2, 05/02/2019/74

1 2) 1

1-13) 2

1 03.07.2018 16 2,2 ( 2. 2)

28.02.2019 1 1 Annexure-1 )

3. 2 , 5.510MLD WTPGLSR

Network Coverage Water Pressure

, Distribution Network

4.

2050 Network Design,

GLSR 2 76079

5. ,

Service Level Benchmarks

24X7

6.

Model Bid Document 7. 0

National Open Competitive Bidding

8. 36

9.

SN Components Details
1 Source Maithon Dam
Damodar River
2 Water Treatment Plant 5.5 MLD WTP at Kandra
10 MLD WTP at Bhelatand
3 Ground level Service Reservoir (GLSR) – 1 No. 8600 KL
4 House service connections with meters 76,079 Nos
5 Raw Water Rising main 45.98 Kms
6 Clear Water Rising main 6.93 Kms
7 Distribution Network 530.62 Kms.
8 SCADA (Supervisory Control and Data Acquisition) Up to GLSR outlets.
( 3

10. NJS Engineer India Pvt. Ltd., Pune DPR ,

SN Item Description Total Amount in INR.
A CAPITAL COST
1 Estimate of New Intake Well at Maithon (77 MLD) 327,664,850.55
2 Estimate of Electrical & Mechanical Components at New Intake Well Near Maithon Dam 98,830,535.79
3 Estimate of Raw Water Rising Main from Maithon to Bhelatand WTP 1,011,107,575.00
4 Estimate of new WTP of 5.5 MLD capacity at Kandra with additional Clear Water Storage of 500 KL 19,515,357.00
5 Estimate of Electrical & Mechanical Components at Kandra WTP 7,890,413.53
6 Estimate of new WTP of 10 MLD at Bhelatand with additional Clear Water Storage of 1400 KL 32,513,070.10
7 Estimate of Electrical & Mechanical Components at Bhelatand WTP 28,278,974.45
8 Estimate of Clear Water Rising Main to Feed New GLSR at Dhangi Hill 124,373,914.00
9 Estimate of New GLSR at Dhangi Hill 16,946,357.00
10 Estimate of Distribution System (28 Zones) 1,077,108,162.00
Zone - 7, 8, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 36, 39, 40, 41, 42, 43, 44, 68, 69, 70, 71 & 72
11 Estimate of NH-32 Crossing at 5 locations 3,637,924.00
12 Estimate of Railway Crossing at 3 locations 15,703,057.00
13 Estimate of River Crossing at 8 locations 28,081,216.66
14 House Service Connection with meter (76079 nos.) 352,626,165.00
15 Compound Wall with Gate for 1 no. of Proposed GLSR 1,057,316.00
16 Approach Road GLSR at Dhangi Hill (1310 m) 10,291,799.00
17 Instrumentation, Control & Automation (ICA) for SCADA 224,169,196.20
18 EMP and Environmental Monitoring 1,090,100.00
19 Demolition of existing defunct structures within Proposed GLSR plot at Dhangi Hill 163,021.04
20 Total Capital Cost in INR:- (A) 3,381,049,004.32
21 Total Capital Cost Including GST @ 12% (1.12*A):- (A1) 3,786,774,884.84
22 Total Capital Cost Including Labour Cess @ 1% on (A1):- (A2) 3,824,642,633.69
B OTHER CHARGES, FEES & PROVISIONAL COSTS
23 JUIDCO Charges as per circular dt. 14.12.16 on (A1) 79867749.00
24 DPR Consultancy Charges @ 0.97% on (A1) 36731716.00
25 PMC Charges @ 2.06% on (A1) 78007563.00
26 Provision of Cost for Railway Crossing - Railway Fees 9000000.00
27 Provision of Cost for NH Road Crossing - NH Fees 10000000.00
28 Provision of Cost for Land Acquisition / Right of Way / Right of Use - For laying 1000 mm dia Raw Water Rising Main from Maithon to Bhelatand WTP 231511857.92
Provision for Instrumentation Control and Automation at Existing Jamadoba WTP (143 MLD) and Jamunia (10MLD) 49973577.80
29 Total Charges Cost in INR:- (B) 495,092,463.72
30 Total Capex (C =A2+B) 4,319,735,097.41
D 5 YEARS EXPENDUTURE IN OPERATION & MAINTENANCE
31 Operation And Maintenance for 1st Year excluding annual repair charges. 222348130.69
32 Operation And Maintenance for 2nd Year (As per item No. 1+10% of item No. 1 ) Including annual repair charges 260060484.54
33 Operation And Maintenance for 3rd Year (As per item No. 2+10% of item No.2) 286066532.99
34 Operation And Maintenance for 4th Year (As per item No. 3+10% of item No.3 ) 314673186.29
35 Operation And Maintenance for 5th Year (As per item No. 4+10% of item No.4 ) 346140504.90
36 Operation And Maintenance of SCADA for 5 Years 20,305,132.50
37 Proposed WTP's Sludge Analysis & Disposal for 5 year O & M Period 3,288,152.90
38 Total O&M for 5 years:- (D) 1,452,882,125.00
39 Electricity Charges for 5 years O&M:- (D0) 1252306907.00
40 O&M excluding electricity charges (D-D0):- (D1) 200,575,218.00
41 O&M Cost including GST @ 12% (D1*1.12):- (D2) 224644244.16
42 O&M Cost Including Labour Cess on (D2) @ 1% :- (D3) 226890686.60
43 Total O&M Cost for 5 years in INR (D = D0+D3):- 1479197593.60
D Total Project Cost in INR. (C+D) 5,798,932,691.01
44 Say 5798933000.00
4 ( ( 5

11. CAPEX 43197.355

OPEX14791.97 57989.33

12. Provisional Sum

1000 Raw Water Rising

RoW Main

13. , 2015

(DMFT)

(DMFT) , 2016 854, 07.12.2015 218, 23.03.2016 ,

(PMKKKY)

, ,

, ,

14. ,

357, 03.02.2017 (DMFT) (PMKKKY) ,

(DFMT)

15. 57989.33 0 DMFT

DMFT

8782Deposit Head

16.

17.

14 18.

SBD DMFT 19. 5

O&M Plan,6 ( ,

Water User Charges E- mail, SMS

20. 11.09.2019

DMFT

8782 Deposit Head

21. 11.09.2019 22

,( 7

Annexure-1

8 ( ( 9 10 (
---------

,

---------

Cite this issue. Jharkhand Gazette, Government of Jharkhand, 25 September 2019. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.gazette.jharkhand.2019-09-25.740/. Archive identifier in.gazette.jharkhand.2019-09-25.740.