Servants of Knowledge
Andhra Pradesh Gazette · Government of Andhra Pradesh

Water Resources Department – CHLIS-Package.IV - Detailed Design and Construction of Additional Pump House-2a, Associated Civil, Hydro-Mechanical, Electro-Mechanical, Pressure Main, Sub-Staion, DC Transmission line works including Preparation of LP schedules and other Accessories complete for Drawl and Lifting of Water in Stage-II (+33.000 to +125.00 Contour) from Leading Channel to Km 0.000 of Main Canal from Guddigudem(V) West Godavari District and Construction of Pumphouse-3a and auxiliary works etc., in Stage-III (+115.000 to +146.000) for Jalleru Reservoir and excavation of Main Canal from Km 68.000 to Cross Regulator at Km 117.000 of 21 st Branch Canal of NSLBC including CM & CD works and formation of link canals to Medium Reservoirs including Operation and Maintenance of the system etc., complete of Chintalapudi Lift Irrigation Scheme for Providing Irrigation facilities in W.G. Dt., and Krishna Districts - Transfer of Assets of 400/220 kV Substation at Guddigudem

Published 17 January 2023

Department
WATER RESOURCES
Type
Extraordinary
Gazette no.
58
Part
PART I
Notification no.
1-(2022-2023)
Identifier
in.gazette.andhra.2023-01-17.17806
Languages
English, Telugu
Alternate rendering. This is a direct page-by-page conversion of the PDF. It preserves the printed layout but not the document's structure, and it is not part of the search index — the gazette text view is the one to read and cite.