and pension contributions ""
(iv) Office expenditure ""
B. (i) Board Laboratory ""
(i) Charges to be paid to State Government Analyst Laboratory ""
C. Running and Maintenance of Vehicles ""
D. Maintenance and Repairs:
(i) Buildings ""
(ii) Works ""
(iii) Furniture and Fixture ""
(iv) Scientific Instruments and office appliances ""
(v) Tools and plants
(1) (2) (3) (4)
E. Fees to consultants and Specialist ""
F. Law Charges ""
G. Miscellaneous ""
H. Fees for Audit ""
3. Purchases ""
4. Miscellaneous ""
5. Advances ""
6. Deposits ""
Closing Balance ""
Total Total ""
Accounts Officer/Accountant Member Secretary Chairman
2724 2 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

_______

FORM X

THE GOA STATE POLLUTION CONTROL BOARD

Expenditure on works as on 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)(cid:17)

(Item I (cid:178) Assets of the Balance Sheet)

(See rule 34)

Upto 31st March " 'XULQJWKH\HDU"" Upto 31st March ""
Sr. No. Name of the work Direct expenditure Overhead Charges Total expenditure Direct expenditure Overhead Charges Total expenditure Direct expenditure Overhead Charges Total expenditure
T otal-----------------------------------------------------------------------------------
A ccounts Officer/Accountant Member Secretary Chairman
2725 3 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM XI

THE GOA STATE POLLUTION CONTROL BOARD

ANNUAL STATEMENT OF ACCOUNTS

Fixed Assets as on works as on 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)(cid:17)

(Item 2 (cid:178) Assets of the Balance Sheet)

Other Assets as on 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)

(Item 3 (cid:178) Assets of the Balance Sheet)

(See rule 34)

Sr. No. Particulars of Assets Balance as on 31st March " Additions during the year Total Depreciation during the year Sales or write off during the year Balance as on 31st March " Cumulative depreciation as on 31st 0DUFK"
Accounts Officer/Accountant Member Chairman Secretary

________

FORM XII

THE GOA STATE POLLUTION CONTROL BOARD

ANNUAL STATEMENT OF ACCOUNT

Income and expenditure accounts for year ended 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:171)(cid:171)(cid:17)

(See rule 34)

Expenditure Income
Previous year Details Total of sub-head Total of Major head Previous year Details Total of sub-head Total of Major head
(1) (2) (3) (4) (5) (6) (7) (8)
Rs.
To By
Revenue expenditure I. Grants received
(A) Administrative (a) From Government
(i) Salaries (b) From other agencies
(ii) Travelling allowances Total
(iii) Leave salary and pension contributions Less:
(1) (2) (3) (4) (5) (6) (7) (8)
(iv) %RDUG·s contribution to the staff provident fund . Amount utilized for Capital expenditure. Net grant available for Revenue expenditure.
(v) Contingent expenditure
(B) Running expenses of laboratories: (i) Main laboratory (ii) Payments to be made to the State Government Analyst laboratory II Fees III Service rental charges IV Fines and forfeitures V Interest on investments
(C) Running and maintenance of vehicles VI Miscellaneous receipts
(D) maintenance and Repairs (i) Building and Land (ii) Drainage Works (iii) Furniture and Fixtures (iv) Scientific Instruments and office appliances (v) Tools and Plant VII Excess of expenditure over income
(E) Fees to consultants and specialists
(F) Law Charges
(G) Depreciation : (i) Buildins (ii) Laboratory equipment (iii) Vehicles (iv) Furniture and Fixtures (v) Scientific instruments and office appliances (vi) Tools and Plants
(H) Miscellaneous (i) Write off losses (as per details in the statement attached). (ii) Other Miscellaneous expenditure.
(I) Fees for Audit
(J) Excess of Income over expenditure
TOTAL
2726 4 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

Accounts Officer/Accountant Member Secretary2727 5 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

FORM XIII

THE GOA STATE POLLUTION CONTROL BOARD

ANNUAL STATEMENT OF ACCOUNTS

Balance sheet as at 31st (cid:48)(cid:68)(cid:85)(cid:70)(cid:75)(cid:3)(cid:21)(cid:19)(cid:171)(cid:17)(cid:17)

(See rule 34)

Capital and Liabilities Property and Assets
Previous year Details Total of sub-head Total of Major head Previous year Details Total of sub-head Total of Major head
(1) (2) (3) (4) (5) (6) (7) (8)
(A) Capital Fund (i) Grants received from Government for Capital Expenditure (a) Amount utilized upto 31st 0DUFK" ( ii) Grant from other agencies for Capital expenditure (a) Amount utilized upto 31st 0DUFK" (b) Unutilized balance to 31st 0DUFK" (iii) Value of land provided by Govt. (Per contra) 1. Works--- (as per Form XI) 2. Fixed Assets (As per Form XII) (a) Value of land provided by Govt. (at cost) (b) Buildings³ Balance as per last Balance Sheets Additions during the year - ---
(B) Capital Receipts Total ----
(c) (i) Deposits received for works from outside bodies Deposits Less Expenditure ---- (ii) Other deposit 3. Other Assets------ ( As per Form XII) (a) Laboratory Equipment as per last balance sheet additions during the year Total Less depreciation during the year Total - ----
- ----
- ----
- ----
(1) (2) (3) (4) (5) (6) (7) (8)
(D) Amounts due----- (i) Purchases (ii) Others (b) Vehicles as per last balance sheet Addition during the year - ----
Total - ----
Less Depreciation during the year - ----
Total - ----
(E) Excess of income over expenditure : (i) Up to 31st March " (ii) Add for the year (iii) Deduct --- Excess of expenditure over income (c) Furniture and fixtures as per last Balance Sheet Additions during the year
Total - ----
Less Depreciation during the year - ----
Total - ----
(d) Scientific Instruments and Office Appliances ---- - As per last Balance Sheet Additions during the year Total - ----
- ----
- ----
(e) Tools and Plants ------ A s per last Balance Sheet Additions during the year Total Less Depreciation during the year Total - ----
- ----
- ----
- ----
(1) (2) (3) (4) (5) (6) (7)
4. Sundry Debtors (i) Amounts due from out site bodies for expenditure incurred----- Expenditure Less Amount received ( ii) Other sundry Debtors
5. Advances------- ( a) Miscellaneous Advances (b) Other amount recoverable Cash----- (c) Notice/ShortTerm Deposits (d) Cash at Bank (e) Cash at Hand (f) Cash in transit - ----
Total Total -----
Accounts Officer/Accountant Member Secretary Chairman
2728 6 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2729 7 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

SCHEDULE I

[See Rule 25]

I An Application for CONSENT TO ESTABLISH, -

(i) A Green Category Industry shall be accompanied by Fee as specified in Table 1(A) below;

(ii) An Orange Category Industry shall be accompanied by Fee as specified in Table 1 (B) below;

(iii) A Red Category Industry shall be accompanied by Fee as specified in Table 1(C) below.

II An application for CONSENT TO OPERATE;-

(i) RED Category Industry (Large, Medium and Small scale) shall be accompanied by Fees as specified in Table 2 (A) below.

(ii) ORANGE Category Industry (Large, Medium and Small scale) shall be accompanied by Fees as specified in Table 2(B) below.

(iii) GREEN Category Industry (Large, Medium and Small scale) shall be accompanied by Fee as specified in Table 2(C) below2730 8 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

Table 1

TOTAL ESTIMATED INVESTMENT (TEI) (Rs. In Lakhs) FEE FOR CONSENT TO ESTABLISH (In Rupees)
Fee ( 5years) Fee ( per year)
1 350 70
1-up to 2 700 140
2- up to 3 1000 200
3 - up to 4 1350 270
4 - up to 5 1700 340
5 - up to 6 2000 400
6 - up to 7 2350 470
7 - up to 8 2700 540
8 - up to 9 3000 600
9 - up to 10 3350 670
10 - up to 15 4000 800
15 - up to 20 4700 940
20 - up to 25 5350 1070
25 - up to 35 6700 1340
35 - up to 45 8000 1600
45 - up to 55 9350 1870
55 - up to 65 10700 2140
65 - up to 75 12000 2400
75 - up to 100 13350 2670
100 - up to 500 17350 3470
500 - up to 1000 21350 4270
1000 ² up to 2000 25350 5070
2000 ² up to 3000 33700 6740
3000 ² up to 4000 42000 8400
4000 ² up to 5000 50350 10070
5000 ² up to 10000 75350 15070
10000 ² up to 20000 100350 20070

Note: Also 3% increase in the above fees for every subsequent financial year.

2731 9 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

Table 2 (A)

Renewal/Consent to operate Red category (L) Red Category (M) Red Category (S)
Per year
1 500 500 200
1-up to 2 1000 1000 400
2- up to 3 1500 1500 600
3 - up to 4 2000 2000 800
4 - up to 5 2500 2500 1000
5 - up to 6 3000 3000 1200
6 - up to 7 3500 3500 1400
7 - up to 8 4000 4000 1600
8 - up to 9 4500 4500 1800
9 - up to 10 5000 5000 2000
10 - up to 15 6000 6000 2400
15 - up to 20 7000 7000 2800
20 - up to 25 8000 8000 3200
25 - up to 35 9500 9500 3800
35 - up to 45 11000 11000 4400
45 - up to 55 12500 12500 5000
55 - up to 65 14000 14000 5600
65 - up to 75 15500 15500 6200
75 - up to 100 17000 17000 6800
100 - up to 500 22000 22000 8800
500 - up to 1000 27000 27000 10800
1000 ² up to 2000 37000 37000 14800
2000 ² up to 3000 47000 47000 18800
3000 ² up to 4000 57000 57000 22800
4000 ² up to 5000 67000 67000 26800
5000 ² up to 10000 97000 97000 38800
10000 ² up to 20000 127000 127000 50800

*Note: An application for renewal of Consent submitted after expiry of the validity shall accompany with penalty of 50% of the Consent fees in addition to the prescribed consent fees. Also 2% increase in the above fees for every subsequent financial year.

2732 10 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
Table 2 (B)
Renewal/Consent to operate Orange category (L) Orange category (M) Orange category (S)
Per year
1 350 350 150
1-up to 2 700 700 300
2- up to 3 1000 1000 450
3 - up to 4 1350 1350 600
4 - up to 5 1700 1700 750
5 - up to 6 2000 2000 900
6 - up to 7 2350 2350 1000
7 - up to 8 2700 2700 1200
8 - up to 9 3000 3000 1300
9 - up to 10 3350 3350 1450
10 - up to 15 4000 4000 1750
15 - up to 20 4700 4700 2000
20 - up to 25 5350 5350 2300
25 - up to 35 6350 6350 2800
35 - up to 45 7350 7350 3150
45 - up to 55 8350 8350 3600
55 - up to 65 9350 9350 4000
65 - up to 75 10350 10350 4450
75 - up to 100 11350 11350 4900
100 - up to 500 14700 14700 14700
500 - up to 1000 18000 18000 7750
1000 ² up to 2000 24700 24700 10600
2000 ² up to 3000 31350 31350 13450
3000 ² up to 4000 38000 38000 16300
4000 ² up to 5000 44700 44700 19150
5000 ² up to 10000 64700 64700 27750
10000 ² up to 20000 84700 84700 36300

*Note: An application for renewal of Consent submitted after expiry of the validity shall accompany with penalty of 50% of the Consent fees in addition to the prescribed consent fees. Also 2% increase in the above fees for every subsequent financial year.

2733 11 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021
Table 2 (C)
Renewal/Consent to operate Green category (L) Green category (M) Green category (S)
Per year
1 200 200 100
1 - up to 2 400 400 200
2 - up to 3 600 600 300
3 - up to 4 800 800 400
4 - up to 5 1000 1000 500
5 - up to 6 1200 1200 600
6 - up to 7 1400 1400 700
7 - up to 8 1600 1600 800
8 - up to 9 1800 1800 900
9 - up to 10 2000 2000 1000
10 - up to 15 2400 2400 1200
15 - up to 20 2800 2800 1400
20 - up to 25 3200 3200 1600
25 - up to 35 3800 3800 1900
35 - up to 45 4400 4400 2200
45 - up to 55 5000 5000 2500
55 - up to 65 5600 5600 2800
65 - up to 75 6200 6200 3100
75 - up to 100 6800 6800 3400
100 - up to 500 8800 8800 4400
500 - up to 1000 10800 10800 5400
1000 ² up to 2000 14800 14800 7400
2000 ² up to 3000 18800 18800 9400
3000 ² up to 4000 22800 22800 11400
4000 ² up to 5000 26800 26800 13400
5000 ² up to 10000 38800 38800 19400
10000 ² up to 20000 50800 50800 25400

Note: Also 2% increase in the above fees for every subsequent financial year.

2734 12 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(cid:36)(cid:49)(cid:49)(cid:40)(cid:59)(cid:56)(cid:53)(cid:40)(cid:3)(cid:182)(cid:36)(cid:183)

Table 3

(See rule 25(5))

Categorization of Industries

RED CATEGORY

Sr. No.

Category

1 2
1 Airports and Commercial Air Strips with overall waste water generation > 100KLD
2 Aluminium Smelter
3 Asbestos and asbestos based industries
4 Automobile Manufacturing (integrated facilities)
5 Basic chemicals and electro chemicals and its derivatives including manufacturing of acid
6 %XLOGLQJDQGFRQVWUXFWLRQSURMHFWVKDYLQJZDVWHZDWHUJHQHUDWLRQ•./'
7 Cement
8 Chlor Alkali
9 Chlorates, per-chlorates & peroxides
10 Chlorine, fluorine, bromine, iodine and their compounds
11 Coke making , liquefaction, coal tar distillation or fuel gas making
12 Common treatment and disposal facilities (CETP, TSDF,CBMWTF, effluent conveyance project, incinerator, MSW sanitary landfill site)
13 Compressed Biogas (CBG)/Bio-CNG plants CBG plants based on Municipal Solid Waste (MSW) WWG is more than 100KLD
14 Compressed Biogas (CBG)/Bio-CNG plants CBG plants based on process waste (industrial/process liquid effluent & solid waste like press mud, organic sludge, molasses etc. WWG is more than 100KLD
15 Copper Smelter
16 DG Set of capacity > 5 MVA
17 Distillery ( molasses/grain/yeast based)
18 Dyes and Dye- Intermediates
19 Fertilizer (basic) (excluding formulation)
20 Fibre glass production and processing (excluding moulding)
21 Fire crackers manufacturing and bulk storage facilities
22 Health Care establishments (as defined in Bio-Medical Management Waste Rules, 2016 as amended from time to time) with overall waste water generation >100KLD
23 Hotel having overall wastewater generation @100KLD and more
24 Industrial carbon including electrodes and graphite blocks, activated carbon, carbon black
25 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely²Spent catalyst containing nickel, cadmium, Zinc, copper, arsenic, vanadium and cobalt,
26 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Dismantlers Recycling Plants-Components of waste electrical and electronic assembles comprising accumulators and other batteries included on list A, mercury-switches, activated glass cullets from cathode-ray tubes and other activated glass and PCB-capacitors, or any other component contaminated with Schedule 2 constituents (e.g. cadmium, mercury, lead, polychlorinated biphenyl) to an extent that they exhibit hazard characteristics indicated in part C of this Schedule.
27 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Integrated Recycling Plants -Components of waste electrical and electronic assembles comprising accumulators and other batteries included on list A, mercury- switches, activated glass cullets from cathode-ray tubes and other activated glass and PCB-capacitors, or any other component contaminated with Schedule 2 constituents (e.g. cadmium, mercury, lead, polychlorinated biphenyl) to an extent that they exhibit hazard characteristics indicated in part C of this Schedule.
28 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Lead acid battery plates and other lead scrap/ashes/residues not covered under Batteries (Management and Handling) Rules, 2001. [* Battery scrap, namely: Lead battery plates FRYHUHG E\ ,65, &RGH ZRUG ´5DLOVµ Battery lXJV FRYHUHG E\ ,65, &RGH ZRUG ´5DNHVµ. Scrap drained/dry while intact, lead batterLHVFRYHUHGE\,65,&RGHZRUG´UDLQVµ.
29 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Spent cleared metal catalyst containing copper, Spent cleared metal catalyst containing zinc,,
30 Industry having liquid waste water generation of 100KLD or more including industrial and domestic waste water
31 Industry or process involving metal surface treatment or process such as pickling/ electroplating/paint stripping/heat treatment using cyanide bath/phosphating or finishing and anodizing/enamellings/galvanizing
32 Iron & Steel (involving processing from ore/integrated steel plants) and or Sponge Iron units
33 Isolated storage of hazardous chemicals (as per schedule of manufacturing, storage of hazardous chemicals rules, 1989 as amended)
34 Lead acid battery manufacturing(excluding assembling and charging of lead-acid battery in micro scale)
35 Manufacturing of explosives, detonators, fuses including management and handling activities
36 Manufacturing of glue and gelatin
37 Manufacturing of lubricating oils, grease and petroleum based products
38 Manufacturing of paints varnishes, pigments and intermediate (excluding blending/mixing)
39 Milk processes and dairy products (integrated project)
40 Mining and ore beneficiation
41 Nuclear power plant
42 Oil and gas extraction including CBM (offshore & on-shore extraction through drilling wells)
43 Oil Refinery (mineral Oil or Petro Refineries)
44 Organic Chemicals manufacturing
45 Pesticides (technical) (excluding formulation)
46 Petrochemicals Manufacturing (including processing of Emulsions of oil and water )
47 Pharmaceuticals
48 Phosphate rock processing plant
49 Phosphorous and its compounds
50 Photographic film and its chemicals
51 Ports and harbour, jetties and dredging operations
52 Power generation plant [except Wind and Solar renewable power plants of all capacities and Mini Hydel power plant of capacity <25MW]
53 Processes involving chlorinated hydrocarbons
54 Pulp & Paper (Large-Agro + wood), Small Pulp & Paper (agro based-wheat straw/rice husk)
55 Pulp & Paper (waste paper based units with bleaching process to manufacture writing & printing paper)
56 Pulp & Paper (waste paper based without bleaching process to manufacture Kraft Paper)
57 Railway locomotive work shop/Integrated road transport workshop/Authorized service centers
58 Railway Stations (Wastewater JHQHUDWLRQ•./'
59 Ship Breaking Industries
60 Slaughter house (as per notification S.O.270(E)dated 26-03-2001)and meat processing industries, bone mill, processing of animal horn, hoofs and other body parts
61 Sugar (excluding Khandsari)
62 Synthetic fibers including rayon, tyre cord, polyester filament yarn
63 Tanneries
64 Thermal Power Plants
65 7\UHDQGWXEHVPDQXIDFWXULQJXQLW•./'ZDVWHZDWHUJHQHUDWLRQ
66 Yarn/Textile processing involving any effluent/emission generating processes including bleaching, dyeing, printing and colouring
67 Zinc Smelter
2735 13 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2736 14 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

ORANGE CATEGORY

Sr. No.

Category

1 2
1 Airport and Commercial air strips with overall waste water generation <100KLD
2 Almirah, Grill Manufacturing (Dry Mechanical Process)
3 Aluminium & copper extraction from scrap using oil fired furnace (dry process only)
4 Automobile servicing, repairing and painting (excluding only fuel dispensing)
5 Automobile servicing, repairing and painting (excluding only fuel dispensing)
6 Ayurvedic and homeopathic medicine
7 Bakery and confectionery units ( With wood fired ovens/furnaces) and electric/gas ovens > 1T/day
8 Brickfields ( excluding fly ash brick manufacturing using lime process)
9 Building and construction projects having bult-up area more than 20000sq.mt and waste ZDWHUJHQHUDWLRQ•./'
10 Cashew nut processing
11 Ceramics and Refractories
12 Chanachur and ladoo from puffed and beaten rice( muri and shira) using husk fired oven
13 Coal washeries
14 Coated electrode manufacturing
15 Coffee seed processing
16 Compact disc computer floppy and cassette manufacturing / Reel manufacturing
17 Compressed/Refined Bio-gas production from Biodegradable waste
18 CBG plants based on Municipal Solid Waste (MSW) WWG is less than 100KLD
19 CBG plants based on process waste (industrial/process liquid effluent & solid waste like press mud, organic sludge, molasses etc. WWG is less than 100KLD
20 CBG plants based on crop residue (paddy straw/wheat straw/corn sweet sorghum/napier grass etc)
21 Compressed Biogas (CBG)/Bio-CNG plants CBG plants based on animal waste (dairy farms, poultry farms and other animal) WWG is more than 100KLD
22 Construction and Demolition (C & D) watse processing plants
23 Cotton spinning and weaving (medium and large scale)
24 Dairy and dairy products (small scale)
25 Dairy Farm having 15 animals and above where milching animals (cows/buffaloes) are housed to produce milk for distribution and supply to milk processing plants
26 DG set of capacity >1MVA but < 5MVA
27 Dismantling of rolling stocks (wagons/coaches)
28 Dry cell battery (excluding manufacturing of electrodes) and assembling & charging of acid lead battery on micro scale
29 Dry coal processing, mineral processing, industries involving ore sintering, pelletisating, grinding & pulverization
30 Fermentation industry including manufacture of yeast, beer, distillation of alcohol (Extra Neutral Alcohol)
31 Ferrous and Non-ferrous metal extraction involving different furnaces through melting, refining, re-processing, casting and alloy-making
32 Fertilizer (granulation/formulation/blending only)
33 Fish feed, poultry feed and cattle feed
34 Fish processing and packing (excluding chilling of fishes)
35 Flakes from rejected PET bottle
36 Foam manufacturing
37 Food and food processing including fruits and vegetable processing
38 Forging of ferrous and non-ferrous metals (using oil and gas fired furnaces)
39 Formulation/pelletization of camphor tablets, naphthalene balls from camphor/naphthalene powders.
40 Gaushalas where weak, sick, injured, handicapped and abandoned homeless cattle/cows are housed for rehabilitation is 100KLD and more.
41 Glass ceramics, earthen potteries and tile manufacturing using oil and gas fired kilns, coating on glasses using cerium fluorides and magnesium fluoride etc.
42 Gold Assaying & Hallmarking Centres
43 Gravure printing, digital printing on flex, vinyl
44 Health Care establishments (as defined in Bio-Medical Management Waste Rules, 2016 as amended from time to time) with overall waste water generation >100KLD
45 Heat treatment using oil fired furnace ( without cyaniding)
46 Hot mix plants
47 Hotels (< 3 star) or hotels having > 20 rooms and less than 100 rooms.
48 Hotels (<3 star) or hotels having>20 rooms and less than 100 romms
49 Ice cream
50 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Brass Dross, Copper Dross, Copper Oxide Mill Scale, Copper Reverts, Cake & Residues, Waste Copper and copper alloys in dispersible form, Slags from copper processing for further processing or refining, Insulated Copper Wire, Scrap/copper with PVC sheathing including ISRI-code PDWHULDO QDPHO\ ´DruiGµ -HOO\ ILOOHG &RSSHU FDEOHV, Zinc Dross-Hot dip Galvanizers SLAB,, Zinc Dross-Bottom Dross, Zinc ash/Skimming arising from galvanizing and die casting operations, Zinc ash/Skimming/other zinc bearing wastes arising from smelting and refining, Zinc ash and residues including zinc alloy residues in dispersible from,
51 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Paint and ink Sludge/residues
52 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Used Oil-As per specifications prescribed from time to time.
53 Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under schedule iv of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 and as amended from time to time-Items namely-Waste Oil³As per specifications prescribed from time to time.
54 Industry or processes involving foundry operations
55 Jute processing without dyeing
56 Lime manufacturing (using lime kiln)
57 Liquid floor cleaner, black phenyl, liquid soap, glycerol mono-stearate manufacturing
58 Manufacturing of glass
59 Manufacturing of iodized salt from crude/ raw salt
60 Manufacturing of mirror from sheet glass
61 Manufacturing of mosquito repellent coil
62 Manufacturing of silica gel
63 Manufacturing of Starch/Sago
64 Manufacturing of tooth powder, toothpaste, talcum powder and other cosmetic items
65 Mechanized laundrt using oil fired boiler
66 Mechanized laundry using oil fired boiler
67 Modular wooden furniture from particle board, MDF< swan timber etc, Ceiling tiles/ partition board from saw dust, wood chips etc., and other agricultural waste using synthetic adhesive resin, wooden box making ( With boiler)
68 New highway construction project
69 New highway construction project
70 Non-alcoholic beverages(soft drink) & bottling of alcohol/non alcoholic products
71 Paint blending and mixing (Ball mill)
72 Paints and varnishes (mixing and blending)
73 Parboiled Rice Mills
74 Pharmaceutical formulation and for R & D purpose (For sustained release/extended release of drugs only and not for commercial purpose)
75 Ply-board manufacturing (including Veneer and laminate) with oil fired boiler/thermic fluid heater(without resin plant)
76 Potable alcohol (IMFL) by blending, bottling of alcohol products
77 Powder Coating Compound manufacturing units
78 Printing ink manufacturing
79 Printing or etching of glass sheet using hydrofluoric acid
80 Printing press
81 Producer gas plant using conventional up drift coal gasification (linked to rolling mills glass and ceramic industry refectories for dedicated fuel supply)
82 5DLOZD\6WDWLRQV :DVWHZDWHUJHQHUDWLRQ•./'EXW./'
83 Reprocessing of waste plastic including PVC
84 Rolling mill (oil or coal fired) and cold rolling mill
85 Scrapping Centres (for End of Life of Vehicles and other scraps such as plant and machineries, structural material, railway coaches and wagons etc.) a. Collection, De- Pollution, Dismantling Centres
86 Scrapping Centres (for End of Life of Vehicles and other scraps such as plant and machineries, structural material, railway coaches and wagons etc.) a. Collection, De- Pollution, Dismantling Centres and Shredding Centres
87 Scrapping Centres (for End of Life of Vehicles and other scraps such as plant and machineries, structural material, railway coaches and wagons etc.) a. Shredding Centres (can include white gooGV´IRWKHUVFUDSVDOVR 1RWH-Recyclingldisnicntling of white goods are covered under E-Waste (Management & Handing Rules, 2016. end have already been categorised in CPCS document-Classification of industrial Sector-(Feb. 2016)
88 Silk screen printing, sari printing by wooden blocks
89 Spray painting, paint baking, paint shipping
90 Steel and steel products using various furnaces like blast furnace/open hearth furnace/ /induction furnace/arc furnace/submerged arc furnace/basic oxygen furnace/hot rolling reheated furnace
91 Stone crushers
93 Stone Quarries
94 Surgical and medical products including prophylactics and latex
95 Synthetic detergents and soaps (excluding formulation)
96 Synthetic resins
97 Synthetic rubber excluding molding
98 Tephlon based products
99 Thermocol manufacturing (with boiler)
100 Thermometer manufacturing
101 Tobacco products including cigarettes and tobacco/opium processes
102 Transformer repairing/manufacturing (dry process only)
103 Tyres and tubes vulcanization/hot retreating
104 Vegetable oil manufacturing including solvent extraction and refinery/hydrogenated oils
105 Wire drawing and wire netting
2737 15 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2738 16 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2739 17 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2740 18 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

GREEN CATEGORY

1 2
1 Aluminium utensils from aluminium circles by pressing only (dry mechanical operation)
2 Assembly of antenna
3 Ayurvedic and homeopathic medicines (without boiler)
4 Bakery/confectionery/sweets products (with production capacity <1tpd (with gas or electrical oven)
5 Bi-axially oriented PP film along with metalizing operations
6 Biomass briquettes (sun drying) without using toxic hazardous wastes
7 Blending of melamine resins & different powder, additives by physical mixing
8 Brass and bell metal utensils manufacturing from circles(dry mechanical operation without re-rolling facility)
9 Building and construction projects having bult-up area less than 20000sq.mt and waste ZDWHUJHQHUDWLRQ”./'
10 Bus body building excluding painting
11 Candy
12 Cardboard or paper gated box and paper products (excluding paper or pulp manufacturing and without using boilers)
13 Carpentry & wooden furniture manufacturing (excluding saw mill) with the help of electrical (motorized) machines such as electrical wood planner, steel saw cutting circular blade, etc.
14 Catering Service other then on tiffin basis and self help groups.
15 Cement products (without using asbestos/boiler/steam curing) like pipe ,pillar, jafri, well ring, block/ tiles etc.(should be done in closed covered shed to control fugitive emissions)
16 Ceramic colour manufacturing by mixing & blending only (not using boiler and wastewater recycling process)
17 Chilling plant and ice making without using ammonia
18 Chilling plant, cold storage and ice making
19 CO2 recovery
20 Coke briquetting ( sun drying)
21 Compressed/Refined Bio-Gas Production from Bio-degradable Wastes.No waste water discharge from digester and also feed slurry to digester having Volatile Organic Fraction more than 75%.
22 Compressed Biogas (CBG)/Bio-CNG plants CBG plants based on crop residue (paddy straw/wheat straw/corn sweet sorghum/napier grass etc) WWG is less than 100KLD
23 Compressed Biogas (CBG)/Bio-CNG plants CBG plants based on animal waste (dairy farms, poultry farms and other animal waste) WWG is less than 100KLD
24 Cotton spinning and weaving (small scale)
25 Cutting, sizing and polishing of marble stone
26 Dal Mills
27 Decoration of ceramic cups and plates by electric furnace
28 Diesel generator sets (15KVA to 1MVA)
29 Digital printing on PVC clothes
30 Distilled water ( without boiler) with electricity as source of heat
31 Electrical and electronic item assembling with painting activity
32 Emery powder ( fine dust of sand) manufacturing
33 Facility of handling, storage and transportation of food grains in bulk
34 Facility of handling, storage and transportation of food grains in bulk)
36 Flour mills (dry process)
37 Flyash export, transport & disposal facilities
38 Gaushalas where weak, sick, injured, handicapped and abandoned homeless cattle/cows are housed for rehabilitation is less than 100KLD.
39 Glass, ceramic, earthen potteries, tile and tile manufacturing using electrical kiln or not involving fossil fuel kiln
40 Glue from starch (physical mixing) with gas/electrically operated oven/boiler.
41 Gold and silver smithy (purification with acid smelting operation and sulphuric acid polishing operation) (using less or equal to 1 litre of sulphuric acid/nitric acid per month)
42 Heat treatment with any of the new technology like ultrasound probe, induction hardening, ionization beam, gas carburizing etc.
43 Hotels (up to 20 rooms and without boilers) and overall waste water generation < 100KLD
44 Hotels (upto 20 rooms and without boiler)
45 Insulation and other coated papers (excluding paper or pipe manufacturing)
46 Leather foot wear and leather products (excluding tanning and hide processing except cottage scale)
47 Lubricating oil, greases or petroleum based products (only blending at normal temperature)
48 Manufacture of sanitary pads
49 Manufacturing of optical lenses (using electrical furnace)
50 Manufacturing of pasted veneers using gas fired boiler or thermic fluid heater and by sun drying
52 Marriage Halls
53 Mineral stack yard/Railway sidings
55 Mineralized water
56 Oil and gas transportation pipeline
57 Oil mill Ghani and extraction ( no hydrogenation/refining)
58 Packing materials manufacturing from non asbestos fibre, vegetable fibre yarn
59 Papad and Pickels manufacturing
60 Phenyl/toilet cleaner formulation and bottling
61 Polythene and plastic processed products manufacturing (virgin plastic)
62 Poultry, Hatchery and Piggery
63 Power looms (without dye and bleaching)
64 Puffed rice (muri) (using gas or electrical heating system)
65 Pulverization of bamboo and scrap wood
66 Railway Stations (Wastewater generation<10KLD)
67 Ready mix cement concrete
68 Reprocessing of waste cotton
69 Rice mill (Rice hullers only)
70 Rolling mill ( gas fired) and cold rolling mill
71 Rubber goods industry (with gas operated baby boiler)
72 Saw mills
73 Seasoning of wood in steam heated chamber
75 Soap manufacturing (hand made without steam boiling / boiler)
76 Spice grinding (20 HP motor)
77 Steel furniture without spray painting
78 Steeping and processing of grains
79 Surface treatment using water spray rinsing, degreasing, heating in ovens, electrostatic powder coating and curing using oven
80 Synthetic detergent formulation
81 Tamarind powder manufacturing
82 Tea processing (with boiler)
83 Tyres and tube retreating (without boilers)
2741 19 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2742 20 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2743 21 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

WHITE CATEGORY

1 2
1 Assembly of air coolers/conditioners, repairing and servicing
2 Assembly of bicycles, baby carriages and other small non motorizing vehicles
3 Automobile fuel outlets (only dispensing)
4 Bailing (hydraulic press) of waste papers
5 Bio fertilizer and bio-pesticides without using inorganic chemicals
6 Biscuits trays etc from rolled PVC sheet (using automatic vacuum forming machines)
7 Blending and packing of tea
8 Block making of printing without foundry (excluding wooden block making)
9 Catering serving food on tiffin basis, self help groups.
10 Cement Godown
11 Chalk making from plaster of Paris (only casting without boilers etc. (sun drying/electrical oven)
12 Compressed oxygen gas from crude liquid oxygen (without use of any solvents and by maintaining pressure & temperature only for separation of other gases)
13 Compressed Biogas (CBG)/Bio-CNG plants CBG plants (irrespective of the type of feed) producing Fermented Organic manure (FOM) & Liquid Fermented Organic Manure (LFOM) as by-products
14 Compressed Biogas (CBG)/Bio-CNG plants Household bio-digesters/gobar-gas (cow-dung) plants based on biodegradable wastes etc.
15 Cotton and woolen hosiers making (Dry process only without any dying/washing operation)
16 Cycle/motor track
17 Dairy Farm having less than 15 animals where milching animals (cows/buffaloes) are housed to produce milk for distribution and supply to milk processing plants
18 Diesel pump repairing and servicing (complete mechanical dry process)
19 Domestic bio-digestors based on cow-dung or household biodegardable wastes (such as gobar gas plants)
20 Electric lamp ( bulb) and CFL manufacturing by assembling only
21 Electrical and electronic item assembling (completely dry process)
22 Engineering and fabrication units (dry process without any heat treatment/metal surface finishing operations/painting)
23 Fabrication carrying out metal primer application/hand painting activity
24 Flavoured betel nuts production/grinding (completely dry mechanical operations)
25 Fly ash bricks/block manufacturing
26 Fountain pen manufacturing by assembling only
27 Glass bottles and vilas making from glass tubes
28 Glass putty and sealant (by mixing with machine only)
29 Ground nut decorticating
30 Handloom/carpet weaving (without dying and bleaching operation)
31 Leather cutting and stitching (more than 10 machine and using motor)
32 Manufacturing of coir items from coconut husks
33 Manufacturing of metal caps containers etc
34 Manufacturing of shoe brush and wire brush
35 Medical oxygen
36 Organic and inorganic nutrients (by physical mixing)
37 Organic manure (manual mixing)
38 Packing of powdered milk
39 Paper pins and u clips
40 Repairing of electric motors and generators (dry mechanical process)
41 Rope (plastic and cotton)
42 Scientific and mathematical instrument manufacturing
43 Sewage tankers
44 Solar module non conventional energy apparatus manufacturing unit
45 Solar power generation through solar photovoltaic cell, wind power and mini hydel power (less than 25 MW)
46 Surgical and medical products assembling only (not involving effluent/emission generating processes)
47 Stand-alone Massage Parlours, Beauty Parlour, Hair Cutting Saloon and SPAs
48 Tea stall
49 Used Cooking Oil (UCO) collection centres
2744 22 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

Note: Any industry/industrial activity, process or trades which do not fall under any of the above mentioned categories, the decision with regards to their categorization/classification, will be taken by the Board, from time to time when such need arises, either suo motto or on the specific request by the Industrial unit. Industrial unit concerned may apply to the Goa State Pollution Control Board in this respect for necessary action.

ACCOMPANIMENTS:

The Following documents should invariably be attached alongwith the application as follows:

A. Consent to Establish/Consent to Operate

1. Land Allotment/earmarking letter or lease/Sale deed/Form I & XIV.

2. Flow Chart and detailed production process.

2745 23 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

3. A copy of Project Report for projects costing Five crores and above.

4. Site plan (not required for units to be set up in Industrial Estates.)

5. Layout plan showing the location of manufacturing equipments, water supply/drainage lines, position of chimneys, effluent treatment plant and final discharge Point, Sludge solid waste disposal points and septic tanks/soak pits.

6. For industries/activities listed in Schedule I of the Environmental Impact Assessment (EIA) Notification 2006 copy of the EIA report/Form/Report submitted for obtaining Environmental Clearance and other survey, if required will have to be furnished in the prescribed time limit.

7. Photocopy of the prior Environmental Clearance (EC) issued by the Competent Authority, if applicable, for project listed in the Environment Impact Assessment (EIA) Notification, 2006, as amended from time to time.

8. Site plan showing surrounding Residential area , public places, water stream, etc., of the factory site within a radius of 5kms with waste water treatment and disposal systems clearly indicating where waste (cid:178) water is proposed to be disposed off (for medium and large scale enterprises).

9. Schematic sketch of the proposed effluent/sewage treatment system/plant (ETP/STP) and/or septic tanks/soak pit, duly signed by authorized person, along with detailed design calculation.

10. Certificate from Chartered Accountant certifying the Total Estimated Investment (T.E.I). (refer sample specimen below). In case of leased/hired premises/plant/machinery/equipment a certificate from a Registered Valuer towards capital cost is to be submitted without appreciation and depreciation.

11. Original authorization letter of the person to whom authorization is made to sign this application form except individual proprietary concern.

12. Any other documents/clarification as requisition by the Goa State Pollution Control Board.

B. Renewal of Consent to Operate

1. Certificate from Chartered Accountant certifying the Total Estimated Investment (T.E.I). (refer sample specimen below). In case of leased/hired premises/plant/machinery/equipment a certificate from a Registered Valuer towards capital cost is to be submitted without appreciation and depreciation.

2. Previous Consent to Operate issued by the Board

3. Stack Analysis Report/Analysis report of Treated effluent/sewage.

4. Any changes/modifications in the industry after the consent obtained.

13. Application for auto renewal of Orange and Green category will be accompanied by an affidavit annexed hereto for an individual proprietary concern.

14. Any other documents/clarification as requisition by the Goa State Pollution Control Board.

______

(cid:36)(cid:49)(cid:49)(cid:40)(cid:59)(cid:56)(cid:53)(cid:40)(cid:3)(cid:182)(cid:37)(cid:183)

[See rule 25(6) (e)]

Affidavit in support of obtaining

Auto Renewal of Consent to Establish/Operate

I, (cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17) S/o (cid:54)(cid:75)(cid:85)(cid:76)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171), aged(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171) (cid:92)(cid:72)(cid:68)(cid:85)(cid:86)(cid:15)(cid:3) (cid:36)(cid:88)(cid:87)(cid:75)(cid:82)(cid:85)(cid:76)(cid:93)(cid:72)(cid:71)(cid:3) (cid:86)(cid:76)(cid:74)(cid:81)(cid:68)(cid:87)(cid:82)(cid:85)(cid:92)(cid:15)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17)(cid:3) (Designation) of M/s(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17) (cid:11)(cid:56)(cid:81)(cid:76)(cid:87)(cid:3) (cid:44)(cid:39)(cid:3) (cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17)) am submitting this affidavit in favour of Member Secretary, Goa State Pollution Control Board,2746 24 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 Panaji for obtaining auto renewal of Consent to Establish/Consent to Operate under the provisions of Air (Prevention and Control of Pollution) Act, 1981 (Act 14 of 1981) and do, hereby take oath and state as under:(cid:179)

2. That the Consent to Establish/Consent to Operate under the provisions of Air (Prevention and Control of Pollution) Act, 1981 (Act 14 of 1981) was issued vide order No date(cid:71)(cid:3) (cid:171)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17) ...............................................................................

3. That the said Consent to Establish/(cid:38)(cid:82)(cid:81)(cid:86)(cid:72)(cid:81)(cid:87)(cid:3)(cid:87)(cid:82)(cid:3)(cid:50)(cid:83)(cid:72)(cid:85)(cid:68)(cid:87)(cid:72)(cid:3)(cid:76)(cid:86)(cid:3)(cid:89)(cid:68)(cid:79)(cid:76)(cid:71)(cid:3)(cid:88)(cid:83)(cid:87)(cid:82)(cid:3)(cid:171)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17)

4. That we have not carried out any expansion/modernisation/change in process/product/raw material/ fuel or change in pollution load.

5. That we are complying with conditions of previous consent and submitting requisite compliance report of earlier consent alongwith supporting documents as per schedule.

6. That we have submitted Environmental Statement report as prescribed under the rules,

7. There is no change in information provided in the prescribed application form submitted for obtaining earlier consent to operate.

8. That no directions were issued during last five years by the State Board under the provisions of section 31 (A) of Air (Prevention and Control of Pollution) Act, 1981 and section 5 of Environment (Protection) Act, 1986 (Act 29 of 1986).

9. There are no prohibitory directions from Courts/Appellate Authority/National Green Tribunal/ other judicial/Quassi judicial Authority.

10. We undertake to comply with the conditions and standards stipulated in consent order and with any additional condition/direction which may be stipulated by the Board in future and also to pay additional fee/charges demanded by the Board in future.

11. That I have understood that any wrong, partial, forged information/document submitted by me or any false affirmation made by the undersigned, I shall be liable for legal action including the prosecution under the provisions of Air (Prevention and Control of Pollution) Act, 1981 (Act 29 of 1981) and Information Technology Act, 2000 (Act 21 of 2000) alongwith the provisions of Indian Penal Code, 1860 (Act 45 of 1860).

DEPONENT

Declaration

I, the above named deponent do hereby attest and verify that the contents of para No. 1 to 11 of this affidavit are true and correct to the best of my knowledge. Nothing material has been concealed therein nor any part of it is false.

DEPONENT

______

SCHEDULE II

[see Rule 26(5), (6), (9), (10), (11), (13), (14)]

A. MEMBERS OF THE ENVIRONMENTAL AUDIT COMMITTEE

1

: ChairmanRetired Scientist/ Engineer from a reputed Scientific Organization/Institution to be nominated by the Chairman . 2 : Member A Senior Expert on Environmental Audit to be Appointed by GSPCB from any IRCA authorized ISO 14001:2015 Certification Authority . 2747 25 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 3

Member .

Member of the State Expert appraisal Committee nominated by the State Expert Committee

:

4

: Convener Scientist/Engineer of Goa State Pollution Control Board as nominated by Chairman, Goa State Pollution Control Board

.

B. OBJECTIVES

Objectives of Environmental Audit Scheme (EAS) is to engage deemed Scientific and Technical experts to provide a clear indication of the Environmental performance and compliance to Consent conditions of the Organization for the period covered by the audit.

The preliminary objectives of the EAS are as follows:

a) Provide an objective analysis of the environmental impacts arising from the Organizations activities;

b) Assess and Determine that mitigation measures including root cause analysis, corrective and preventive actions are effective in addressing environmental aspects and minimizing or removing environmental impacts;

c) Identify opportunities and make recommendations for improvements in environmental performance of the Organization

C. ROLES AND RESPONSIBILITIES

The roles and responsibilities of the various key players is provided in the context of the Environment Audit scheme.

I. RESPONSIBILTIES OF THE ORGANIZATION

a) The occupier shall be responsible for submitting Environmental Statement and provide all the assistance and necessary documentation for completion of the Environmental audit.

(i) GSPCB/CPCB Issued Consents/Directions/Guidelines (e.g. COINDS or related)

(ii) Complaint, if any, received by the GSPCB/Organization and corrective and preventive action taken thereof.

(iii) Defined and detailed Procedures of production process, Pollution Control Equipment, finished product/services, by products, consumption of raw materials, against finished products, measurement and monitoring of consumption of water, electricity or other fuels and/or other resources/material per unit finished product/service with responsibilities and supporting records.

(iv) Defined and detailed Procedures of available addressing identified environmental aspects per unit product output and the corrective-preventive measures to minimize its environmental impacts through the use of alternative technology, pollution control equipment or any other related technique with measurement and monitoring data, responsibilities and supporting records.

(v) Organizations Policy (Environment, Health and Safety-EHS), if any.

(vi) The Occupier of Organizations (as mentioned in the Sr. No.4) shall carry out a documented Root cause analysis of the Non conformances (NCf)/Non compliances (NCp) identified in the EAR once received from the Auditor along with its corrective and preventive action plan, and comments if any and submit the same within along with Form V Environmental Statement with satisfactory closure of CAPA to the Board by target date agreed upon by the Auditor and Occupier or before 30th June whichever is earlier with copy of the stipulated receipt of scrutiny fees to GSPCB

b) The Organizations hereafter applying for consent shall have to here onwards get its Environment Management System inspected by respective auditors regarding adequacy and efficacy thereof, through the Board.

2748 26 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

c) The Organization is also responsible for ensuring timely closures of Non conformances(NC) or Non Compliances or Corrective Action Preventive Action Plans or related observations.

II. RESPONSIBILITIES OF THE GOA STATE POLLUTION CONTROL BOARD

a. Appointment of auditor/s for conducting Environmental Audit.

b. The list of Board Authorized Auditors will be made publicly available on Board website.

c. To ensure effective conduct of the individual audits, the following information should be provided to the audit team leader by GSPCB

(cid:120) Organization Details

(cid:120) History of Defaults if any, and closures or pending issues there off.

(cid:120) Contact name, No. address

d. Forward a copy of the final EAR to the Organization within 15 days of receipt of the EAR.

e. Initiate appropriate action due to non closure of Non conformances/Non Compliances within time frame specified.

f. Payment to Auditors

(cid:120) Mode of Payment: the State Board will pay the Environmental Auditor the Audit fee as decided by the Board from time to time within one week of submission of bills for conducting the audit.

(cid:120) In turn, GSPCB will issue directions to Organizations covered under Audit Scheme to deposit the sum total of the estimated expenses towards auditors fee and auditor expenses from the concerned Organization within 15 days from the date of allocation to the auditor, interim payment within 15 days on receiving of bills from the auditor and final payment within 15 days from submission of final audit report based on actual and 25 percent of total cost incurred for Audit as administrative expenses incurred by the State Board

III. RESPONSIBILITIES OF THE ENVIRONMENT AUDIT COMMITTEE (EAC)

The GSPCB constituted Environmental Audit Committee members shall not have any conflict of interest with its present assignment. The terms of reference of this Committee are as follows:

(i) Define and develop audit criteria and its supporting procedure and protocol for the recognition/empanelment/selection of Environmental Auditors, including an assessment of the Au(cid:71)(cid:76)(cid:87)(cid:82)(cid:85)(cid:86)(cid:183)(cid:3) (cid:11)(cid:82)(cid:85)(cid:3) (cid:36)(cid:88)(cid:71)(cid:76)(cid:87)(cid:82)(cid:85)(cid:183)(cid:86)(cid:3) (cid:86)(cid:72)(cid:79)(cid:72)(cid:70)(cid:87)(cid:72)(cid:71)(cid:12). The EAC will suggest new parameters which have been introduced by CPCB/GSPCB. The same will be recommended to GSPCB.

(ii) Advise and create a guidance/technical document related to the subject which will enable effective auditing including effective auditing and laboratory functions.

(iii) The committee member(s) will also under take audit of Recognized Auditors., atleast once annually to ensure due diligence of the Auditor to the and advise them in any relevant matter and will suggest/implement the new parameters which are being introduced by the CPCB/GSPCB. A observation report of the same will be submitted in this regard within 15 days of visit

(iv) After scrutiny, the EAC will submit the final (list) of the Auditor(s) with their justifications for selection to the Board for issue of Board Recognition.

(v) EAC will meet atleast once in three months.

(vi) Conducting or arranging training programme for capacity building of auditors, Organization Representatives and regulators with respect to EAS.

2749 27 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(vii) (cid:54)(cid:75)(cid:68)(cid:79)(cid:79)(cid:3)(cid:85)(cid:72)(cid:89)(cid:76)(cid:72)(cid:90)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:68)(cid:88)(cid:71)(cid:76)(cid:87)(cid:3)(cid:85)(cid:72)(cid:83)(cid:82)(cid:85)(cid:87)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:86)(cid:88)(cid:69)(cid:80)(cid:76)(cid:87)(cid:3)(cid:87)(cid:75)(cid:72)(cid:76)(cid:85)(cid:3)(cid:70)(cid:82)(cid:80)(cid:80)(cid:72)(cid:81)(cid:87)(cid:86)(cid:3)(cid:82)(cid:81)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:49)(cid:38)(cid:11)(cid:73)(cid:12)(cid:183)(cid:86)(cid:3)(cid:3)(cid:82)(cid:85)(cid:3)(cid:49)(cid:38)(cid:11)(cid:83)(cid:12)(cid:183)(cid:86)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3) (cid:87)(cid:75)(cid:72)(cid:76)(cid:85)(cid:3) (cid:85)(cid:72)(cid:86)(cid:83)(cid:72)(cid:70)(cid:87)(cid:76)(cid:89)(cid:72)(cid:3) (cid:53)(cid:82)(cid:82)(cid:87)(cid:3) (cid:38)(cid:68)(cid:88)(cid:86)(cid:72)(cid:3) (cid:36)(cid:81)(cid:68)(cid:79)(cid:92)(cid:86)(cid:76)(cid:86)(cid:183)(cid:11)(cid:53)(cid:38)(cid:36)(cid:12)(cid:3) (cid:90)(cid:76)(cid:87)(cid:75)(cid:3) (cid:3) (cid:70)(cid:82)(cid:85)(cid:85)(cid:72)(cid:70)(cid:87)(cid:76)(cid:89)(cid:72)(cid:3) (cid:36)(cid:70)(cid:87)(cid:76)(cid:82)(cid:81)(cid:3) (cid:68)(cid:81)(cid:71)(cid:3) (cid:51)(cid:85)(cid:72)(cid:89)(cid:72)(cid:81)(cid:87)(cid:76)(cid:89)(cid:72)(cid:3) Action (CAPA) Plans

Assign the responsibility for conducting the individual audit to be made in sufficient time before the scheduled date of the audit, in order to ensure the effective planning of the audit.

D. ENVIRONMENTAL AUDIT PLANNING AND CONTROL

I. SELECTION OF ENVIRONMENTAL AUDITORS

(a) The Member Secretary of the Board shall appoint faculty of Engineering College, Science Colleges, University, or retired or serving Engineer or Scientist from reputed Institutions, Government Departments, or IRCA authorized ISO 14001:2015 Certification Agencies to be Environment Auditor/s who shall be preferably located in the State of Goa and have sufficient experience in the relevant field including relevant qualifications with the approval of the Chairman.

b) The Member Secretary will constitute Audit team for conducting the Environmental Audit for each audit with approval of the Chairman.

c) The entire audit work must be carried out by the auditor himself. In other words, the auditor shall and will not assign the audit work to any other agency/firm/personnel other than those recognized. Any violation in this regard shall lead to de-recognisation of the auditor and imposition of penalty at the discretion of the EAC.

d) In case of change in the man power (any member of the team), same shall be communicated to the GSPCB within one month and the auditor shall also obtain the approval of the Board for the replacement.

II. AUDIT CRITERIA

e) The Member Secretary of the Board will set out the Audit Criteria for each Environmental Audit with approval of the Chairman.

III. ENVIRONMENT AUDIT LABORATORY:

The Board/Agency shall engage the services of NABL recognized Laboratories and also having recognition of MoEF & CC whenever required.

E. AUDIT PROCEDURE

I. FUNCTIONS OF AUDITOR

The Empanelled Auditor on receiving Board recognition shall:

(a) Conduct audit of the GSPCB allotted Organizations as per schedule provided (b) Identify opportunities and make recommendations for improvements in environmental performance of the Organization

(c) Provide an objective, third-party report that (cid:80)(cid:72)(cid:72)(cid:87)(cid:86)(cid:3)(cid:42)(cid:54)(cid:51)(cid:38)(cid:37)(cid:183)(cid:86)(cid:3)(cid:3)(cid:85)(cid:72)(cid:84)(cid:88)(cid:76)(cid:85)(cid:72)(cid:80)(cid:72)(cid:81)(cid:87)(cid:86)(cid:17)(cid:3) (d) The auditor shall thoroughly ascertain about all the products/by products , ,manufactured by the Organization and its related processes& report to the GSPCB immediately by verifying excise registers, Invoices usage of raw materials and other production related documents, if there are any discrepancies

(e) Provide the information required to develop an Environmental Management Plan (EMP) in the event of any significant findings of negative impacts to the environment

(f) It shall be open to the auditors to make such recommendation as they may think fit for improvement of the existing environmental management system in the Organization audited, but such recommendation shall not bind the GSPCB in any manner. The recommendation of the GSPCB will be technically and scientifically assessed and the decision of the Board Chairman will be final and so intimated2750 28 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 (g) Ensure high levels of integrity, sincerity and ethics shall be maintained and practiced by the auditors

(h) Ascertain & report to GSPCB about the compliance made by Organization of the previous year's recommendations/observations of the auditor in the EARs.

(i) Report about % reduction in steam/water consumption, mass balance (air, water and solid waste), power consumption & consumption of raw materials etc. carried out by the industries in its observations in the EARs compared to the previous year.

(j) Pursue, emphasize and recommend about adoption of clean technology/cleaner production, waste segregation, waste minimization, waste reduction, waste exchange, reuse & recycling of effluents etc. & report the same in EARs. (k) Guide the industry if possible if any query is raised by the industry. (l) Ensuring review of timely closures of Non conformances (NCf) or Non Compliances(NCp) or Corrective Action Preventive Action Plans or related observations jointly with the Organization

(m) Conduct audit in the audit period prescribed i.e financial year ending March and submit the EAR within 15 days of completion of the audit, and the last, no later than by the 30th of April every year.

II. ENVIRONMENTAL AUDIT REPORT SUBMISSION (EAR)

(a) The EARs must include observations covering each of the seasons under audit, based on the analysis report of the Moef approved Laboratory or Board laboratory for effluents (air + waste water + Solid/hazardous waste + Noise + Weather data as case may be and other pollutants as auditor feels so, etc.) from all discharge points & submit all data of three observations in EARs, otherwise EARs shall be considered incomplete and can be rejected.

(b) The auditor must prepare and submit the EAR of Organizations under audit within 15 days of completion of the audit.

(c) The EAR shall be submitted to the Board with a copy marked to the Organization, which will be forwarded by GSPCB within 7 working days of receipt to the Organization to initiate necessary closure of Root Cause Analysis-Corrective and Preventive Action Plans.

(d) The auditor must clearly report to the Board all critical findings about any inconsistency and malpractice being committed/practiced by the Organization as listed in Sr. 2 (e.g. dilution of effluents, illegal discharge, production without permission, by pass of untreated effluent or any other activities which are likely to create environmental pollution problems, & contrary to the directions issued through consent orders & other orders under the different Acts, by the Board) after every inspection within 24 hrs and important recommendations after every inspection as immediately as possible but not later than 3 days and submit Final EAR within 15 days of completion of the Audit.

III. CONTENT OF AUDIT REPORT

(a) (cid:40)(cid:36)(cid:53)(cid:183)(cid:86)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:76)(cid:87)(cid:86)(cid:3)(cid:85)(cid:72)(cid:83)(cid:82)(cid:85)(cid:87)(cid:72)(cid:71)(cid:3)(cid:73)(cid:76)(cid:81)(cid:71)(cid:76)(cid:81)(cid:74)(cid:86)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:70)(cid:82)(cid:81)(cid:70)(cid:79)(cid:88)(cid:86)(cid:76)(cid:82)(cid:81)(cid:86)(cid:3)(cid:86)(cid:75)(cid:82)(cid:88)(cid:79)(cid:71)(cid:3)(cid:69)(cid:72)(cid:3)(cid:29)

(cid:120) Clear, timely, concise, easy to understand and objective;

(cid:120) provide a fair summary of all the relevant facts; and

(cid:120) demonstrate conformity with the related Environmental requirements

(cid:120) Properly analyzed and concluded, and

(cid:120) Supported by adequate, reliable, and fair audit evidence

(b) The EAR should consist of :

(i) A title page clearly briefly Indicating AUDIT aim with Organization name2751 29 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 (ii) Table of Contents

(iii) Executive Summary comprising of:

(cid:120) Description of the Organization Process and facilities (Main, ancillary (related) and Environmental control operations)

(cid:120) Description of the environment

(cid:120) Contractors and Activity Descriptions

(cid:120) Summary of findings

(iv) Introduction comprising of :

(cid:120) Audit Scope,

(cid:120) Audit Objectives identified, and

(cid:120) Audit Criteria identified

(cid:120) Auditors and Auditees (Organization representatives who were key contacts for the audit and describe their roles and responsibilities with regard to the audit.) (cid:120) Reference Documents (include a list of documentation reviewed prior to the audit (e.g., Consents, Directions, previous EARs, environmental assessments, permits, complaints or any other reference deemed relevant.).

(v) Site Activity Report comprising of

(aa) List of Organization Facilities

(ab) Developments if any

(ac) Assessments of internal controls

(ad) Assessments of Organizations Environmental Management Systems and Management Commitment

(ae) Typical Environmental Management Plan (that can be) evaluated as applicable (cid:120) Air Quality Control Plan

(cid:120) Water Quality Control Plan (Waste and wastewater management)

(cid:120) Waste Management Plan (Waste segregation, management and disposal ,Monitoring on pollution assessment and performance evaluation of pollution control devices made by the Auditors)

(cid:120) Resources Control Plan (Material ,Production mass balance Energy, Fuels and equipment management)-

(Figures or production of products, by products, consumption of Resources like raw materials, figures regarding use of water, fuel consumption and other material utilization to maximize the yield with respect to National/International bench mark mentioned in the Format of Environmental Audit Reports prepared by Auditors.) (cid:120) Soil and Groundwater Contamination Control Plan (Land, water and groundwater management

(cid:120) Marine Ecology Control Plan

(cid:120) Terrestrial Ecology Control Plan

(cid:120) Process Material Handling Plan (Hazardous and Non Hazardous materials management)

(cid:120) Noise and Vibration Control Plan (Noise engineering management)2752 30 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 (cid:120) Traffic Management Plan (Vehicle and its distribution Management, Status of (cid:51)(cid:82)(cid:79)(cid:79)(cid:88)(cid:87)(cid:76)(cid:82)(cid:81)(cid:3)(cid:88)(cid:81)(cid:71)(cid:72)(cid:85)(cid:3)(cid:38)(cid:75)(cid:72)(cid:70)(cid:78)(cid:11)(cid:51)(cid:56)(cid:38)(cid:183)(cid:86)(cid:12)(cid:3)(cid:83)(cid:72)(cid:85)(cid:80)(cid:76)(cid:87)(cid:86)(cid:3)(cid:12)

(cid:120) Erosion and Sediment Control Plan

(cid:120) Other Environmental Program.

(af) (Gathering of )Audit evidence

(ag) Interviews with Personnel/ ground staff if any

(ah) Identification and assessments of Incidents and Complaints if any

(vi) Audit Findings of

(cid:120) Environmental Management Systems and Management Commitment (Comments on (cid:87)(cid:75)(cid:72)(cid:3) (cid:50)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3) (cid:3) (cid:83)(cid:85)(cid:82)(cid:70)(cid:72)(cid:71)(cid:88)(cid:85)(cid:72)(cid:86)(cid:3) (cid:73)(cid:82)(cid:85)(cid:3) (cid:71)(cid:72)(cid:87)(cid:72)(cid:85)(cid:80)(cid:76)(cid:81)(cid:76)(cid:81)(cid:74)(cid:15)(cid:3) (cid:86)(cid:72)(cid:87)(cid:87)(cid:76)(cid:81)(cid:74)(cid:15)(cid:3) (cid:68)(cid:81)(cid:71)(cid:3) (cid:70)(cid:82)(cid:80)(cid:80)(cid:88)(cid:81)(cid:76)(cid:70)(cid:68)(cid:87)(cid:76)(cid:81)(cid:74)(cid:3) (cid:82)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3) (cid:72)(cid:81)(cid:89)(cid:76)(cid:85)(cid:82)(cid:81)(cid:80)(cid:72)(cid:81)(cid:87)(cid:68)(cid:79)(cid:3) (cid:83)(cid:82)(cid:79)(cid:76)(cid:70)(cid:76)(cid:72)(cid:86)(cid:3) (cid:68)(cid:81)(cid:71)(cid:3) (cid:82)(cid:69)(cid:77)(cid:72)(cid:70)(cid:87)(cid:76)(cid:89)(cid:72)(cid:86)(cid:15)(cid:3) (cid:68)(cid:86)(cid:3) (cid:90)(cid:72)(cid:79)(cid:79)(cid:3) (cid:68)(cid:86)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:82)(cid:89)(cid:72)(cid:85)(cid:68)ll commitment of senior management to meeting environmental requirements. Supported by evidence of efforts to monitor, measure, and report environmental performance.)

(cid:120) (cid:51)(cid:85)(cid:72)(cid:89)(cid:76)(cid:82)(cid:88)(cid:86)(cid:3) (cid:36)(cid:88)(cid:71)(cid:76)(cid:87)(cid:3) (cid:53)(cid:72)(cid:86)(cid:88)(cid:79)(cid:87)(cid:86)(cid:3) (cid:11)(cid:70)(cid:82)(cid:80)(cid:80)(cid:72)(cid:81)(cid:87)(cid:86)(cid:3) (cid:82)(cid:81)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:50)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3) (cid:80)(cid:72)(cid:70)(cid:75)(cid:68)(cid:81)(cid:76)(cid:86)(cid:80)(cid:86)(cid:3) (cid:87)(cid:82)(cid:3) (cid:71)(cid:72)(cid:87)(cid:72)(cid:85)(cid:80)(cid:76)(cid:81)(cid:72)(cid:3) the root causes of any identified environmental concerns and on the effectiveness &sufficiency of the actions taken to correct such situations and prevent their (cid:85)(cid:72)(cid:70)(cid:88)(cid:85)(cid:85)(cid:72)(cid:81)(cid:70)(cid:72)(cid:17)(cid:3) (cid:36)(cid:81)(cid:71)(cid:3) (cid:86)(cid:75)(cid:82)(cid:88)(cid:79)(cid:71)(cid:3) (cid:76)(cid:81)(cid:70)(cid:79)(cid:88)(cid:71)(cid:72)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:48)(cid:68)(cid:81)(cid:68)(cid:74)(cid:72)(cid:80)(cid:72)(cid:81)(cid:87)(cid:183)(cid:86)(cid:3) (cid:86)(cid:88)(cid:83)(cid:83)(cid:82)(cid:85)(cid:87)(cid:3) (cid:82)(cid:73)(cid:3) (cid:87)(cid:75)(cid:72)(cid:3) (cid:3) (cid:83)(cid:85)(cid:82)(cid:70)(cid:72)(cid:86)(cid:86)(cid:72)(cid:86)(cid:3) (cid:73)(cid:82)(cid:85)(cid:3) implementing and tracking corrective and preventive actions)

(cid:120) Non-conformances , Observations and Scope for Improvement (Tabulated based on priority based on degree of seriousness of environmental impact)

(cid:120) Summary of Root Cause Analysis -Corrective Action- and Preventive Action Plan Status(This section should provide details on any new or previously identified corrective action(s) taken and/or planned in response to non-conformances and/or the observations and/or Scope for Improvement(s)identified, particularly those that have been repetitive or are ongoing issues at the site or facility. In particular, the Corrective Action Plan should include the detailed root cause analysis, type of any required corrective and preventive action, the current status (e.g. open, closed) of corrective and preventive action(s), the date of planned closure, and the date of actual closure and deviation from the committed target and the justification there off.)

(cid:120) Incidents and Complaints

(cid:120) Status of Environment Management Plans if any

(cid:120) The EARs (Environment Audit Reports) shall be prepared and submitted by the auditors in Performa 1: EAR must be accompanied by efficacy & adequacy certificates in Performa 2 prescribed by GSPCB with duly signed acknowledgement by all the team members. If such reports will not be signed by all the team members then, the auditor will be derecognized and punitive action against the Auditor or industries/Project as listed in Sr. No. 2 will be taken, as the case may be.

(vii) CONCLUSIONS AND RECOMMENDATIONS

This section should include the conclusions of the audit with regard to

(cid:120) (cid:55)(cid:75)(cid:72)(cid:3)(cid:86)(cid:87)(cid:68)(cid:87)(cid:88)(cid:86)(cid:3)(cid:82)(cid:73)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:70)(cid:82)(cid:81)(cid:73)(cid:82)(cid:85)(cid:80)(cid:76)(cid:87)(cid:92)(cid:3)(cid:68)(cid:81)(cid:71)(cid:3)(cid:70)(cid:82)(cid:80)(cid:83)(cid:79)(cid:76)(cid:68)(cid:81)(cid:70)(cid:72)(cid:3)(cid:3)(cid:82)(cid:73)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:50)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3)(cid:40)(cid:48)(cid:54)(cid:3)(cid:90)(cid:76)(cid:87)(cid:75)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:47)(cid:72)(cid:74)(cid:68)(cid:79)(cid:3) and/or other requirements, as well as

(cid:120) (cid:55)(cid:75)(cid:72)(cid:3)(cid:72)(cid:73)(cid:73)(cid:72)(cid:70)(cid:87)(cid:76)(cid:89)(cid:72)(cid:81)(cid:72)(cid:86)(cid:86)(cid:3)(cid:82)(cid:73)(cid:3)(cid:87)(cid:75)(cid:72)(cid:3)(cid:50)(cid:85)(cid:74)(cid:68)(cid:81)(cid:76)(cid:93)(cid:68)(cid:87)(cid:76)(cid:82)(cid:81)(cid:183)(cid:86)(cid:3)(cid:40)(cid:48)(cid:54)(cid:3)(cid:76)(cid:81)(cid:3)(cid:80)(cid:72)(cid:72)(cid:87)(cid:76)(cid:81)(cid:74)(cid:3)(cid:76)(cid:87)(cid:86) environmental objectives.

(cid:120) RCA-CAPA: the capability and commitment of the Organization management to resolve the issues identified.

2753 31 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

(cid:120) The auditor may propose to request Organization to adopt an Environment Management Plan (EMP) if issues are identified in the audit that are considered to be repetitive or are ongoing issues, or problems that present significant concern for environmental impact. The EMP is a Corrective Action Plan that must be submitted and approved by EAC and requires formal reporting of the resolution of the issues. Guidance regarding the requirements for developing an EMP should be provided by the Auditor to facilitate the Organization to achieve an effective solution

(cid:120) The EAR should have recommendations to address any significant non-conformances or deficiencies, including allocating priorities for corrective action. Any recommendations should be specific and detailed enough to allow GSPCB and Organization management the ability to evaluate the feasibility and appropriateness of implementing the recommendation. Types of recommendations might include further investigation of an issue or implementation of emissions control technology or environmental pollution control best management practices. The emphasis of recommendations should be on removing the source of the problem rather than the use of command-and-control (or end-of-pipe) technology.

The recommendations should be brief and concise to allow Organization management to address the issue and GSPCB& EAC to assess adequate resolution of the same.

(viii) Attach Annexures:

(cid:120) Audit evidence ( records, procedures, photographs ,supporting documents etc.)

(cid:120) Audit Protocol(Checklist) duly signed by the Auditing team

(cid:120) Figures (if any)

(cid:120) Graphs (if any)

(cid:120) Tables (if any)

(cid:120) Any other detail felt relevant

The above format is the bare minimum required to be included in the EAR and is open for further additions by the Auditor if felt necessary.

Note: Consult COINDS document of CPCB, BAT document of European union, USA EPA document or any other relevant document to develop to banch mark.

F. POST AUDIT ACTION

I. ACTION/DIRECTON BY THE BOARD

(a) The BOARD on receiving the EAR from the Recognized Auditor will check status of compliance of the CAPA in the audited Organization , after the stipulated post Target dates and present the status to EAC for their necessary comments with Scientific and Technical comments if any

(b) Organizations failure to submit compliance to the observations in the EAR with the requisite closures of Non Conformances, Non compliances, Root Cause Analysis-Corrective and Preventive Action Plan may lead to appropriate legal action by GSPCB which may also include disconnection of water/power supply to the industry including closure and or levy of Polluter Pay Penalty.

(c) Where the Audit report of a particular industry industry/operation/process/activity indicates that the industry does not meet with the requirements as prescribed by or under the aforesaid statutory provisions and that the industry has not complied with terms and conditions of CTE/CTO and those contained in any general of special circular/ order of GSPCB, the industry shall be liable for appropriate directions which include direction of closure, after verification of the status of CAPA closures by stipulated dates.

2754 32 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

II. ACCOUNTABILITY/LIABILITY OF THE AUDITORS/INDUSTRIES

(a) If the information provided by the Organization is found to be incorrect or inaccurate the Organization shall be liable to be subjected to the appropriate direct direction.

(b) The Auditor whose report is found to be incorrect or inaccurate of particular industry then that EAR shall be rejected and action against the auditor will be taken accordingly.

(c) The Organization has the right to complain against the recognized environmental auditor if felt essential due to misdemeanour or malpractice. In such a case the Organization can register a written complaint against auditor to GSPCB within 15 days of the said grievance, with supporting evidence and due justification. Complaints against the actions or conduct of a certified auditor will be reviewed and investigated by EAC. The EAC will investigate and if validated or substantiated, the complaint may result in cancellation of recognition of the auditor s and blacklisting them. However, If the complaint is found to be without merit, the Organization will be appropriately penalized

III. APPEALS

(a) Any person aggrieved by an order made by the Board under section 16 or section 17 may within thirty days from the date on which the order is communicated to him, prefer an appeal to Appellate Authority constituted under section 31 of Air (Prevention and Control of Pollution) Act, 1981 (Act 14 of 1981).

(b) On receipt of an appeal preferred under sub-section (1), the Appellate Authority shall after giving the Appellant and Board an opportunity of being heard, dispose of the appeal as expeditiously as possible.

G. FORMAT FOR THE ENVIRONMENTAL AUDIT REPORT

(To be submitted in triplicate)

(cid:11)(cid:51)(cid:72)(cid:85)(cid:76)(cid:82)(cid:71)(cid:3)(cid:73)(cid:85)(cid:82)(cid:80)(cid:171)(cid:171)(cid:171)(cid:17)(cid:17)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:87)(cid:82)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:171)(cid:171)(cid:171)(cid:171)(cid:171)(cid:3)(cid:3)(cid:3)(cid:3)(cid:12)

To, The Member secretary Goa State Pollution Control Board 1ST floor, Dempo Tower Patto Plaza Centre Panjim-403001

A. GENERAL
1. Name of the Industry/operation/process/activity
2. Location:
3. Registered office Address:
4. Month and year of establishment:
5. No. of workers employed:
Male
Female
6. No. of electrical connections with service numbers:
Total connected load
Electric consumption per tones of product manufactured:
Percentage enhancement in energy:
Saving as compared to previous year:
7. Number of D.G. Set and their capacity:
8. Name/Residential address of all Directors/Partners:
9. Telephone Nos: (Residential & Industrial)
Fax No:
E-mail of Industry:
E-mail Partners/Directors:
10. No. of shifts and timings:
11. Name & Address of the in charge of Environment/ /Safety Division/Cell/Unit:
12. No. of days during which production activities were in operation during the audit period covered:
13. Has the industry obtained ISO 9000/ISO 14000/ /OSHAS 18000/Any other EM accreditation/ /Certification
14. Whether the industry has adopted cleaner production/cleaner technology/CDM?
B. PRODUCT DETAILS
1. Name of products (s) & capacity yield/purity per day,
2. Efficiency of production (or production yield)
3. Name of all by products and its quantity per day:
4. Date of commencement of production for each product. Whether production is as per consented quantity:
5. All raw materials required per kg of the Products(s):
6. Whether the manufacturing process is continuous or batch wise:
Indicate the batch capacity:
If the process is in batch operation, no. of batches/month along with the duration of the completion of each batch:
7. Detailed manufacturing Process with schematic flow diagram:-
List of unit operation and processes and with all chemical reactions along with the time required (in hrs.) for
(C ) WATER
1. The quantity of water consumed per day as per tones of product manufactured: (Attach water balance diagram)*over the last three years:
2. The quantity of waste water (trade effluent) generated per tones of each product per day, as well as per batch*over the last three years.
3. The particulars of effluent treatment plant (Attach separate sheets)
Name and size of each unit
Capacity of ETP
Flow diagram and Hydraulic diagram, of ETP to be submitted:
Whether lighting arrangement around ETP is provided:
Whether separate energy meter is installed for effluent treatment plant. If Yes -readings of the meter for consumption every month:
Calibration status and validity of energy meter
Whether flow meters are provided at the inlet and outlet of ETP. Please indicate the type of the flow meter and calibration status if valid
4. The method of disposal of final treated effluent and the point of disposal (please attach sketch): Is it in line with the valid Consent Requirements ?
5. The quantity of trade effluent at the inlet and outlet of ETP and at various stages of treatment (Attach separate sheets):
6. The quantity and quality of sewage and its method of treatment and disposal (Attach separate sheets):
a) As per norms:
b) Total pollution load*:
7. The open area available for disposal of the effluent
8. Whether the quality of treated effluent meets the specified norms:
If no, the extent of deviation and reason thereof:
9. Improvement in effluent quality and quantity since previous environmental audit based on performance evaluation of effluent management system:
If yes, provide details (Attach separate sheets):
10. Retrofitting undertaking to improve performance of ETP:
If yes, provide details:
11. Major problems encountered during operation of effluent treatment facilities, if any and reasons thereof:
12. The details about the Operator/Chemist responsible for operation and maintenance of effluent treatment plant:
Name of the operators/employees:
Qualification & Experience of each Operator/ /employee whether trained in such operation or not:
Salary of operators/employees.
Operator using PPE, pls specify type
Maintenance and downtime Register maintained and updated, Response time for rectification
13 The current status of consent under the Water Act- 1974:
D. AIR
1. No. of the flue gas stacks, their height (from ground level) nature and consumption of fuel:
2. The details pertaining to the stack monitoring facilities:
3. Number of process stacks, their height (from ground level) source, expected pollutants and the details pertaining to the provisions of stack monitoring facilities:
4. The quality of emission from each flue gas stack and the process stack and the extent of deviation from them:
Pollution Load determination
5. The ambient air quality within the factory premises, along with the number of ambient air quality monitoring stations outside the industry:
6. The status of consent under the Air Act-1981:
7. The details of air pollution control measures for all process and flue gas stacks
8. Improvement in emission quality since previous environmental audit based on performance evaluation of air pollution management system:
If yes, Provide details. (Attach separate sheets):
9. Retrofitting undertaken to improve emission quality. If yes ,provide details:
10. Major problems encountered during operation of control device, if any and reasons there of:
11 equipment status
* Whether production is as per consented quantity
NOTE: Total pollution load each for air, water and hazardous waste should have mentioned along with the quality of effluent, emission or solid waste as the case maybe. Whether measures taken for reduction of pollution load.
E. HAZARDOUS (SOLID ) WASTE
1. The quantity, sources and composition of hazardous waste/solid waste from each process/sources over the last three years. (Total sludge generation per tonne of product):
2. (a) The method of storage, treatment and disposal of hazardous/solid waste:
The details should include area of storage and disposal and whether storage and disposal system is covered and made impervious (pucca):
The quantity of Hazardous waste sent to TSDF.
Please also indicate how the quantity of hazardous/solid shall be reduced in next three months:
(b) The data/information about leachate generation, quantity and characteristics and treatment facility
3. The status of authorization under the EPA-86 for solid waste
4. Plan, if any to reduce hazardous waste generation or its recycling.
F. SITE PLAN
1. The site plan showing the location of effluent treatment plant, final point of disposal of effluent, sampling point, drainage line, stacks, solid waste storage, disposal area and green belt (its width).
(G) RESOURCE RECOVERY
1. The details regarding resource recovery including treated effluent for recycle/reuse from environmental pollution control system including effluent treatment plant:
The details regarding resource recovery/by product recovery from manufacturing process by using cleaner production technology:
Energy/Fuel consumption/unit production
(H) ACCIDENTS
1. The details of accidents in the factory if any and remedial measures taken
(I) SAFETY MEASURES
1. General Environment of the factory. Please tick (¥) the appropriate column
a. Housekeeping Good Fair Poor
b. Dustiness High Medium Low
c. Lighting Good Fair Poor
d. Ventilation Good Fair Poor
2. Whether the following personal protective equipment PPC are provided to all the workforce (employees & Contract Workers)
Is yes, How many?
Goggles Yes / No (utilization level)
Gloves Yes / No (utilization level)
Gumboot Yes / No (utilization level)
Helmet Yes / No (utilization level)
Skin cream Yes / No (utilization level)
Soap Yes / No (utilization level)
Ear plug Yes / No (utilization level)
Face masks Yes / No (utilization level)
Clothing Yes / No (utilization level)
3. The details of facilities for disaster management/gas leakage.
4. Whether on site/off site emergency plans are prepared and are being implemented/upgraded regularly; please give details
5. Whether records of occupational hazards are maintained?
6. Health checks conducted?
7. Preventive measures adopted to minimize occupational hazard.
8. Compliance with work exposure
9. Noise level status
(J) REMEDIAL MEASURES
1. The details of sources; monitoring and measures taken for control of noise pollution in and around the industrial premises:
2. The measures taken for prevention treatment and control of odour nuisance in and around the industrial premises:
3. The details in respect of cases/complaints under the Water Act-1974, the Air Act-1981 and the Environment (P) Act, 1986:
4. The compliance report with respect to all the conditions of NOC/Consent (Under all the Acts):
5. Incidents of spillages, leakages etc. and remedial measures thereof
6. Whether insurance policy obtained under PLI Act. Yes/No
(K) WATER CESS
1. The details regarding payment of the Water cess for the previous and current year:
(L) The name and address of the Consultant engaged by the Company/Industry
I t is hereby declared that all the information submitted in and with respect to this format correct and we will be responsible for any lapse regarding incorrect or incomplete information. T he Root Cause Analysis along with CAPA is attached here with.
A. B.
Name and signature of the responsible persons industry/organization/Institute/CETP/TSDF with the stamp Name and signature of all the members of the Audit Team
Sr. Name Sign Sr. Name Sign
2755 33 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2756 34 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2757 35 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2758 36 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 2759 37 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

SYSTEM

Mr./Mrs./M/s. ________________________________ of __________________________is recognized by the Goa State Pollution Control Board vide order No. _______________________ dated_________as an Environmental Auditor for the purpose of the auditing, having carried Environmental audit of:

2760 38 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

M/s ______________________________________________

Located at ____________________________________

Manufacturing products:

Product (s)_______________________________

Capacity _____________________________

Having completed the environmental audit based on personal monitoring, and audit report, prepared as per the notification via order no._________ dated._________. It is certified that the Environmental Management System (EMS) provided by this industry for the products manufactured and capacity as stated above is *_____________________ to achieve the quality of effluents (Air + Waste Water + Solid Waste) as specified in Consent/Notifications by GSPCB, Panjim for the following quantity of waste generation:

Liquid effluent _________m3/day
Solid/Hazardous waste _________m3/day
Air emissions (flue gas stacks as well as process stacks Adequate/Not adequate. Efficacious/Not efficacious (pl. strike which is not applicable)
Sample details Sampling location Collected by Sample collection Method of sample collection Std. Analysis method
Date Time
1. Parameters analysed on site
2. Parameters analysed off site
3. Whether samples were preserved as per standard procedure for offsite analysis: Yes/No
4. Parameters analysed by auditors team:
5. Parameters analysed by third party:
Name & Address of laboratory:
Whether the laboratory is classified under Schedule I of the GSPCB
6. Method followed for analysis:
Air emission :
Water/Waste Water :
Solid Waste :
Hazardous Waste:
2761 39 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021

This is to certify that the third party laboratory in which the analysis has been done is approved under EPA/Accredited by NABL/recognised under GSPCB.

Name and address of the Laboratory

Signature of Authorised Signatory of the Laboratory

_____

SCHEDULE III

BUDGET AND ACCOUNT HEADS

[See rule 27(3)]

ADMINISTRATION

Head of Accounts (Expenditure)

1. Salaries 2. Wages 3. Travel Expenses 4. Office Expenses (a) Furniture (b) Postage (c) Office Machine/Equipment (d) Liveries (e) Telephones (f) Electricity and Water Charges (g) Stationary (h) Printing (i) Staff car and other vehicles (j) Other items 5. Fee and Honoraria 6. Payment for professional and special services 7. Rents, rates and Taxes/Royalty 8. Publication 9. Advertising, Sales and Publicity Expenses

10. Grants in aid/Contribution/Subsidies 11. Hospitality Expenses/Sumptuary/Subsides 12. Pensions/Gratuities2762 40 OFFICIAL GAZETTE — GOVT. OF GOA SERIES I No. 39 (EXTRAORDINARY) 23RD DECEMBER, 2021 13. Write off/Losses 14. Suspenses 15. Expenses in connection with the setting up and maintenance of the Board Laboratory.

16. Other charges (A residuary head, this will also include rewards and prizes)

Head of Accounts (Receipts)

1. Payments by Government

2. Fees

3. Fines and other Receipts.

www.goaprintingpress.gov.in

Printed and Published by the Director, Printing & Stationery, Government Printing Press, Mahatma Gandhi Road, Panaji-Goa 403 001.

PRICE – Rs. 103.00

PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—311/150—12/2021. 41 2763

  1. /day This certificate is valid for the Audit report only. However, it is subject to automatic cancel lation in case of any change in product profile/capacity, quality and quantity of effluent emission ( Water + Waste Water + Solid /Hazardous) and efficiency of EMS equipments. This Certificate forms part of Environmental Audit Report Name and address of the Environmental Auditor Signature of the Environmental Auditor Date: Place: *here write, whether adequate and efficient or inadequate and inefficient as applicable I. CERTIFICATE FOR SAMPLING AND ANALYSIS This is to certify that the following samples of emissions (water, water, waste water, solid and hazardous wastes) have been collected and analysed as per the following details: This is to certify that the third party laboratory in which the analysis has been done is approved under EPA/Accredited by NABL/recognised under GSPCB. Name and address of the Laboratory Signature of Authorised Signatory of the Laboratory ↩
  2. /day This certificate is valid for the Audit report only. However, it is subject to automatic cancellation in case of any change in product profile/capacity, quality and quantity of effluent emission (Air + Waste Water + Solid/Hazardous) and efficiency of EMS equipments. This Certificate forms part of Environmental Audit Report Name and address of the Environmental Auditor Signature of the Environmental Auditor Date: Place: *here write, whether adequate and efficient or inadequate and inefficient as applicable I. CERTIFICATE FOR SAMPLING AND ANALYSIS This is to certify that the following samples of emissions (air, water, waste water, solid and hazardous wastes) have been collected and analysed as per the following details: ↩
Cite this issue. Goa Gazette, Government of Goa, 23 December 2021. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.goa.egaz.2122-39.SI/2122-39-SI-EOG-1/. Archive identifier in.goa.egaz.2122-39.SI/2122-39-SI-EOG-1.