RNI No. GOAENG/2002/6410 Reg. No. RNP/GOA/32/2021-2023SERIES II No. 21 Panaji, 24th August, 2023 (Bhadra 2, 1945)
PUBLISHED BY AUTHORITY
Note:- There is one Extraordinary issue to the Official Gazette, Series II No. 20 dated 17-08-2023 namely, Extraordinary dated 21-08-2023 from pages 495 to 496 regarding Notification from Goa Legislature Secretariat.
GOVERNMENT OF GOA
Department of Animal Husbandry & Veterinary Services
Directorate of Animal Husbandry & Veterinary Services
–––
Order
No. 14-9-AH/DSPCA/2023-24/2619
The Government of Goa had notified the District SPCA North Goa and South Goa under the Prevention of Cruelty to Animals Act, 1960 (Establishment and Regulation of SPCA Rules, 2001). Subsequently, the Managing Committee of the District SPCA North Goa and South Goa were notified vide Notification No. 14-9-AH/AWB/2020-21 dated 17-09-2020 and the same were duly registered under the Registration of Societies Act, 1980.
Government of Goa is pleased to appoint the following Officers as Member Secretaries with their Link Officers on District Society for Prevention of Cruelty to Animals (DSPCA), for North Goa District and South Goa District respectively in addition to their own duties:-
Sr. No. Name of the Officer Name of the District SPCA Link Officers 1 2
3
4
1. Dr. Harsh Bathini, Assistant Member Secretary, DSPCA, Senior most Veterinary Director, Veterinary Hospital, North Goa District Officer of Veterinary Hospital, Tonca, Caranzalem, Goa
Tonca, Caranzalem, Goa.
2. Dr. Atanazia Fernandes, Member Secretary, DSPCA, Senior most Veterinary Assistant Director, Veterinary South Goa District Officer of Veterinary Hospital, Hospital, Sonsodo, Margao-Goa
Sonsodo, Margao, Goa.
Dr. Harsh Bathini, Assistant Director, Veterinary Hospital, Tonca, Caranzalem, Goa shall take over complete charge of post of Member Secretary, DSPCA North Goa District thus relieving Dr. Prakash Korgaonkar, Assistant Director, Directorate of Animal Husbandry & Veterinary Services, Patto, Panaji, Goa and Dr. Atanazia Fernandes, Assistant Director, Veterinary Hospital, Sonsodo, Margao, Goa shall take over complete charge of post of Member Secretary, DSPCA South Goa District thus relieving Dr. Nitin Naik, Assistant Director, Directorate of Animal Husbandry & Veterinary Services, Patto, Panaji, Goa with immediate effect.
This Order supersedes the earlier Order in this regards.
By order and in the name of the Governor of Goa.
Dr. Agostinho Misquita, Director & ex officio Jt. Secretary (AH).
Panaji, 16th August, 2023.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023Order
No. 8-2(47)/AM/Revival/2023-2024/2641
Sanction of the Government is hereby accorded for the revival of 2 (Two) lapsed posts of Storekeeper under Group "C" on regular basis in the Directorate of Animal Husbandry and Veterinary Services, Panaji. The details are as shown below:
Sr. Designation/Category No. of Name of the Employee Pay Budget Head No. of the post posts with Creation Order Scale
1. Storekeeper 01 Shri Vassu R. Sawant, Pay Matrix 2403—Animal
G. O. No. FYP/3/ Level-04 Husbandry; /AHVS/64/14911 PB-5200-20200+ 00—; dated 30-04-1993 GP Rs. 2400/- 102—Cattle &
Buffalo Development; 01—Government Livestock
Farm;
01— Salaries.
01 Shri Bhalchandra Pay Matrix 2403—Animal
V. Gaonkar, Level-04 Husbandry; G. O. No. FYP/12/ PB-5200-20200+ 00—; /AHVS/64/15673 GP Rs. 2400/- 103—Poultry dated 15-06-1964
Development; 01—Government Poultry Farm; 01— Salaries.
This issues with the concurrence of Finance Department vide their U. O. No. 4268/F dated 10-08-2023 & Secretary, Finance vide their U. O. No. 227 dated 10-08-2023.
By order and in the name of the Governor of Goa.
Dr. Agostinho Misquita, Director & ex officio Jt. Secretary (AH).
Panaji, 17th August, 2023.
——————
Department of Co-operation
Officer of the Registrar of Co-operative Societies –––
Order
No. 3/1/Urban Credit/TS-II/BZ/2018/RCS/1910
Read: 1. Order No. 48-8-2001-TS-RCS/III/311 dated 21-04-2017.
2. Circular No. 6-13-81/EST/RCS/Part V dated 06-03-2020.
3. Order No. 3/6/Urban Credit/TS II/BZ/2018/ /RCS/3122 dated 14-12-2020.
4. Letter No. ARCS/BZ/ADT/CIRCULAR/64 dated 11-04-2023.
5. Letter No. 3/1/Urban Credit/TS II/BZ/ /2018/RCS/3122 dated 08-05-2020.
6. Letter No. BMUCCSL/HO/243/23-24 dated 09-06-2023 received from the Bicholim Merchant Urban Co-operative Credit Society Ltd., Bicholim, Goa.
Whereas, vide Order read at Sr. No. 1 above, Adv. Yeshwant V. Gauns, having office at Flat No. 7, First Floor, Apa Residential Complex, Valpoi, Sattari-Goa was appointed as Registrar's Nominee under Section 86(1) of the Goa Co-operative Societies Act, 2001 (Goa Act No. 36 of 2001) (hereafter referred as "Act") read with Rule 116(1) of the Goa Co-operative Societies Rules, 2003 and his name is reflecting at Sr. No. 09 of the said Order.
And whereas, vide this office Order read at Sr. No. 3 above, Adv. Yeshwant V. Gauns was authorized as dedicated Nominee of the Registrar of Co-operative Societies for the Bicholim Merchant Urban Co-operative Credit Society Ltd. (Reg. No. RES-(A)-5/NZ/Goa), Near "Sahayog", Odli, New Market, Bicholim, Goa (hereafter referred as "said Society") to entertain all the disputes referred to him in matters of recovery of outstanding loans of the said Society, without routing through this Department.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023And whereas, the said authorization was initially for a period of one year w.e.f. 14-12-2020 to
13-12-2021. And whereas, vide letter dated
11-04-2023 read at Sr. No. 4 above, the Asstt.
Registrar of Co-operative Societies, Bicholim Zone,
Sanquelim, Goa has forwarded the request of the
said Society for extending the said authorization
for a further period of one year.
And whereas, it was observed that there was an
inordinate delay in submitting the proposal to this
office for extending the term of Adv. Yeshwant V.
Gauns as the dedicated R's Nominee of the said
Society and therefore this office vide letter dated
08-05-2023 referred at Sr. No. 4 above, instructed the Assistant Registrar of Co-operative Societies, Bicholim Zone, Sanquelim to seek clarification from the said Society for not submitting the proposal for such extension within the stipulated time.
And whereas, the Society vide letter dated 09-06-2023 referred at Sr. No. 5 above, clarified that the delay was due to inadvertency and hence requested for extension for a further period w.e.f. 13-02-2021.
Now therefore, in exercise of the powers conferred under Section 123(B) of the Goa Co-operative Societies Act, 2001 read with Rule 116 of the Goa Co-operative Societies Rules, 2003, I, the undersigned Registrar of Co-operative Societies do hereby extend the authorization of Adv. Yeshwant V. Gauns, having office at Flat No. 7, First Floor, Apa Residential Complex, Valpoi, Sattari-Goa, as dedicated RCS Nominee for a period
of two years with retrospective effect from
13-12-2021 to 12-12-2023 for the Bicholim Merchant
Urban Co-operative Credit Society Ltd. (Reg. No.
RES-(A)-5/NZ/Goa), Near "Sahayog", Odli, New
Market, Bicholim-Goa.
Further, when a purported dispute is referred
by the said Society, the above named dedicated
Nominee is authorized to first decide under
sub-section (1) of Section 86 of the Goa
Co-operative Societies Act, 2001 whether the matter
referred by the Society involves a dispute and pass appropriate Orders under sub-section (1) of Section 86 of the Act.
Further, only upon the Nominee satisfying that there exists a dispute, he shall proceed to adjudicate the same and give Award accordingly. The Nominee shall abide by the terms and conditions on which he was originally appointed as Registrar's Nominee vide Order read at Sr. No. 1 above.
This extension of authorization as dedicated Nominee is liable to be withdrawn at any time without assigning an reason thereof at the discretion of the undersigned.
Given under the seal of this office.
Manuel Barreto, Registrar (Co-operative Societies)
& ex officio Joint Secretary (Co-operation).
Panaji, 16th August, 2023.
————
Order
No. 60/188/MOC/SCDC-DCDC/W-II/HO/RCS/263/1953
Read: 1. Letter No. R-11016/52/2022-CTP dated 17-03-2023 and Letter No. R-11016/28/ /2022-CTP dated 21-06-2023 from Joint Secretary, Ministry of Co-operation, CTP Division, New Delhi.
2. Order No. 60/188/M.O.C/W-II/RCS/358 dated 02-05-2023 issued by Registrar of Co-operative Societies, Panaji, Goa.
Vide above read letter dated 17-03-2023, it is informed that the Union Cabinet in its meetings held on 15-02-2023 has approved the plan for "Strengthening Co-operative movement in the Country and Deepening its reach up to the Grassroots" by setting up new multipurpose PACS or dairy/fishery primary co-operative societies in each uncovered Panchayat/village in the country as the case may be and strengthening existing PACS and dairy fishery co-operatives through convergence of various identified Schemes of Government of India.
In order to ensure smooth and effective implementation of the plan, an Inter-Ministerial Committee (IMC) under the Chairmanship of Hon'ble Union Minister for Co-operation and a National Level Co-ordination Committee (NLCC) under the Chairmanship of Secretary (Co-operation), Government of India has been constituted.
The implementation plan required all the States/ /UT's to constitute State Co-operative Development Committee (SCDC) at the State level and District Co-operative Development Committee (DCDC) in each District in order to ensure implementation of the Plan.
Hence, in accordance with the implementation plan, Government had constituted 2 District Co-operative Development Committees (DCDC) for the North Goa and South Goa District of Goa.
Now, vide above read letter dated 21-06-2023, it is informed that the Union Cabinet in its meeting held OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 on 31-05-2023, has approved the "World's Largest Grain Storage Plan in Co-operative Sector" for creation of various agri infrastructure at PACS level, including warehouses, custom hiring center, processing units, fair price shops, etc. by leveraging
the 'whole-of-Government' approach and has further
requested to expand the membership of SCDC and
DCDC so that the same Committee is able to undertake implementation and monitoring of both the plans, i.e., 'World's Largest Grain Storage Plan in Co-operative Sector' and 'Strengthening Co-operative Movement in the Country and Deepening its reach up to the Grassroots.
Accordingly, Government is pleased to amend the District Co-operative Development Committee (DCDC) constituted vide Order No. 60/188/M.O.C/ /W-II/RCS/358 dated 02-05-2023 for the North Goa and South Goa Districts as under:
A. District Co-operative Development Committee (DCDC) for North Goa District
1. District Collector (North) — Chairperson.
2. CEO, Zilla Panchayat — Member.
(North)
3. Additional Collector-I — Member.
(North)
4. Deputy Registrar of — Convener.
Co-operative Societies (Tech.)/District Level Incharge (North)
5. Deputy Director of — Member.
Animal Husbandry & Veterinary Services
6. Deputy Director of Fisheries — Member.
7. Deputy Director of Agriculture — Member.
8. Deputy Director of Civil — Member.
Supplies and Consumer Affairs
9. Representative not below — Member.
the rank of General Manager of the Goa State Co-operative Bank Ltd.
10. District Development — Member.
Manager (DDM)/Representative for Goa Regional Office of NABARD
11. Representative of NDDB — Member.
12. Representative of NFDB — Member.
13. Representative of FCI — Member.
14. Representative of CWC — Member.
15. Representative of WDRA — Member.
16. Managing Director of — Member.
the Goa State Co-operative Milk Producers Union Ltd., Curti, Ponda, Goa
B. District Co-operative Development Committee (DCDC) for South Goa District
1. District Collector (South) — Chairperson.
2. CEO, Zilla Panchayat — Member.
(South)
3. Additional Collector-I — Member.
(South)
4. Deputy Registrar of — Convener.
Co-operative Societies (Admn.)/District Level Incharge (South)
5.Deputy Director of — Member.
Animal Husbandry & Veterinary Services
6. Deputy Director of Fisheries — Member.
7. Deputy Director of Agriculture — Member.
8. Deputy Director of Civil — Member.
Supplies and Consumer Affairs
9. Representative not below — Member.
the rank of General Manager of the Goa State Co-operative Bank Ltd.
10. District Development — Member.
Manager (DDM)/Representative for Goa Regional Office of NABARD
11. Representative of NDDB — Member.
12. Representative of NFDB — Member.
13. Representative of FCI — Member.
14. Representative of CWC — Member.
15. Representative of WDRA — Member.
16. Managing Director of — Member.
the Goa State Co-operative Milk Producers Union Ltd., Curti, Ponda, Goa
The roles and responsibilities of the District Co-operative Development Committee (DCDC) are as under:
1. To ensure the regular and timely updation of
National Co-operative Database.
2. To prepare the District Plan for setting up of new multipurpose PACS or primary dairy/ OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 /fishery Co-operative Societies on the basis of the gap analysis from National Co-operative Database.
3. To ensure that all the Panchayats/Villages in the district are covered by multipurpose PACS or primary dairy/fishery co-operative societies, as the case may be.
4. To establish linkages of existing and new primary Co-operative Societies with State Co-operative Bank and/or their respective District/Block Level Federations, if any, with the support of State Government and other stakeholders concerned. If District/Block Level Federations are not existent, then linkages may be established with the Federations present in nearby District/Block.
5. To facilitate setting up of District Level Federations, if not presently existent, as per requirement and viability assessment, in co-ordination with State Government and stakeholders concerned.
6. To facilitate registration of new primary Co-operative Societies with the support of Registrar of Co-operative Societies.
7. To ensure dovetailing of various schemes of Government of India at the level of PACS or Primary Dairy/Fishery Co-operative Societies to improve their viability and make them vibrant economic entities.
8. To provide all necessary infrastructure and logistical support to primary co-operative societies at the Panchayat/Village level, including allotment of Government/Gram Sabha land to PACS.
9. To examine and assess the availability of existing storage facilities, their capacity utilization, storage gap, capacity of proposed godowns, viability of the applicant PACS, location of the proposed project, connectivity, logistics, etc.
10. To provide necessary Government/Gram Sahha land to PACS/LAMPS/FSS/For creation of grain storage facilities and their other agri- infrastructure.
11. To notif y su ch PACS /LAMP S /FS S as procurement centre for procurement of food grains at Minimum Support Price (MSP).
12. To grant Fair Price Shop (FPS) license to such
PACS/LAMPS/FSS.
13. To facilitate in preparation of Detailed Project Reports (DPRs) for the PACS/LAMPS/FSS with the support of NAB CONS or any other agency for availing subsidy/interest subvention under various GOI schemes.
14. To recommend the proposal of applicant PACS/ /LAMPS/FSS for creation, refurbishment, modernization and up gradation of agri infrastructure.
15. To provide all necessary logistical and infrastructural support, including utilities, road connectivity, etc. to the PACS/LAMPS/ /FSS.
16. To co-ordinate with all the line Departments for granting requisite approvals/clearances/ permissions to the PACS/LAMPS/FSS.
17. To assist in establishing linkages of agri infrastructure to be created at PACS/LAMPS/ /FSS with Central/State/Private agencies in co-ordination with all the stakeholders concerned, to ensure fmancial viability for PACS/LAMPS/FSS.
18. To co-ordinate with all stakeholders concerned and provide all necessary support for ensuring implementation of the plan.
19. Any other related matters.
The DCDC shall abide by the guidelines for the
implementation of the plan.
The Department of Co-operation shall be the
convener of the DCDC.
By order and in the name of the Governor of
Goa.
Manuel Barreto, Registrar (Co-operative Societies)
& ex officio Joint Secretary (Co-operation).
Panaji, 18th August, 2023.
————
Order
No. 60/188/MOC/SCDC-DCDC/W-II/HO/RCS/264/1954
Read: 1. Letter No. R-11016/52/2022-CTP dated 17-03-2023 and Letter No. R-11016/28/ /2022-CTP dated 21-06-2023 from Joint Secretary, Ministry of Co-operation, CTP Division, New Delhi.
2. Order No. 60/188/M.O.C/W-II/RCS/359 dated 02-05-2023 issued by Registrar of Co-operative Societies, Panaji, Goa.
Vide above read letter dated 17-03-2023, it is informed that the Union Cabinet in its meetings held on 15-02-2023 has approved the plan for "Strengthening Co-operative movement in the OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 Country and Deepening its reach up to the Grassroots" by setting up new multipurpose PACS or dairy/fishery primary co-operative societies in each uncovered Panchayat/village in the country as the case may be and strengthening existing PACS and dairy fishery co-operatives through convergence of various identified Schemes of Government of India.
In order to ensure smooth and effective implementation of the plan, an Inter-Ministerial Committee (IMC) under the Chairmanship of Hon'ble Union Minister for Co-operation and a National Level Co-ordination Committee (NLCC) under the Chairmanship of Secretary (Co-operation), Government of India has been constituted.
The implementation plan required all the States/ /UTs to constitute State Co-operative Development Committee (SCDC) at the State level and District Co-operative Development Committee (DCDC) in each District in order to ensure implementation of the plan.
Hence, in accordance with the implementation plan, Government had constituted the State Co-operative Development Committee (SCDC) for the State of Goa.
Now, vide above read letter dated 21-06-2023, it is informed that the Union Cabinet in its meeting held on 31-05-2023, has approved the "World's Largest Grain Storage Plan in Co-operative Sector" for creation of various agri infrastructure at PACS level, including warehouses, custom hiring center, processing units, fair price shops, etc. by leveraging the 'whole-of-Government' approach and has further requested to expand the membership of SCDC and DCDC so that the same Committee is able to undertake implementation and monitoring of both the plans, i.e., 'World's Largest Grain Storage Plan in Co-operative Sector' and 'Strengthening Co-operative Movement in the Country and Deepening its reach up to the Grassroots.
Accordingly, Government is pleased to amend the State Co-operative Development Committee (SCDC) constituted vide order No. 60/188/M.O.C./ /W-II/RCS/359 dated 02-05-2023 for the State of Goa as under:
State Co-operative Development Committee (SCDC)
1. Chief Secretary, — Chairperson.
Government of Goa
2. Secretary (Co-operation), — Convener.
Government of Goa
3. Director of Agriculture, — Member.
Government of Goa
4. Secretary (Civil Supplies — Member.
& Consumer Affairs),
Government of Goa
5. Secretary (Animal Husbandry — Member.
& Veterinary Services), Government of Goa
6. Secretary (Fisheries), — Member.
Government of Goa
7. Secretary (Rural Development), — Member.
Government of Goa
8. Additional Secretary (Finance), — Member.
Government of Goa
9. Joint Secretary (Revenue), — Member.
Government of Goa
10. Registrar of Co-operative — Member.
Societies, Government of Goa
11. Representative from National — Member.
Bank for Agriculture & Rural Development (NABARD), Goa Regional Office
12. A Representative from — Member.
Regional Office of National Co-operative Development Corporation (NCDC)
13. A Representative from — Member.
National Dairy Development Board (NDDB)
14. A Representative from National — Member.
Fisheries Development Board (NFDB)
15. Chairman, The Goa State — Member.
Co-operative Bank Ltd., Panaji
16. Chairman, The Goa — Member.
State Co-operative Milk Producers Union Ltd., Curti, Ponda-Goa
17. Representative of — Member.
Warehousing Development & Regulatory Authority (WDRA)
18. Representative of Food — Member.
Corporation of India (FCI), Porvorim-Goa
19. Representative of Central — Member.
Warehousing Corporation (CWC), Verna-Goa
The roles and responsibilities of the State Co-operative Development Committee (SCDC) are as under:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 20231. To ensure that all the Panchayats/Villages in the State are covered by multipurpose PACS or primary dairy/fishery co-operative societies, as the case may be;
2. To review the district-wise action plan for setting up new multipurpose PACS or primary dairy/fishery co-operative societies with a total target of establishing two lakh such societies in the next five years across the country;
3. To extend all necessary support in preparation and updation of National Co-operative Database;
4. To prepare an action plan in co-ordination with NABARD, NDDB, NFDB, NAFSCOB, NCDFI & FISHCOPED to set up State/District Level Federations if not presently existent, as per requirement and viability assessment;
5. To assist in establishing linkages of existing and new primary co-operative societies with State Co-operative Bank and/or their respective District and State Level Federations;
6. To ensure convergence of various Schemes of Government of India at the level of PACS or dairy/fishery primary co-operative societies to make them vibrant economic entities;
7. To provide all necessary policy support for creation of infrastructure at the level of Co-operative Societies, including allotment of Government/Gram Sabha land to PACS;
8. To facilitate PACS/LAMPS/FSS in adoption of Model Bye-laws for diversification of their activities;
9. To assess food grain storage gap, marketable surplus, existing storage facilities, their capacity utilization, etc. in the State up to Block/Panchayat level;
10. To provide necessary Government/Gram Sabha land to PACS/LAMPS/FSS for creation of storage facilities and other agri-infrastructure;
11. To notif y such PACS/LAMPS/FSS as procurement centre for procurement of food grains at Minimum Support Price (MSP);
12. To grant Fair Price Shop (FPS) license to such
PACS/LAMPS/FSS;
13. To assist in establishing linkages of agri infrastructure to be created at PACS/LAMPS/ /FSS with Central/State/Private agencies in co-ordination with all the stakeholders
concerned, to ensure financial viability for PACS/LAMPS/FSS;
14. To regularly monitor and review the progress of the district-wise plans for facilitating the World's Largest Grain Storage Plan in Co-operative Sector, including the Pilot Project;
15. To provide all necessary policy support for creation of infrastructure at the level of PACS/ /LAMPS/FSS;
16. To extend all necessary support and issue requisite directions to District Co-operative Development Committee (DCDC) and review their outcomes for successful implementation of the plan at the grassroots level in a time bound manner;
17. To monitor the progress of implementation of
the action plan at the State Level;
18. Any other related matters.
The SCDC shall abide by the guidelines for the
implementation of the plan.
The Department of Co-operation shall be the
convener of the SCDC.
By order and in the name of the Governor of
Goa.
Manuel Barreto, Registrar (Co-operative Societies)
& ex officio Joint Secretary (Co-operation).
Panaji, 18th August, 2023.
——————
Omkar Co-operative Housing Society Ltd.
–––
FORM-24
(See Rule 111A)
Form of Declaration of Result
Election of Office Bearers of Omkar Co-op.
Housing Society Ltd., Vasco-da-Gama.
In pursuance of powers conferred by sub-section 6 of Section 66 of the Goa Co-op. Societies Act, 2001, I, declare the result of office bearers as follows:
Sr. Name of the candidate Address, contact No. designation numbers & e-mail ID
of the candidate
1 2
3
1. Vinayak Umesh B-4, Omkar Co-op. Hsg. Bandekar, Chairman Society, New Vaddem,
Vasco-da-Gama Mob.: 9860322752 e-mail: vinayak020357 @gmail.com OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 1 2 3
2. Dattatraya Kusha A-4, Omkar Co-op. Hsg.
Savant, Secretary Society, New Vaddem,
Vasco-da-Gama, Mob.: 9423057093 e-mail:mail2dks07 @gmail.com
Ashok V. Ghag, Presiding Officer, Election of
Office Bearers, Omkar Co-op. Hsg. Society Ltd.
New Vaddem, Vasco, 18th August, 2023.
V. No. AP-556/2023.
——————
Department of Education, Art & Culture
Directorate of Art and Culture
–––
Order
No. DAC/5/Admn/376/Prom-Lib/2023/2665
On the recommendation of the Departmental Promotion Committee as conveyed by the Goa Public Service Commission vide Minutes of DPC meeting No. 54/23 (PROMOTION) held on 27-07-2023, Government is pleased to promote Ms. Bernadetta Alzira Desouza to the post of Librarian, Group 'B' Non Gazetted on regular basis in the Pay Matrix Level-6 with Grade Pay Rs. 4,200/- plus usual allowance as admissible under the rules.
The above promotion shall be effective from the date of joining to the post. The officer shall send joining report to the Administration Section of this Directorate. She shall be on probation for a period of 2 years.
Ms. Desouza may exercise an option in terms of Provision of FR 22(I)(a)(1) if she so desired within one month from the date of the issue of this order for fixing her pay in the respective promotional grade.
The expenditure towards pay & allowances shall be debited to the Budget Head 2205—Art & Culture, 00, 105—Public Libraries, 12—District Libraries (Plan), 01—Salaries under Demand No. 43".
By order and in the name of the Governor of
Goa.
Sagun R. Velip, Director (Art & Culture) & ex officio
Joint Secretary.
Panaji, 14th August, 2023.
——————
Directorate of Higher Education
–––
Order
No. ACAD III/GC/CAS/27/2023/4227
Read: No. 8/1/2016-DHE/2765 dated 28-12-2016
On the recommendation of the Screening Committee, Government is pleased to grant Senior Scale (pre- revised Rs. 10,000-325-15200) (revised Rs. 15,600-39,100+AGP Rs. 7,000) and Selection Grade (pre-revised Rs. 12000-420-18300) (Revised Rs. 15,600-39,100+AGP Rs. 8,000) under Career Advancement Scheme of Goa University Statute SA-19 in terms of Goa University Notification No. 2/155/13-Legal/Amend-Stat(New)/ /2013/VolVI/1947 dated 30-06-2010, to the following teaching faculty of the Sant Sohirobanath Ambiye Government College of Arts and Commerce, Pernem-Goa, with effect from the date indicated against his name as under:-
Sr. Name of the Date of eligibility for Date of eligibility for No. Faculty Senior Scale Pre-revised Selection Grade
Rs. 10,000-325-15,200 Pre-revised
Rs. 12,000-420-18,300
1. Dr. Balappa K. Haravi, Assistant 23-12-2010 (i.e. date of 23-12-2010 (i.e. date
Professor in Geography obtaining Ph.D) of obtaining Ph.D).
His pay scale shall be fixed as per the rules in force accordingly.
This supersedes earlier Order No. 8/1/2016-DHE/2765 dated 28-12-2016.
By order and in the name of the Governor of Goa.
Smt. Avelina D'sa E Pereira, Under Secretary (Higher Education).
Porvorim, 17th August, 2023.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023Order
No. ACAD III/GC/CAS/27/2023/4228
Read: No. 5/29/AC/98/-DHE/1844/VOI.11/663
dated 01-06-2017.
On recommendation of the Selection Committee, Government is pleased to revise dates of grant of Associate Professor Scale to Dr. B. K. Haravi, Associate Professor in Geography, Sant Sohirobanath Ambiye Government College of Arts and Commerce, Pernem.
Dr. B. K. Haravi, Associate Professor in Geography, Sant Sohirobanath Ambiye Government College of Art and Commerce, Pernem shall be placed in Associate Professor's Scale (Stage IV) with effect from 23-12-2010 under Career Advancement Scheme of Goa University Statute SA-19 in terms of Goa University Notification No. 2/155/13-Legal/Amend- Stat(New)/2013/volVI/1947 dated 30-06-2010.
His pay shall be fixed as per the existing rules in force. He may exercise an option, if applicable, if he so desires within one month from the date of issue of the order for fixing the pay in the Career Advancement Scheme.
This supersedes earlier order No. 5/29/AC/98/-
DHE/1844/VOI.11/663 dated 01-06-2017.
By order and in the name of the Governor of
Goa.
Smt. Avelina D'sa E Pereira, Under Secretary
(Higher Education).
Porvorim, 17th August, 2023.
2. The grants shall be utilised exclusively for establishment and smooth functioning of 'Goa State Higher Education Council' enacted as per the Goa State Higher Education Council Act of 2018.
3. The grants shall be disbursed as per the Budget provision in the State Budget for the concerned Financial Year or Rs. 5.00 crores for the financial year 2023-2024, Rs. 6.00 crores for 2024- 2025 and Rs. 7.00 crores for 2025-2026.
4. Initially the grants for the first year shall be released in one instalment. However from the subsequent year the release of grants shall be in two instalments on 70:30 basis.
The first instalment of 70% of the Budget allocation shall be released in month of April of the Financial Year and the second instalment of 30% shall be released subject to submission of 50% of utilization of funds disbursed in the first instalment.
5. The grants shall be utilised for achieving the responsibilities and functions of the Council, for payment of salaries and allowances, wages, honorarium, administrative and office expenses, expenditure on various workshops, training, Faculty Development Programmes, implementation of New Education Policy, implementation of various schemes of the Council, software development, maintenance expenditure on building and equipment and other asset and other expenditure as may be required from time to time to fulfil the aims and objectives of the 'Goa State Higher Education Council'. The grants shall also be utilised for procurement of vehicle and expenditure on construction expansion an upgradation of the building with the approval of the Government.
—–––––—
Pattern of Assistance
No. ACAD III/SHEC/Pattern of Assistance/05/ /2022/4229
Sanction of the Government is hereby accorded to the following Pattern of Assistance governing the recurring Grant-in-Aid to 'Goa State Higher Education Council'.
1. The main objective of the Goa State Higher Education Council includes planned and co-ordinated development of Higher Education in the State, promoting Academic excellence and Social Justice by obtaining academic input for policy formulation and prospective planning, ensuring autonomy, accountability and co-ordination of all institutions of Higher Education in the State and guiding the growth of Higher Education in accordance with the Socio-economic requirements of the State.
6. The entire amount of the grant should be utilised only for the purpose for which it is sanctioned.
7. The assets acquired wholly or substantially out of the Government grants shall be the property of the Government. The Grantee shall maintain a register of the permanent and semi-permanent assets created out of the grants. The register shall be maintained seperately in respect of the grants sanctioned and an extract from the register shall be furnished to the Government annually with the audited accounts after the close of the financial year. Register shall be maintained in terms of Form GFR-22 and Form GFR-23. Such assets acquired wholly or substantially shall not be disposed of, encumbered or utilised for purpose other than those for which the grant was given, without prior approval of the Government. Should the Grantee Institution cease to exist at any time, such assets properties shall revert to the Government.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 20238. The account of the Grantee Institution in
respect of this grant shall be audited by the
Government approved Auditor/Chartered
Accountant concerned immediately after the end of
the financial year on completion of six months for
which the grant is sanctioned. The accounts of the
grants shall be maintained separately and in such
a form and manner as prescribed from time to time.
The records shall be open to the Sanctioning
Authority and the Comptroller and Auditor General
of India at any point of time.
9. The Audited statement of accounts showing
the expenditure incurred by the Grantee Institution
from the grants released, duly authenticated by the Competent Authority of the Council and Chartered Accountant, shall be furnished to the Government as soon as possible after the close of the financial year or on completion of six months of the financial year for which the grant is sanctioned.
10. The Grantee Institution shall submit their requirement of funds with supporting details by the end of September in the year preceding the year for which the Grant-in-Aid is sought.
11. A performance-cum-achievement report specifying in detail the achievements made by the Grantee Institution with the Government grants shall be furnished to the Directorate of Higher Education not later than six months after the close of financial year.
12. The Grantee Institution must exercise reasonable economy, observe all financial rules and
regulations as issued by the Government from time
to time while incurring the expenditure.
13. In case of misutilization of grants, the amount
so misutilized shall be recovered from the Grantee
Institution.
14. The Grantee institution shall not increase the
man power without the approval of the Government
which increase its liability on establishment
charges. The pay scales of the staff of the Council
shall be subject to the approval from time to time.
15. The amount shall be drawn from the
Directorate of Accounts on presentation of the bill
in Form GAR-32 duly countersigned by the Drawing
and Disbursing Officer, Directorate of Higher
Education.
16. The grant-in-aid shall be debited to the
Budget Head of Account.
Demand No. 35
2202—General Education;
03—University and Higher Education;
103—Government Colleges and Institution;
02—State Council for Hr. Educ./State Awards
for meritorious College Teachers;
31—Grant-in-Aid.
17. The Pattern of Assistance shall be valid for
the period of 3 years.
18. The Pattern of Assistance to release the grant- in-aid has been approved by the Finance (Exp.) Department under U. O. No. 3986/F dated 06-08-2023.
By order and in the name of the Governor of
Goa.
Avelina D'sa E Pereira, Under Secretary (Higher
Education).
Porvorim, 17th August, 2023.
——————
Department of Home
Home—General Division
–––
Order
No. 24/31/2014-HD(G)/Part II/2189
Read: Memorandum No. 24/31/2014-HD(G)/Part II/
1477 dated 31-05-2023.
On the recommendation of the Goa Public Service Commission as conveyed vide their letter No. COM/I/5/58(1)/2021/66 dated 28-04-2023, the Governor of Goa is pleased to appoint Shri Amey Pundalik Barad to the post of Assistant Public Prosecutors (Group 'A' Gazetted) on temporary basis in the Directorate of Prosecution in Level-10 of the pay matrix with immediate effect.
The pay of the above candidate will be fixed in accordance with CCS (Revised Pay) Rules, 2016. The appointment will be further subject to the following conditions:-
a) The above candidate has been declared medically fit by the Medical Board and his character and antecedents has been verified.
b) The above candidate shall be on probation for a period of two years with effect from his date of joining.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023c) The pay and allowances of the above candidate shall be debited to the Budget Head controlled by the Directorate of Prosecution wherever he is posted from time to time.
d) The above candidate shall join his duties
in the Directorate of Prosecution with immediate effect.
By order and in the name of the Governor of
Goa.
Diksha N. Tari, Under Secretary (Home-II).
Porvorim, 14th August, 2023.
——————
Department of Industries
–––
Order
No. 5/4/2020-IND/Part/186
The Government is pleased to constitute a Committee of the following members for implementation of "One Taluka One Product" an initiative of State Government to strengthen the domestic industries in line with the vision of "Atmanirbhar Bharat" and "Swayampurna Goa".
1. Director of Industries, — Chairperson.
Trade & Commerce of the Committee
2. Collector (North Goa) — Member.
3. Collector (South Goa) — Member.
4. Director of Agriculture — Member.
5. Director, Handicrafts, — Member.
Textile & Coir
6. Member Secretary, Goa — Member.
State Biodiversity Board
7. Director of Science & — Member.
Technology
8. Deputy Director (Industries) — Member
Secretary.
The terms of reference of the Committee are as
follows:-
• The Committee shall identify agricultural/ /handicrafts/textile products/products of cultural significance from each taluka of the State.
• The Committee will work on the constraints
faced by the producers/artisans of the product.
• The Committee shall help and provide support
to promote the product as identified.
By order and in the name of the Governor of
Goa.
Vivek Naik, Under Secretary (Industries).
Porvorim, 17th August, 2023.
——————
Department of Law & Judiciary
Law (Establishment) Division
–––
Order
No. 2/65/2016-LD(Estt)/1388
The Government of Goa is pleased to order the transfer and posting of the Civil Registrar-cum-Sub Registrars, Group 'B' Gazetted Officer of Registration Department, in public interest, with immediate effect:-
Sr. No. Name of the Official Present place of posting Place of posting on transfer
1. Smt. Malini P. Sawant Holding charge of Civil-Registrar- Civil Registrar-cum-Sub
-cum-Sub Registrar, Sattari Registrar, Sattari.
The above Officer shall draw her pay and allowances against the above place of posting from the date
of acceptance of post i.e. 23-06-2023 b.n.
By order and in the name of the Governor of Goa.
Amir Y. Parab, Under Secretary (Law-Estt.).
Porvorim, 17th August, 2023.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023Mormugao Port Authority
–––
Notification
Goa, on the 31st day of the Month of May, 2023
No. PPP/1/2023/Berth No. 7— In exercise of the powers conferred by Section 27 of the Major Port Authorities Act, 2021, the Mormugao Port Authority, Goa (MPA) hereby disposes of the representation dated 20-07-2021 received from the Adani Murmugao Port Terminal Private Limited (AMPTPL) as in the Order appended hereto;
and
an
In exercise of the powers conferred by Section 27 of the Major Port Authorities Act, 2021 and in pursuance of Ministry of Shipping Letter No. PD-13/1/2018-PPP Cell dated 11 July, 2018 on Stressed PPP Projects, the Mormugao Por t Authority, Goa hereby disposes of the proposal dated 21-10-2022 and 16-04-2023 for rationalization of storage charge at Berth No. 7 operated by Adani Murmugao Port Terminal Private Limited as in the Order appended hereto.
MORMUGAO PORT AUTHORITY
Case No. PPP/1/2023/Berth No. 7
Adani Murmugao Port Terminal Private Limited (AMPTPL)… Applicant
Order
(Passed on this 31st day of May, 2023)
SCALE OF RATE (SoR) FOR COAL TERMINAL AT MORMUGAO PORT AUTHORITY
1.1. This Authority received a representation dated 21-10-2022 from the Adani Murmugao Port Terminal Private Limited to increase free period from present 15 days to 25 days and correct the storage charges approved in the tariff Order No. TAMP/23/2008-MOPT dated 07 August, 2008 notified in the erstwhile name of Mormugao Port Trust (MOPT) followed by AMPTPL proposal dated 16-04-2023 on the same subject of its representation dated 20-07-2021. Their presentation dated 20-07-2021 of AMPTPL also claimed that the AMPTPL's Berth No. 7 at MOPT qualified as a Stressed PPP Project in terms of the criteria established by the Stressed PPP Guidelines issued by the Ministry of Shipping (MOS) in the Government of India, entitling it to a rationalization of storage charges as prescribed procedures given below.
1.2. Ministry of Shipping (MoS) vide letter dtd. 11-07-2018 has directed to all Major Ports to adopt the prescribed procedures for classification of a PPP project as " Stressed Project" including review of the situation periodically for optimum utilization of the facility created. The Committee constituted by MoS had recommended the following three criteria for classification of PPP Project as " Stressed Project" .
(i) The project is sub-opt imal ly ut i lized as evi denced by t he act ual cargo handl ed by t he operat or during t w o preceding financial years being less t han 70% of t he project ion as per DPR/Feasibility report forming part of the bid document; and
(ii) Project SPV incurring cash loss continuously for two preceding financial years; and
(iii) The losses incurred by Concessionaire has caused at least 50% erosion of it s peak Net Worth during the operation period.
The Committee (MoS) suggested the following options for the post classification as a stressed project.
a) Further it stated that, if the PPP Project falls under the category of " Stressed Project" and an issue of abnormal storage charges arise, in such projects, then the Ports may approach TAMP under the provisions of Article 21.9 "Amendments, Modifications or alterations" of the CA with the proposal for rationalization of storage charges in consultation with the Concessionaire so as to achieve the Annual Revenue Requirement (ARR) as per TAMP Guidelines/Notifications.
b) MoS also directed to make the DBFOT terminals competitive by proposing rationalization of storage charges levied by extending the free period depending on the local conditions with a view to optimize the capacity utilization of the berth with periodical review duly ensuring the following.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023(i) No storage charges and hence no Royalty if cargo is cleared within the free period as per executed Concession Agreement.
(ii) If the cargo is cleared after the expiry of free period as per executed CA but within the extended free period, no storage charges will be payable, but the Concessionaire shall pay Royalty equal to 1% of the ARR; and
(iii) If the cargo is cleared after the extended free period, then the Concessionaire shall pay Royalty equal to quoted percentage on actual storage charges recovered or 1% of ARR whichever is higher, for the period beyond the extended period.
c) The Ministry also directed the Major Ports to periodically review the situation of Stressed Projects for optimum utilization of the facility created.
1.3. This Authority also received a proposal dated 21-10-2022 from AMPTPL for rationalization of storage charges at Berth No. 7 for the year 2021-22 in pursuance of MOS Letter No. PD-13/1/2018-PPP Cell dated 11th July, 2018 on Stressed PPP Projects. Since the representation dated 21-10-2022 and the proposal dated 16-04-2023 received from AMPTPL towards rationalization of storage charges at Berth No. 7 operated by AMPTPL, a common Order is passed as in hereunder.
2.1 The Tariff Authority for Major Ports(TAMP) had notified upfront tariff for Development of Coal handling terminal at berth No.7 at MPA on DBFOT basis vide Order No. TAMP/23/2008-MOPT dated 07 August, 2008 which was notified in the Gazette of India on 20 August, 2008 vide Gazette No. 141. The MPT awarded the project to Adani Murmugao Port Terminal Private Limited (AMPTPL). Based on the proposal of AMPTPL, TAMP notified the Scale of Rates after indexation in the name of AMPTPL vide Order No. TAMP/13/ 2014-MOPT dated 04th July, 2014. The said Order was notified in the Gazette of India on 25th July, 2014 vide Gazette No. 224.
2.2 The relevant extracts of storage charges schedule and relevant Note (i) prescribed in the upfront tariff Order dated 7 August, 2008 and in the tariff Order dated 4 July, 2014 notifying SOR in the name of AMPTPL are given below:
(i). Order No. TAMP/23/2008-MOPT dated 7 August, 2008:
"4. Storage Charges:
The Storage charges for the cargo stored in the stack yard beyond the free period shall be as below:
(Rate in Rs. per tonne per day or part thereof)
Sr. Commodity Rate for five days for Rate for sixth day to Rate for the Eleventh the balance cargo tenth day for the day onwards for the No. remaining after the balance cargo balance cargo
free period
1 2 3 4 5
1. Coal (all types) 12 24 48
Note: (i). Fifteen free Days shall be allowed, after complete discharge of vessel's cargo. For the purpose of calculation of free period, customs notified holidays and Terminal's non- working days shall be excluded.
(ii). Order No.TAMP/13/2014-MOPT dated 4 July 2014 [After Indexation]:
"4. Storage Charges:
The Storage charges for the cargo stored in the stack yard beyond the free period shall be as below:
(Rate in Rs. per tonne per day or part thereof)
Sr. Commodity Rate for five days for Rate for sixth day to Rate for the Eleventh the balance cargo tenth day for the day onwards for the No. remaining after the balance cargo balance cargo
free period
1 2 3 4 5
1. Coal (all types) 15.79 31.58 63.16 OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 • Note: (i). Fifteen free Days shall be allowed, after complete discharge of vessel's cargo. For the purpose of calculation of free period, customs notified holidays and Terminal's non working days shall be excluded.
3.1 The submissions made by AMPTPL in its representation dated 20-07-2021 to this Committee for rationalization of storage charge approved by this Authority vide Order dated 07 August, 2008 notifying the Scale of Rates in the name of MOPT are summarized below:
1. AMPTPL could not handle cargo up to its designed capacity due to various reasons such as
a. Punitive charges by way of storage rent are prohibiting in attracting customers.
b. Dispatches of cargo through road are restricted by various authorities by time to time by frequent restrictions from GSPCB & MMC.
c. Competing Ports are offering free storage period ranging from 45 to 60 days with nominal storage charges.
The details of the cargo handled during the preceding two Financial Year are as below.
Financial Projected Cargo Cargo Handled Year as per DPR
in MMT
1 2
3
2019-20 7.5 2020-21 7.5
4.00 3.74
2. AMPTPL is running with huge losses since commencement of commercial operation. Cash Loss incurred by AMPTPL during the preceding two financial years i.e. FY 2019-20 and 2020-21 duly certified by statutory auditor.
3. Year wise net loss incurred by AMPTPL during the preceding two financial years i.e. FY 2019-20 & 2020-21 duly certified by our statutory auditor.
4. Proposed 4 Lane Port connectivity highway which was planned in FY 2010 to facilitate faster evacuation of cargo are still not been operational. This has compelled vehicle to move through city roads causing in serious impact on truck turn around time and thereby evacuation.
4.1. M/s. AMPTPL has referred MOS letter dated 11 July, 2018 issued to all Major Port Trusts on Stressed PPP Projects and it has discussed about consideration of AMPTPL project as Stressed PPP Project in pursuance of the said MOS letter, and claimed that AMPTPL's berth No. 7 at MOPT qualifies as a stressed PPP project, entitling it to a rationalization of storage charges as per the criteria set by stressed PPP Guidelines as brought out in an earlier paragraph.
4.2. MOS vide letter No. PD-13/1/2018-PPP Cell dated 11 July, 2018 addressed to all Major Port Trusts including MOPT has evolved a mechanism to rationalize storage charge for stressed PPP project. Para 6 of the said letter states that whenever issue of abnormal storage charges emerges in stressed projects as defined in the said MOS letter, the Ports may approach TAMP under the provisions of "Amendments, modification or alternations" to the terms and conditions of the concession agreement with an appropriate proposal for rationalization of storage charges in consultation with concessionaires so as to achieve the ARR as per the TAMP guidelines/notification. TAMP has to consider such proposals on merit. The Committee also recommended review of the situation by the Concessioning Authority periodically for optimum utilization of the facility created.
4.3. As per Major Port Authorities Act, 2021, Mormugao Port Authority (MPA) will dispose the said application through approval of the Board of Mormugao Port Authority. Accordingly, the said proposal of AMPTPL was circulated vide letter No. CME/PROJ/34/2023/00556 dated 09-05-2023 for consultation process, to all the concerned users/user organizations.
5.1. The subject project was awarded to M/s. Adani Murmugao Port Terminal Pvt. Ltd., (AMPTPL) the Concessionaire, at Port of Mormugao, Goa. The project is operational w.e.f. 06-06-2014. The Upfront tariff and indexed SOR for the project has been notified by TAMP Vide Order No. TAMP/13/2014-MOPT dtd. 04-07-2014 for berth hire charges, cargo handling charges, storage charges and miscellaneous charges.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 20235.2 AMPTPL had made an application dated 20-07-2021 to Mormugao Port Authority, Goa, that their project is being operated in stressed condition due to various reasons including storage charges.
5.3 Ministry of Shipping vide Letter No. PD-13/1/2018-PPP Cell dtd. 11-07-2018 has directed all Major Ports and TAMP to adopt the procedure contained therein including the review of the situation periodically for optimum utilisation of the facility created. In response to MoS letter dtd. 11-07-2018, AMPTPL submitted above request vide letter dated 20-07-2021 to consider project as Stressed by giving the below mentioned reasons for project being stressed.
i. The dispatches of cargo through road are restricted by various authorities by time to time like frequent restriction from GSPCB and MMC and in time MPA citing various reasons.
ii. Proposed 4-Lane Port connectivity highway which was planned in FY 2010 to facilitate faster evacuation of cargo are still not been operational. This has compelled vehicles to move through city roads causing in serious impact on truck turn around time and thereby evacuation.
iii. Competing Ports are offering free storage period ranging from 45 to 60 days with nominal storage charges.
5.4 AMPTPL has given the details of cargo handled during the preceding 2 years and financial audited report for FY 2019-20 & 2020-21 certified by their statutory auditor. AMPTPL has proposed the free days for storage of cargo as 25 days at their terminal.
6.1 A Committee was constituted by the Mormugao Port Authority (MPA), headed by the Dy. Chairman and comprising of TM, FA & CAO, CME & CE.
6.2 The Committee met on 13-06-2022, and observed that, the actual cargo handled in the two preceding years i.e. 2019-20 and 2020-21, is sub-optimally utilized with 59% and 54% respectively as against 70% of the Criteria 'a'. The same has been certified by Traffic Department. AMPTPL vide letter dtd. 20-07-2021, has enclosed the report of M/s. Deloitte Haskins & Sells LLP, the statutory auditor wherein they have certified the cash loss (Criteria 'b') and net worth (Criteria 'c') for the financial year 2019-20 and 2020-21 as given below.
FY Cash (Loss)
Net worth
1 2
3
2019-20 Rs. (63.72) Crores Rs. (219.99) Crores. 2020-21 Rs. (7.81) Crores Rs. (259.85) Crores.
6.3 The Port had appointed M/s. D.K. Chhajer & Co. Chartered Accountants as an Independent Auditor for conducting the Special Audit on AMPTPL Accounts for FY 2020-21. The Committee observed that the project meets all the criteria for qualification as a stressed project for the FY 2021-22 as per the guidelines of the Ministry of Shipping based on data pertaining to FY 2019-20 and 2020-21, as evidenced in the Special Audit Report of M/s. D.K. Chhajer & Co. Chartered Accountants dated 28-01-2022.
The details for classification of a PPP Project as 'Stressed Project' as per MoS are given below as ready reference.
Sr. Criteria for classification of a PPP FY 2019-20 FY 2020-21 No. Project as 'Stressed Project"
1 2
3 4
1. Criteria-'a'
Project is sub-optimally utilized as evidenced 59% 54% by the actual cargo handled by operator during the two preceding financial years being less than 70% of the projection as per the DPR/Feasibility Report forming part of the bid document
2. Criteria-'b'
Project SPV incurring Cash loss continously Rs. (-) 5.06 Cr. Rs. (-) 7.85 Cr. for two preceding financial years OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 1 2
3 4
3. Criteria-'c'
The losses incurred by Concessionaire has caused 353% 399% atleast 50% Erosion of its Peak Net worth during the Operation Period
6.4 The request of the Concessionaire were put up to the Board of Mormugao Port Authority in its meeting held on 07-09-2022 for review and deliberations. The Board vide resolution No. 68 of 07-09-2022 resolved that
i. To consider PPP project at Berth No. 7 as stressed, for the Financial Year 2021-22.
ii. To submit a detailed proposal by the Concessionaire to the Board of Mormugao Port Authority in this regard, duly justifying the reasonableness of increasing the storage period from the existing 15 days, as per the TAMP guidelines for a Coal Handling Terminal.
iii. To place the proposal regarding increasing the free time for storage of cargo from the existing 15 days as stipulated in the Concession Agreement before the Board for discussions and approval based on the assessment of actual dwell time of the terminal.
iv. The said proposal shall be valid for a period of one year and may be reviewed after a period of one year.
6.5 The Board Resolution was communicated to AMPTPL. In response, M/s. AMPTPL submitted a detailed proposal vide their letter No. AMPTPL/2022/888 dtd. 21-10-2022, for rationalisation of storage charges duly enhancing the free period from 15 days to 25 days and to amend the storage charges as notified by MPA for the FY 2020-21 as communicated vide Section 4 of MoS letter dtd. 11-07-2018.
6.6 The Committee met again on 02-03-2023 to discuss issue of free days for storage of cargo. As per TAMP notified SOR dated 04-07-2014, the free days for storage cargo is stipulated as 15 days. The Committee found that AMPTPL request for increase in free days for storage of cargo as 25 days, is in line with the TAMP guidelines communicated vide letter No. PR-14019/25/2007-PG dt. 12-02-2008, for upfront tariff setting for PPP Projects at Major Port Trusts, for a Coal handling terminal.
6.7 The Committee also observed that, as per data provided by AMPTPL regarding details of the storage period of the vessels handled at Berth No.7, during the FY 2020-21, 18 vessels out of 67 vessels have exceeded storage period more than 25 days. It may be noted that 49 vessels out of 67 vessels have been cleared within 25 days.
6.8 The Committee requested to consider the proposal submitted by AMPTPL for rationalisation of storage charges as envisaged and notify the same, to avoid diversion of cargo to the neighbouring private port and to attract additional volumes so that the capacity utilization of the facility can be improved. The Committee further stated that Mormugao Port Authority shall review the proposed rationalisationof storage charges after one year of notification.
6.9 The request of the Concessionaire were put up to the Board of Mormugao Port Authority, in its meeting held on 23-03-2023 for review and deliberations. The Board vide resolution No. 132 of 23-03-2023 resolved and considered the request of M/s. AMPTPL to increase the free period for storage of cargo, from the existing 15 days to 25 days, for Coal Handling Terminal at Berth No. 7 of Port of Mormugao, Goa, for the F.Y. 2021-22 and to obtain the proposal from M/s. AMPTPL, duly justifying the reasonableness of increasing the storage period, for rationalisation of storage charges.
6.10 Port vide letter dated 12-04-2023 informed decision of the Board to increase the free period for storage of cargo, from the existing 15 days to 25 days, for Coal Handling Terminal at Berth No.7 of Port of Mormugao, Goa, for the F.Y. 2021-22. Port requested M/s. AMPTPL to submit the proposal for rationalization of storage charges to the Port's Scale of Rates Committee for further consideration. M/s. AMPTPL vide letter dated 16-04-2023 submitted the proposed storage charges after applying the applicable indexation factor for the FY 2021-22. Port vide letter dated 09-05-2023 has circulated the proposal of M/s. AMPTPL to the concerned users/user organizations, who are stakeholders to be consulted for this proposal.
6.11 The comparative position of the existing tariff, proposed tariff and the royalty in respect of storage charges by M/s. AMPTPL is presented below for amendment w.e.f. 01-04-2021 for the FY 2021-22:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023(Rate in Rs. per tonne per day or part thereof)
Storage Existing Storage Proposed Storage Royalty payable as Days Charges applicable Charges from per MOS letter for the year 01-04-2021 to 31-03-2022 No. PD-13/1/2018-PPP 2021-22 after applicable by AMPTPL Cell dated 11 July, 2018 indexation
1
2 3
4
Storage Charges Nil No charges Nil. (0-15 days)
Storage Charges 17.22 No charges 1% of ARR from Storage (16-20 days)
charges at Rs. 85.28 lakhs estimated in August 2008 Order and after applicable indexation.
Storage Charges 34.44 No charges 1% of ARR from Storage (21-25 days)
charges i.e. Rs. 85.28 lakhs estimated in August 2008 Order and after applicable indexation.
Storage Charges (31 to 35 days)
Storage Charges 68.87 2.95 20% of actual storage charges recovered or 1% of ARR (26 to 30 days) from Storage charges i.e. 4.42 Rs. 85.28 lakhs estimated in August 2008, after indexation, whichever is
5.91 higher.
Storage Charges (36th day onwards)
7.1. AMPTPL vide letter No. AMPTPL/2022/888 dated 21-10-2022 has submitted amended proposal as given below, for considering AMPTPL as stressed project for FY 2021-22.
1. "We refer to the captioned Concession Agreement dated 22 September, 2009 ("the CA") between Mormugao Port Authority and Adani Mormugao Port Terminal Pvt. Ltd., ("AMPTPL") for Coal Handling Terminal at Berth No. 7 in the Port of Mormugao ("MPA") on Design, Build, Finance, Operate and Transfer Basis ("the Project").
2. We further refer to the Upfront Tariff notified for the Project by the Tariff Authority for Major Ports ("TAMP") vide Order dated 07 August, 2008 in Case No. TAMP/23/2008 (notified in Gazette No. 141 dated 20 August, 2008) ("Upfront Tariff") and to the Scale of Rates notified by TAMP for the facility designed and built by AMPTPL vide Order dated 04 July, 2014 in Case No. TAMP/13/2014 (notified in Gazette No. 224 dated 25 July, 2014) ("SOR").
3. We refer to the Stressed PPP Projects Guidelines notified by the Ministry of Shipping, Government of India vide Letter No. PD-13/1/2018-PPP Cell dated 11 July, 2018 ("Stressed PPP Guidelines").
4. We refer to our letter No. AMPTPL/2021-22/659 dated 20-07-2021 ("Stressed Project Application"), whereby we had requested that the Coal Handling Terminal at Berth No. 7 at MPA be considered to be a Stressed PPP Project under the Stressed PPP Guidelines.
5. Lastly, in this connection, we refer to the MPA Letter No. CME/PROJ/34/2022/1021 dated 03-10-22 whereby the MPA has communicated that the Board of Trustees for the MPA has decided to favorably consider the Stressed Project Application for the financial year 2021-22; and ordered to submit a proposal for the rationalization of storage charges along with the justification for the reasonableness.
6. As is apparent from the facts, data and information provided in the Stressed Project Application, the Upfront Tariff and SOR provide for a free storage period of 15 days (in contrast with 25 days in the Upfront Tariff Guidelines, 2008 notified by TAMP) on the basis of an assumed plot turnover ratio of 20 that is inherently dependent on the cargo evacuation infrastructure available to the terminal Operator. It is a matter of record that the cargo evacuation infrastructure available to AMPTPL's Coal Handling Terminal at Berth No. 7 at MPA is woefully inadequate as the flyover and 4-lane highway connectivity which was promised by MPA to be OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 completed in 2010 are yet to be delivered, and there are restrictions imposed by the Goa State Pollution Control Board ("GSPCB") on the movement of coal cargo on trucks except during the narrow window between 10 p.m. and 6 a.m. It is thus observed that the average dwell time is around 30 days. As per TAMP guidelines storage charges free period of 25 days is fixed, hence we propose to increase free storage period from existing 15 days to 25 days. The brief working of vessels along with dwell time for FY 21-22 is enclosed herewith as "Annexure".
7. As a result of the low capacity of the cargo evacuation infrastructure leading to higher dwell times, and the low free storage period notified in the Upfront Tariff and SOR, the notional storage charges based on the SOR work out to much higher than the envisaged 1% of Annual Revenue Requirement (ARR) as provided by the Upfront Tariff Guidelines, 2008. In fact, the notional Storage Charges work out, in several cases, to be much higher than the Cargo Handling Charges as per the SOR! Unsurprisingly, AMPTPL has never been able to charge or recover any Storage Charges since inception till date, for the reason that the Storage Charges under the Upfront Tariff and SOR are not commercially viable and if AMPTPL were to levy Storage Charges as per the SOR, the cargo handling business would simply move away from MPA to other competing ports.
8. Faced with a severely constrained cargo volumes (which were abysmally low when compared to the projections in the Detailed Project Report dated 12 March 2010 ("DPR") and the facilities constructed and built by AMPTPL) and coupled with a high cost of borrowed capital for an escalated actual Project Cost which has not yet been compensated to AMPTPL, AMPTPL began incurring substantial operating and cash losses in each year, such that by 31 March, 2018, more than 100% of its net worth had been wiped out.
9. It is in this background that AMPTPL had made the Stressed Project Application. It remains AMPTPL's position that it fully meets all objective criteria established under the Stressed PPP Guidelines, including but not limited to the following:
i) Sub-optimal utilization of the project facilities, as evidenced by the actual cargo handled by AMPTPL during two preceding financial years, namely 2020-21 and 2021-22, being less than 70% of the projection as per DPR/Feasibility report forming part of the bid document;
ii) AMPTPL incurring cash loss continuously for two preceding financial years, namely 2020-21 and 2021-22; and
iii) The losses incurred by AMPTPL have caused at least 50% erosion of its peak Net Worth during the operation period.
10. AMPTPL has not been able to achieve the proposed ARR through realization of tariff. The tariff cap for different individual services is therefore, to be set appropriately by TAMP so as to enable AMPTPL to achieve the ARR determined as per Clause 3.8.2 of the Upfront Tariff Guidelines, 2008.
11. The commercial unviability of the Upfront Tariff and SOR for the Coal Handling Terminal at Berth No. 7 is also highlighted by the fact that as against the TAMP-notified 16% Return On Capital Employed ("ROCE"), AMPTPL has had a negative ROCE, as per AMPTPL's audited books of accounts for the 5 years preceding 2020-21 is set out below:-
Sl. Year Volume of Cargo Handling Operating Cost Return on No. Cargo Handled Revenue (Rs. Crores) Capital Employed
(MT) (Rs. Crores)
1 2 3 4 5 6 1. 2014-15 860,339 20.72 10.08 -28.18 2. 2015-16 1,812,324 44.42 22.58 -49.78 3. 2016-17 1,959,252 48.08 26.45 -7.85 4. 2017-18 1,122,377 27.72 17.83 -49.62 5. 2018-19 4,248,719 112.42 116.63 -103.38 6. 2019-20 4,000,641 107.50 112.56 -96.12 7. 2020-21 3,743,778 97.28 105.13 -39.89 8. 2021-22 4,042,998 103.33 107.40 -42.62
12. It is indisputable that AMPTPL meets all objective criteria for being declared a Stressed PPP Project within the meaning assigned to the said term under the Stressed PPP Guidelines, and as a corollary, OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 AMPTPL qualifies for rationalization of the Tariff and SOR for the Coal Handling Terminal at Berth No. 7 of MPT. This has also been confirmed by MPT vide its letter dated 03 Oct., 2022.
Guidance on Tariff Rationalization from the Upfront Tariff Guidelines, 2008 read with the Stressed PPP Guidelines
13. As per the Annexure III of the Upfront Tariff Guidelines, 2008 the norms for apportionment of the ARR is as follows.
Tariff Group Percentage of Total revenue allocated
1
2
Coal Handling Charges 98
Storage Charges
1
Miscellaneous Charges 1
14. For the identified stressed assets, the Stressed PPP Guidelines recommends the extension of the free storage period with a view to optimize the capacity utilization of the berth. In making this recommendation, the Stressed PPP Guidelines also note the following points, all of which apply to AMPTPL's case since commencement of cargo operations:-
(a) The norm fixed by TAMP (in the Upfront Tariff Guidelines, 2008) anticipating 1% revenue towards storage charges out of gross revenue from handling charges was based on certain assumptions regarding the dwell time of cargo, which may change based on factors such as availability of rakes, storage space at importers premises, etc.;
(b) As a result of higher and telescopic storage charges, cargo handling migrates away to non-major ports that offer higher free time and as a result, the income generation from the projects come down, making them unviable.
(c) The higher storage charges and resultant diversion of cargo handling business to non-mechanized facilities defeats the very objective of the PPP projects for mechanization of cargo berths at major ports.
15. Accordingly, we had requested MPA to increase the free period (which is currently 15 days as per the Upfront Tariff, and as adopted in the CA). The MPA got a Special Audit for AMPTPL conducted by M/s. D S Pawooskar & Co. and D.K Chhajer for Financial Year 2019-20 & FY 2020-21 respectively and on consideration of the Special Audit Report along with the Report made by AMPTPL's Statutory Auditors, M/s. Deloitte Haskins & Sells LLP, affirmatively concluded that AMPTPL qualifies as a Stressed PPP Project under the Stressed PPP Guidelines.
AMPTPL's Proposal for Tariff Rationalization for 2021-22
16. AMPTPL agrees and undertakes to comply with the Stressed PPP Guidelines such that:
a) No Storage charges and hence no Royalty if cargo is cleared within the free period as per executed CA (i.e. 15 days free period).
b) If the cargo is cleared after the expiry of free period as per the executed CA but within the extended free period, no storage charges will be applied but AMPTPL shall pay Royalty equal to 1% ARR to MPA; and
c) If the cargo is cleared after extended free period (i.e. beyond 25 days), AMPTPL shall pay Royalty equal to quoted % on actual storage charges recovered or 1% of ARR whichever is higher for the period beyond the extended period.
17. It is pertinent that AMPTPL continues to meet the objective criteria under the Stressed PPP Guidelines in Financial Year 2021-22, and the data and Auditor's Reports in this behalf have already been provided to MPA.
18. Now, therefore, we, the Concessionaire, AMPTPL, do hereby apply for the rationalization of SOR and a suitable amendment to the CA w.e.f. 01 April, 2021 for the Financial Year 2021-22.
19. Accordingly, in light of our current request, the SOR may be amended and the table at Para 4 of the Schedule to the SOR be substituted w.e.f. 01 April, 2021 for the Financial Year 2021-22 as follows which is already notified by TAMP for the FY 2019-20 & MPA notified for the FY 2020-21:
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023Rate in Rs. Per Ton or Part Thereof
Sl. Storage Existing Storage Proposed Storage Royalty payable as No. Days Charges applicable Charges from per MOS letter
for the year 01-04-2021 till 31-03-2022 No. PD-13/1/2018-PPP
indexation
2021-22 after applicable Cell dated 11 July, 2018 and as given by MOPT for the year 2021-22
1 2 3 4 5
1. Storage Charges Nil No charge Nil.
(0-15 days)
(16-20 days)
2. Storage Charges 17.22 No charge 1% of APR from Storage charges at Rs. 85.28 lakhs estimated in August 2008 Order and after applicable indexation.
(21-25 days)
3. Storage Charges 34.43 No charge 1% of APR from Storage charges i.e. Rs. 85.28 lakhs estimated in August 2008 Order and after applicable indexation.
(26-30 days)
5. Storage Charges
(31-35 days)
4. Storage Charges 68.87 2.95 20% of actual storage charges recovered or 1% of ARR from Storage charges i.e. 4.42 Rs. 85.28 lakhs as per Order dated 07-08-2008 after indexation, whichever 6. Storage Charges
5.91 is higher.
(36th day onwards)
i. Twenty five free days shall be allowed, after complete discharge of vessel's cargo. For the purpose of calculation of free period, customs notified holidays and Terminal's non-working days shall be excluded.
ii. Storage charges shall be payable for all days including Terminal's non-working days and customs notified holidays for stay of cargo beyond the prescribed free days.
iii. Storage charge on cargo shall not accrue for the period when the terminal operator is not in a position to deliver/ship the cargo when requested by the user due to reasons attributable to the terminal operator.
iv. The above storage schedule shall be valid for a period of one year of 2021-22 i.e. from 1 April, 2021 till 31 March, 2022.
20. Hence we request your good office to issue an order as issued in last year which will be effective for a period of one year (i.e. from 01-04-2021 till 31-03-2022).
8.1. AMPTPL vide letter dated 16-04-2023 submitted amended storage charges with applying the indexation factor of 0.33% announced by the Tariff Authority for Major Ports for the financial year 2021-22 are as given below.
Rate in Rs. Per Ton or Part Thereof
Sl. Storage Existing Storage Proposed Storage Royalty payable as No. Days Charges applicable Charges from per MOS letter
for the year 01-04-2021 till 31-03-2022 No. PD-13/1/2018-PPP 2021-22 after applicable Cell dated 11 July, 2018
indexation
and as given by MPA for the year 2021-22
1 2 3 4 5
1. Storage Charges Nil No charge Nil.
(0-15 days) OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 1 2 3 4 5
(16-20 days)
2. Storage Charges 17.22 No charge 1% of ARR from Storage charges at Rs. 85.28 lakhs estimated in August 2008 Order and after applicable indexation.
(21-25 days)
3. Storage Charges 34.44 No charge 1% of ARR from Storage charges i.e. Rs. 85.28 lakhs estimated in August 2008 Order and after applicable indexation.
(26-30 days)
5. Storage Charges
(31-35 days)
4. Storage Charges 68.87 2.95 20% of actual storage charges recovered or 1% of ARR from Storage charges i.e. 4.42 Rs. 85.28 lakhs as per Order dated 07-08-2008 after indexation, whichever is 6. Storage Charges
5.91 higher.
(36th day onwards)
9.1 The Board vide Resolution No. 20 of 10-02-2022 resolved to form the Committee of HOD's headed by Dy. Chairperson to deal with all Scale of Rates (SOR) and PPP issues related to Stressed Project pertaining to MOPA as per The Major Port Authorities Act, 2021. Accordingly, the Committee of HOD's headed by Dy. Chairperson, evaluated the proposal of M/s. AMPTPL.
9.2 Mormugao Port Authority (MPA) will have to dispose the said application through Board of Authority of Port of Mormugao as per Major Port Authorities Act, 2021. Accordingly, the said proposal of AMPTPL was circulated for consultation process to all the concerned users/user organisations.
9.3 Mormugao Port Authority (MPA) vide letter dated 09-05-2023 intimated to all the concerned users/ /user organisations for consultation process held through video conferencing on 16-05-2023 at 11.00 hrs.
10.1. The prescribed consultation process with stake holders including AMPTPL was initiated to have participative approach and to give an opportunity of hearing to the concerned parties and accordingly all the concerned users/user organisations intimated vide our letter dated 09-05-2023.
10.2. In accordance with the consultative procedure prescribed, the proposal of MPA was forwarded vide our letter dated 09-05-2023 to the concerned users/user organisations seeking their comments.
10.3 A joint hearing in this case was held on 16-05-2023 through video conferencing. At the joint hearing, AMPTPL and users/user organizations have made their submissions.
M/s. Adani Murmugao Port Terminal Pvt. Ltd.
(i) M/s. Adani Murmugao Port Terminal Pvt. Ltd., Capt. Jeyaraj Thamburaj made following submission before the Port Authority.
Sl. Storage Existing Storage Charges Proposed Storage Charges No. Days applicable for the year 2021-22 from 01-04-2021 to 31.03.2022
after applicable indexation
1 2 3 4 1. Storage Charges (0-15 days) Nil No charge 2. Storage Charges (16-20 days) 17.22 No charge 3. Storage Charges (21-25 days) 34.44 No charge 4. Storage Charges (26-30 days) 68.87 2.95 5. Storage Charges (31-35 days) 4.42 6. Storage Charges (36th day onwards) 5.91
(ii) AMPTPL has proposed free period of 25 days for storage of cargo.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023-Adani Enterprises Ltd. (AEL)
During joint hearing, AMPTPL informed that, Adani Enterprises Ltd. (AEL) would not attend the meeting but, offer their comments through letter. Accordingly, AEL vide letter dtd. 17-05-2023, forwarded vide AMPTPL email dated 20-05-2023, submitted their comments as given below:
AEL handles the power plants and other customers coal requirement, through AMPTPL. The following are issues faced by them in discharging customers to utilize Berth No. 7 at MPA for coal imports.
(i) Free storage period of only 15 days we need at least 30 days free storage to facilitate the trade.
(ii) The existing Storage rent is higher than the other Ports. The Storage rate needs to be rationalized to be competitive.
(iii) Inadequate rakes supplied by SWR/MPA to AMPTPL.
-West Coast Paper Mills Ltd.
(i) Mr. Vivek Gupta of M/s. West Coast Paper Mills Ltd., attended the meeting and informed that, the free storage period is very less as compared to other neighbouring Ports. M/s. West Coast requested to increase the free period to 45 days.
(ii) Storage charges are very high as compared to other neighbouring Ports and requested to make it competitive.
-Goa Carbon Ltd.
(i) Mr. Ajay Prasad of M/s. Goa Carbon Ltd., attended the meeting and raised issue that, the storage plot rent is very high.
(ii) Free period for storage of cargo is less and should be competitive with other Ports. He informed that they have planned higher quantity i.e. 1,00,000 MT, this year, but due to high storage charges and less free period, they can handle less than 50,000 MT.
(iii) M/s. Goa Carbon requested to increase free period from 15 to 30 days.
11.1. After going through the total information collected during the processing of the case, the following position emerges:
A. The request of the AMPTPL to increase free period from present 15 days to 25 days, as prescribed in the Upfront Tariff Guidelines 2008 for the year 2021-22 andrationalization of storage charges by increasing the free period from 15 days to 25 days for the year 2021-22 by treating the AMPTPL project as stressed project in pursuance of the MOS letter No. PD-13/1/2018-PPP cell dated 11 July, 2018 for stressed PPP project is in order.
B. A comparative position of storage schedule as per the upfront tariff approved by TAMP vide its Order dated 7 August, 2008, rate applicable as per SOR notified in the name of the AMPTPL vide Order dated 4 July, 2014 for the year 2021-22 after applicable automatic indexation announced by this Authority (i.e. compoundable indexation factor of 35.08% upto the year 2017-18 for the base year 1 January, 2008, annual indexation factor of 1.13% for the year 2020-21 and 0.33% for the year 2021-22) and rationalized storage charges proposed by AMPTPL by increasing the free period from existing 15 days to 25 days is tabulated below:
(Rate in Rs. per tonne per day or part thereof)
Sl. Particulars Storage Charges Storage Charges Storage Charges Storage Charges No. approved by in the SoR applicable for proposed by AMPTPL
applicable
Authority vide notified in the the year 2021-22 vide its letter dated Order dated name of AMPTPL after applicable 16th April, 2023 07 August, 2008 vide Order dated indexation based on existing 04 July, 2014 after factor rate recommended for approval after indexation factor updating it with
applicable annual indexation factor for the year 2021-22 applicable from 1st April, 2021 till 31-03-2022
1 2 3 4 5 6
1. Storage Charges Nil Nil No charges No Charges. (0-15 days) OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 1 2 3 4 5 6 2. Storage Charges 12 15.79 17.22 No Charges. (16-20 days)
3. Storage Charges 24 31.58 34.43 No Charges. (21-25 days)
4. Storage Charges 48 63.16 68.87 2.95 (26-30 days)
Storage Charges
4.42 (31-35 days)
Storage Charges
5.91 (36th day onwards)
C. The AMPTPL had earlier sought from the MPA to increase free period from existing 15 days to 25 days citing the constraints of restricted dispatches of cargo due to probable traffic congestion, non- operational 4-lane connectivity and frequent restriction by GSPCB on movement of cargo. The Port then impressed upon the AMPTPL that, giving extra storage period would reduce the terminal turnaround time and increase the risk of customers using the terminal as storage yard area.
D. Recognizing that the proposal filed by the AMPTPL is based on the approval of the Board of Mormugao Port Authority and is also based on the MOS letter dated 11 July, 2018 on the Stressed Project for a period of one year i.e. 2021-22 and is intended to improve the utilization of the facility created, Board of Mormugao Port Authority may consider to approve the current proposal of the AMPTPL as per Para 6 of the MOS letter dated 11 July, 2018 which states that, the Concessioning Authority is to review the situation, periodically for optimum utilization of the facility created.
E. The Committee has proposed the rationalized storage schedule by increasing the free period from existing 15 days to 25 days, for one year for FY 2021-22 and has opined, that it will review the proposed rationalization after one year and shall approach Mormugao Port Authority.
F. The current proposal is for a period of one year i.e. FY 2021-22. Recognizing that the storage charge and the free period prescribed in the SOR notified in the name of the AMPTPL is for the entire project period of 30 years subject to annual escalation. Further, a note is prescribed that the rationalized storage schedule is applicable for period of one year i.e. year 2021-22 from 1 April, 2021 till 31 March, 2022 and that from 1 April, 2021 onwards, the original storage schedule as approved in the Order dated 4 July, 2014 with appropriate indexation rates shall apply.
G. This will tantamount to prescribing the rate with retrospective effect from 1 April, 2021 to 31 March, 2022. Since the proposal is an agreed proposal between the Port and the AMPTPL and is in pursuance of the MOS letter dated 11 July, 2018 for stressed PPP project, the Committee recommends Mormugao Port Authority to accord approval to the same with retrospective effect for the said one year period of 2021-22.
11.2 As brought out earlier, Para 6 of the MOS letter dated 11 July, 2018 on stressed PPP project which states, that whenever issue of abnormal storage charges emerges in stressed projects as defined in the said MOS letter, the Ports may approach TAMP under the provisions of "Amendments, modification or alternations" to the terms and conditions of the concession agreement with an appropriate proposal for rationalization of storage charges in consultation with concessionaires so as to achieve the ARR as per the relevant TAMP original tariff Order. The AMPTPL has filed the proposal increasing the free period from existing 15 days to 25 days and proposed that the rationalized storage charge for the third slab i.e. 26th to 30th day shall be at Rs. 2.95 per tonne per day, 31st to 35th day shall be Rs. 4.42 per tonne per day and from 36th day onwards Rs. 5.91 per tonne per day for the year 2021-22 under the stressed PPP project. The AMPTPL has stated that, though they have agreed to increase the free period from existing 15 days to 25 days, the rate of Rs. 68.87 per tonne per day beyond 25 days is very high, they have never been able to collect storage charges or recover any storage charges since inception till date, for the reason that the Storage Charges under the OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 Upfront Tariff and SOR are not commercially viable and if AMPTPL were to levy Storage Charges as per the SOR, the cargo handling business would simply move away from MPA to other competing ports. During the consultation process of this case, apart from AMPTPL, stakeholders/users also attended M/s. West Coast Paper Mills and M/s. Goa Carbon have also pointed out that, the proposed storage rate are on higher side as compared to other ports and have claimed that due to high storage charges, cargo is not coming to terminal.
The free period of storage of cargo is 15 days, which is too less as compared to other neighboring Ports where free period for storage of cargo is more as compared to Mormugao Port. M/s. Adani Enterprises Ltd. has not attended the joint hearing, but submitted their comments through letter.
11.3 Incidentally, the AMPTPL in their proposal dated 21-10-2022 has given calculation for storage charge based on certain assumptions of dwell time of cargo, cargo evacuation slab wise so as to achieve the ARR of Rs. 85.28 lakhs estimated in the original tariff Order of August 2008. None of the other users have objected to the same. That being so, and as pointed out by the users and AMPTPL that the existing storage charges of Rs. 68.87 per tonne is high, the Committee proposes to recommend the proposed rationalized storage charge for three slabs after 25 days free period viz. 26-30 days, 31-35 days and 36th day onwards as proposed by AMPTPL based on the calculation of the AMPTPL for the rationalizing storage charge to address the objection raised by the users and AMPTPL for the year 2021-22.
11.4. In the result, and for the reasons given above, and based on a collective application of mind, Mormugao Port Authority (MPA) approves the following:
I) Storage charge applicable as per existing Schedule 4 in the Order No. TAMP/13/2014-MPA dated 4 July, 2014 passed by TAMP notifying the SOR in the name of the AMPTPL is replaced with the following schedule for the year 2021-22 i.e. from 1 April, 2021 till 31 March, 2022:
Rate in Rs. Per Ton or Part Thereof
Sl. Storage Existing Storage Proposed Storage Royalty payable as No. Days Charges applicable Charges from per MOS letter
for the year 01-04-2021 till 31-03-2022 No. PD-13/1/2018-PPP 2021-22 after applicable Cell dated 11 July, 2018
indexation
and as given by MPA for the year 2021-22
1 2 3 4
5
1. Storage Charges Nil No charges Nil.
(0-15 days)
(16-20 days)
2. Storage Charges 17.22 No charges 1% of ARR from Storage charges at Rs. 85.28 lakhs estimated in August 2008 Order and after applicable indexation.
(21-25 days)
3. Storage Charges 34.44 No charges 1% of ARR from Storage charges i.e. Rs. 85.28 lakhs estimated in August 2008 Order and after applicable indexation.
(26-30 days)
5. Storage Charges
(31-35 days)
4. Storage Charges 68.87 2.95 20% of actual storage charges recovered or 1% of ARR from Storage charges i.e. 4.42 Rs. 85.28 lakhs as per Order dated 07-08-2008 after indexation, whichever is 6. Storage Charges
5.91 higher.
(36th day onwards)
(i) Twenty five free days shall be allowed, after complete discharge of vessel's cargo. For the purpose of calculation of free period, customs notified holidays and Terminal's non-working days shall be excluded.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023(ii) Storage charges shall be payable for all days including Terminal's non-working days and customs notified holidays for stay of cargo beyond the prescribed free days.
(iii) Storage charge on cargo shall not accrue for the period when the terminal operator is not in a position to deliver/ship the cargo when requested by the user due to reasons attributable to the terminal operator.
(iv) The above storage schedule shall be valid for a period of one year of 2021-22 i.e. from 1 April, 2021 till 31 March, 2022. From 1 April, 2022 onwards, the original storage schedule as approved in the Order dated 4 July, 2014 with appropriate indexation rates shall apply.
(v) The AMPTPL has full flexibility as regards extending higher free period than the prescribed level.
As regards revenue share payable by the BOT operator to the port, the MOS letter dated 11 July, 2018 on stressed PPP project prescribes the mechanism for payment of revenue share when the storage charge is rationalised i.e. reduced or free period is increased for stressed PPP project. The principle enumerated in the said letter is that the BOT operator shall pay revenue share at the agreed rate (i.e. 20% revenue share) as per the Concession Agreement on the actual revenue from storage charge or revenue share calculated on the ARR from the storage charge estimated in the original Order (i.e. Rs. 85.28 lakhs) after applying applicable annual indexation, whichever is higher.
The proposal for rationalization of storage charge in the Order No. TAMP/13/2014-MPA dated 4 July, 2014 for a period of one year of 2021-22 is treated as disposed of. Further, the representation of Adani Murmugao Port Terminal Pvt. Ltd. (AMPTPL) dated 20-07-2021 and proposal dated 21-10-2022 and dated 16-04-2023 on the same matter are also treated as disposed of.
Sd/- Chairperson of the Board of Mormugao Port Authority.
V. No. AP-542/2023.
——————
Department of Personnel
–––
Order
No. 7/29/2023-PER/3341
The Governor of Goa is pleased to appoint Shri Sanjay Goel, IAS (AGMUT:2004), as Commissioner-cum- -Secretary to Government, with immediate effect.
Shri Sanjay Goel, IAS joined this administration on 01-08-2023 (f.n.).
By order and in the name of the Governor of Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 9th August, 2023.
————
Order
No. 15/2/2020-PER/3383
On the recommendations of Goa Services Board, the Governor of Goa is pleased to transfer the following Officers in the cadre of Mamlatdar/Joint Mamlatdar/Vigilance Officer, in public interest, with immediate effect:
Sr. No. Name Present posting Posted as 1 2
3
4
1. Shri Ranjeet Salgaonkar Mamlatdar, Mormugao Jt. Mamlatdar-I, Tiswadi.
2. Shri Dattaprasad S. Toraskar Awaiting posting Jt. Mamlatdar-III, Tiswadi.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 20231 2
3
4
3. Shri Jeetendra Bugde Mamlatdar in Collectorate, Jt. Mamlatdar-I, Bardez.
South-I with addl. charge of
Mamlatdar in Collectorate,
South-II
4. Shri Shailendra Dessai Jt. Mamlatdar-I, Tiswadi Jt. Mamlatdar-V, Bardez.
5. Smt. Jennifer Fernandes Vigilance Officer-I Jt. Mamlatdar-VI, Bardez.
6. Shri Abhijit G. Gaonkar Awaiting posting Jt. Mamlatdar-I, Bicholim.
7. Shri Vishnu M. Rane Awaiting posting Jt. Mamlatdar-I, Sattari.
8. Shri Saiesh Naik Jt. Mamlatdar-VI, Bardez Mamlatdar, Ponda.
9. Shri Rosario Carvalho Jt. Mamlatdar-I, Mormugao Jt. Mamlatdar-I, Ponda.
10. Shri Rajesh Sakhalkar Jt. Mamlatdar-I, Ponda Jt. Mamlatdar-II, Ponda.
11. Kum. Ruchika Swapnil Birje Awaiting posting Jt. Mamlatdar-III, Ponda.
12. Shri Vimod Dalal Mamlatdar, Ponda Jt. Mamlatdar-II, Salcete.
13. Kum. Shannon Chika De Almeida Awaiting posting Jt. Mamlatdar-III, Salcete.
14. Smt. Ana Rita Maria Paes Jt. Mamlatdar-II, Salcete Jt. Mamlatdar-IV, Salcete.
15. Shri Gajanan A. Halarnekar Awaiting posting Jt. Mamlatdar-V, Salcete.
16. Shri Sidharth A. Prabhu Awaiting posting Jt. Mamlatdar-VII, Salcete.
17. Smt. Seema Gudekar Jt. Mamlatdar-I, Sanguem Mamlatdar in Collectorate,
with addl. charge of South-I.
Jt. Mamlatdar-II, Sanguem
18. Shri Pravinjay Pandit Jt. Mamlatdar-IV, Salcete Mamlatdar, Mormugao.
with addl. charge of
Jt. Mamlatdar-V, Salcete
19. Shri Nathan Afonso Jt. Mamlatdar-I, Quepem Jt. Mamlatdar-I, Mormugao. with addl. charge of Jt. Mamlatdar-II, Quepem
20. Kum. Shruti S. Kumtekar Awaiting posting Jt. Mamlatdar-II, Mormugao.
21. Shri Gajesh P. Shirodkar Awaiting posting Jt. Mamlatdar-III, Mormugao.
22. Kum. Dayle Rebello Awaiting posting Jt. Mamlatdar-I, Quepem
with addl. charge of Jt. Mamlatdar-II, Quepem.
23. Smt. Janavi Kalekar Jt. Mamlatdar-II, Ponda Jt. Mamlatdar-I, Sanguem
with addl. charge of with addl. charge of Jt. Mamlatdar-III, Ponda Jt. Mamlatdar-II, Sanguem.
24. Smt. Akshaya Amonkar Jt. Mamlatdar-I, Bicholim Mamlatdar in Collectorate-
-North.
25. Smt. Archana Chodankar Mamlatdar in Collectorate- Vigilance Officer-I.
North
Shri Anant Malik, Mamlatdar, Pernem shall hold the charge of Chief Officer, Pernem Municipal Council, in addition to his own duties.
The officers shall complete handing over and taking over process with immediate effect and submit compliance.
By order and in the name of the Governor of Goa.
Eshant V. Sawant, Under Secretary (Personnel-I)
Porvorim, 11th August, 2023.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023Order
No. 7/30/2023-PER/3385
The Governor of Goa is pleased to appoint Ms. Ankita Mishra, IAS (AGMUT:2018), as Special Secretary to Government, with immediate effect.
Ms. Ankita Mishra, IAS, joined this administration on 03-08-2023 (f.n.). She is allowed joining time from 01-08-2023 to 02-08-2023.
Ms. Ankita Mishra, IAS, shall draw pay and allowances with effect from 01-08-2023 (f.n.) against the post of "Central Deputation Reserve".
By order and in the name of the Governor of
Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 14th August, 2023.
————
Order
No. 15/2/2020-PER/3391
Read: Order No. 15/2/2020-PER/3383 dated
11-08-2023.
In partial modification of the Order read in the preamble, the following officers in the cadre of Mamlatdar/Joint Mamlatdar/Vigilance Officer are transferred and posted as below with immediate effect:
Sr. Name of the Posted No. Officer as
1. Shri Rajesh Sakhalkar Mamlatdar, Ponda.
2. Smt. Jennifer Fernandes Joint Mamlatdar-II,
Ponda.
3. Shri Saiesh Naik Joint Mamlatdar-VI,
Bardez.
This issues on the recommendation of the Goa
Services Board.
By order and in the name of the Governor of
Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 14th August, 2023.
————
Order
No. 13/07/2023-PER/3401
Whereas, Government vide Order No. 13/07/2023- PER/1250 dated 27-04-2023 had granted extension in service to Shri Anil Naik, Block Development Officer in the Directorate of Panchayats beyond the date of his superannuation for a period of one year w.e.f. 01-05-2023 or till the posts of Block Development Officers are filled on regular basis, whichever is earlier, in public interest, subject to Vigilance clearance, concurrence of Finance Department and approval of Council of Ministers;
And whereas, the Vigilance Department has submitted Vigilance Clearance stating that, no Disciplinary Proceedings/Vigilance cases are pending or being contemplated against Shri Anil Naik;
And whereas, the Finance Department vide its
U.O. No. 1400093600 dated 14-07-2023 concurred the
proposal for grant of extension in service to
Shri Anil Naik, Block Development Officer in the
Directorate of Panchayats subject to Cabinet
approval and adherence of all Rules in force;
And whereas, the Council of Ministers in its
XXIXth meeting held on 09-08-2023 resolved to grant
ex-post facto approval for extension in service to
Shri Anil Naik, Block Development Officer in the
Directorate of Panchayats beyond the date of his
superannuation for a period of one year w.e.f.
01-05-2023 or till the posts of Block Development
Officers are filled on regular basis, whichever is
earlier, in public interest;
Now, therefore, the Government is pleased to
confirm the Order No. 13/07/2023-PER/1250 dated
27-04-2023 granting extension in service to Shri Anil
Naik, Block Development Officer in the Directorate
of Panchayats beyond the date of his superannuation
for a period of one year w.e.f. 01-05-2023 or till the
posts of Block Development Officers are filled on
regular basis, whichever is earlier, in public interest.
By order and in the name of the Governor of
Goa.
Nathine S. Araujo, Under Secretary (Personnel-II).
Porvorim, 16th August, 2023.
————
Notification
No. 7/17/2022-PER/3388
Read: 1. Notification N o . 7/17/2022-PER/4036
dated 05-12-2022.
2. Notification No. 7/27/2022-PER/781
dated 21-03-2023.
3. Notification No. 7/17/2022-PER/1100
dated 18-04-2023.
In partial modification to the Notifications read in the preamble, the Governor of Goa is pleased to OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 order allocation of work/Departments amongst the
following Secretaries to the Government, with
immediate effect:-
Sr. Name & Departments
No. Designation
1 2 3
1. Shri Sanjay Goel, 1. General Administration.
IAS (2004) 2. Tourism.
Secretary (General 3. Information Technology.
Administration) 4. CEO, Goa CSR Authority.
5. PPP.
2. Shri Sanjeev Ahuja, 1. Resident Commissioner,
IAS (2008) Goa Sadan.
Resident Commissioner
3. Shri Sandip Jacques, 1. Revenue.
IAS (2009) 2. Law & Judiciary and
Secretary (Revenue) Legislative Affairs.
3. Labour & Employment.
4. Co-operation.
1 2 3
4. Ms. Ankita Mishra, 1. Special Secretary IAS (2018) (Revenue). Special Secretary (Revenue)
By order and in the name of the Governor of Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 14th August, 2023.
————
Corrigendum
No. 5/2/2023-PER/3414
Read: 1) Order No. 5/2/2023-PER/3355 dated 10-08-2023.
The name of officer at Sr. No. 10 in the Order read in preamble shall be corrected to read as "Ratnakant Dinraj Govenker" instead of "Ratnakant Dinraj Govenkar".
By order and in the name of the Governor of Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 17th August, 2023.
——————
Department of Skill Development and Entrepreneurship
Directorate of Skill Development and Entrepreneurship
CMKPS Section
–––
Order
No. DSDE/CMKPS/2023/Monitoring Committee/03/1532
The Government is pleased to constitute the Monitoring Committee of Chief Minister's Kaushalya Path Scheme (CMKPS) under the Chairmanship of the Director of Skill Development & Entrepreneurship and consisting of the following members:
1. Director, Skill Development & Entrepreneurship, Directorate of Skill — Chairman.
Development & Entrepreneurship, 3rd Floor, Shramashakti Bhavan, Panaji-Goa
2. Deputy Director (DSDE), Directorate of Skill Development — Vice-Chairman.
& Entrepreneurship
3. Asst. Director (DSDE), Directorate of Skill Development — Member Secretary.
& Entrepreneurship
4. Member Secretary of (HRDF), Directorate of Skill Development — Member.
& Entrepreneurship
5. Assistant Accounts Officer (DSDE), Directorate of Skill Development — Member.
& Entrepreneurship
6. Senior most Principal of ITI, Directorate of Skill Development — Member.
& Entrepreneurship
7. Representative of Industrial Association (3 Nos.) OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023 a) Shri Kiran Ballikar, Director, Goa Chamber of Commerce & Industry — Member.
(GCCI), Narayan Rajaram Bandekar Bhavan, T.B. Cunha Road, P. O. Box 59, Panaji, Goa, India 403001
b) Shri Narainrao Dessai, Goa State Industries Association (GSIA), — Member. 4th Floor, Goa IDC House, Patto Plaza, Panaji-Goa, 403001
c) Shri Ryan Vaz, Business Networking International (BNI) Goa Region, — Member. 1st Floor, B.R. Commercial Centre, Opp. Parade Ground, above Tata Motors, Campal, Panaji-Goa 403001
The tenure of the Monitoring Committee shall be for a period of 3 years with effect from the date of issue of this order. The role, responsibilities and functions of the Committee are as published in Government Gazette vide Notification No. DSDE/Proj/598/CMKPS/2022-23 dated 2nd March, 2023.
This issues with the approval of the Government.
By order and in the name of the Governor of Goa.
S. S. Gaonkar, Director (Skill Development & Entrepreneurship).
Panaji, 18th August, 2023.
——————
Department of Sports and Youth Affairs
Directorate of Sports and Youth Affairs
–––
Order
No. 8/10/PROMOTION/GPSC/DSYA/1698
On recommendation of Goa Public Service Commission conveyed vide their letter No. COM/II/ /11/45(1)/2020/207 dated 31-07-2023, Government is pleased to promote the below mentioned Asstt. Physical Education Officers in the Directorate of Sports & Youth Affairs to the post of Asstt. Director (Group 'B' Gazetted) as shown against their names on regular basis with immediate effect.
Sr. Name of the Pay Scale Name of the post Budget Head No. Officer
against which promoted
1 2 3 4 5
1. Smt. Neelam Mayekar (ST) Rs. 9300-34,800+GP Asstt. Director Demand No. 42
Rs. 5400 (Level-9 of (Projects) 2204—Sports & Youth the 7th CPC)
Services;
00—; 101—Physical
Education; 04—Directorate of Sports; 01—Salaries.
2. Shri John Fernandes Rs. 9300-34,800+GP Asstt. Director Demand No. 42
Rs. 5400 (Level-9 of (Sports) 2204—Sports & Youth the 7th CPC)
Services; 00—;
101—Physical
Education; 05—Strengthening of Physical Education; 01—Salaries.
They shall draw their salaries against the above mentioned Budget Head.
They shall be on probation for a period of two years and shall be governed by existing rules in force.
By order and in the name of the Governor of Goa.
Arvind Khutkar, Director (Sports & Youth Affairs)/ex officio Joint Secretary.
Panaji, 17th August, 2023.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023Department of Town & Country Planning
–––
Notification
No. 36/18/56/RPG-21/Bambolim/6/8/TCP/2023/232
Whereas, the Department is in receipt of an application dated 11-04-2023 (hereinafter referred to as the "said Application") under sub-section (2) of Section 17 of the Goa Town and Country Planning Act, 1974 (Act 21 of 1975) (hereinafter referred to as the "said Act") for correction of inconsistent/ /incoherent zoning provisions in the Regional Plan for Goa-2021 (RPG-2021) in respect of plot of land admeasuring an area of 2775 m2, surveyed under Survey No. 6, sub-division No. 8 of Village Bambolim, Tiswadi Taluka, District North Goa, State of Goa (hereinafter referred to as the "said plot of land");
And whereas, the correction/rectification as requested by the applicant has been scrutinized and a Report of the Department alongwith the report from a registered professional was submitted to the Government for decision (hereinafter referred to as the "said Reports");
And whereas, the Government has considered the said Reports and it is of the opinion that alteration/modification is necessary to be carried out to the RPG-2021 for the purpose of rectifying inadvertent/inconsistent/incoherent error zoning that has occurred in the RPG-2021 and it has directed the Chief Town Planner (Planning) to carry out alteration/modification to the RPG-2021 for the purpose of correcting/rectifying the zone of part of the plot of land surveyed under Survey No. 6, sub-division No. 8 of Village Bambolim, Tiswadi Taluka admeasuring an area of 485 m2, only which is earmarked as Natural Cover as per RPG-2021, to Settlement zone by issuing Notification under sub-section (2) of Section 17 of the said Act;
Now, therefore, as directed by the Government and in pursuance of sub-section (2) of Section 17 of the Goa Town and Country Planning Act, 1974 (Act 21 of 1975), the following alteration/modification to the RPG-2021 is hereby carried out, namely:-
In the RPG-2021, the zone of part of the plot of land admeasuring an area of 485 m2, surveyed under Survey No. 6, sub-division No. 8, of Village Bambolim, Tiswadi Taluka, District North Goa, State of Goa which is earmarked as Natural Cover as per RPG-2021 is hereby corrected as Settlement Zone.
Vertika Dagur, Chief Town Planner (Land Use)/
(Administration/Planning).
Panaji, 23rd August, 2023.
Notification
No. 36/18/32/17(2)/RPG-21/150/15-I/TCP-2023/233
Whereas, the Department is in receipt of an application dated 10-04-2023 (hereinafter referred to as the "said Application") under sub-section (2)
of Section 17 of the Goa Town and Country Planning
Act, 1974 (Act 21 of 1975) (hereinafter referred to as
the "said Act") for correction of inconsistent/
/incoherent zoning provisions in the Regional Plan
for Goa-2021 (RPG-2021) in respect of plot of land
admeasuring an area of 253 m2, surveyed under
Survey No. 150, sub-division No. 15-I of Village Raia,
Salcete Taluka, District South Goa, State of Goa
(hereinafter referred to as the "said plot of land");
And whereas, the correction/rectification as
requested by the applicant has been scrutinized
and a Report of the Department alongwith the
report from a registered professional was submitted to the Government for decision (hereinafter referred to as the "said Reports");
And whereas, the Government has considered the said Reports and it is of the opinion that alteration/modification is necessary to be carried out to the RPG-2021 for the purpose of rectifying inadvertent/inconsistent/incoherent error zoning that has occurred in the RPG-2021 and it has
directed the Chief Town Planner (Planning) to carry
out alteration/modification to the RPG-2021 for the
purpose of correcting/rectifying the zone of plot of
land surveyed under Survey No. 150, sub-division
No. 15-I of Village Raia, Salcete Taluka admeasuring
an area of 253 m2 only which is earmarked as Paddy
Field as per RPG-2021, to Settlement zone by issuing
Notification under sub-section (2) of Section 17 of
the said Act;
Now, therefore, as directed by the Government
and in pursuance of sub-section (2) of Section 17 of
the Goa Town and Country Planning Act, 1974 (Act
21 of 1975), the following alteration/modification to
the RPG-2021 is hereby carried out, namely:-
In the RPG-2021, the zone of the plot of land
admeasuring an area of 253 m2, surveyed under
Survey No. 150, sub-division No. 15-I, of Village Raia,
Salcete Taluka, District South Goa, State of Goa
which is earmarked as Paddy Field as per RPG-2021
is hereby corrected as Settlement Zone.
Vertika Dagur, Chief Town Planner (Land Use)/
(Administration/Planning).
Panaji, 23rd August, 2023.
OFFICIAL GAZETTE — GOVT. OF GOA SERIES II No. 21 24TH AUGUST, 2023Notification
No. 36/18/71/Assagao/146/6/TCP/2023/234
Whereas, the Department is in receipt of an application dated 03-05-2023 (hereinafter referred to as the "said Application") under sub-section (2) of Section 17 of the Goa Town and Country Planning Act, 1974 (Act 21 of 1975) (hereinafter referred to as the "said Act") for correction of inconsistent/ /incoherent zoning provisions in the Regional Plan for Goa-2021 (RPG-2021) in respect of plot of land admeasuring an area of 900 m2, surveyed under Survey No. 146, sub-division No. 6 of Village Assagao, Bardez Taluka, District North Goa, State of Goa (hereinafter referred to as the "said plot of land");
And whereas, the correction/rectification as requested by the applicant has been scrutinized and a Report of the Department alongwith the report from a registered professional was submitted to the Government for decision (hereinafter referred to as the "said Reports");
And whereas, the Government has considered the said Reports and it is of the opinion that alteration/modification is necessary to be carried out to the RPG-2021 for the purpose of rectifying inadvertent/inconsistent/incoherent error zoning that has occurred in the RPG-2021 and it has directed the Chief Town Planner (Planning) to carry out alteration/modification to the RPG-2021 for the purpose of correcting/rectifying the zone of plot of land surveyed under Survey No. 146, sub-division No. 6 of Village Assagao, Bardez Taluka admeasuring an area of 900 m2 only which is earmarked as Natural Cover as per RPG-2021, to Settlement zone by issuing Notification under sub-section (2) of Section 17 of the said Act;
Now, therefore, as directed by the Government and in pursuance of sub-section (2) of Section 17 of the Goa Town and Country Planning Act, 1974 (Act 21 of 1975), the following alteration/modification to the RPG-2021 is hereby carried out, namely:-
In the RPG-2021, the zone of part of the plot of land admeasuring an area of 900 m2, surveyed under Survey No. 146, sub-division No. 6, of Village Assagao, Bardez Taluka, District North Goa, State of Goa which is earmarked as Natural Cover as per RPG-2021 is hereby corrected as Settlement zone.
Vertika Dagur, Chief Town Planner (Land Use)/
(Administration/Planning).
Panaji, 23rd August, 2023.
——————
Department of Transport
Directorate of Transport
–––
Order
No. D.Tpt/EST/244/Addl.D.T./Part File-I/2023/2301
On the recommendation of the Goa Public Service Commission, Panaji conveyed vide their letter No. COM/II/11/49(1)/2006/232 dated 10-08-2023, the Government is pleased to promote Shri Sandeep B. Dessai, Assistant Director of Transport to the post of Additional Director of Transport (Group 'A' Gazetted) in the Pay Matrix Level 10 of the 7th Pay Commission on regular basis with immediate effect and post him as Additional Director of Transport, South, Margao-Goa.
The said Officer shall be on probation for a period
of two years.
Consequently, the Assistant Director of Transport, Dharbandora (1st Link Officer) as per Order No. D.Tpt/EST/2645/2019/3198 dated 13-09-2019, shall hold 'additional charge' as Assistant Director of Transport, Ponda in addition to his duties until further orders.
By order and in the name of the Governor of
Goa.
Rajan Satardekar, Director and ex officio Addl.
Secretary (Transport).
Panaji, 18th August, 2023.
www.goaprintingpress.gov.in
Published and Printed by the Director, Printing & Stationery, Government Printing Press, Mahatma Gandhi Road, Panaji-Goa 403 001.
PRICE–Rs. 50.00
PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—188/80—08/2023.