Jharkhand Urban Water Supply Improvement Project

(JUWSIP) 16177.61

Juidco.Ltd./WS/Medininagar/2213/2019/281--

74 2 (

(ADB) Jharkhand Urban Water Supply Improvement Project (JUWSIP)

2. , Jharkhand Urban Water Supply Improvement Project (JUWSIP) ,

(DEA)21.11.201777 458

(ADB) 3. , ,

2011 (Handbook) Project Preparation & Loan Negotiations with Multilateral Development Banks (MDBs) 19

ADB Standard Bid Document

SBD

SBD

ADB

4.

5.

S.No Components Description
1 Source North Koel River
2 Intake Well Capacity 6 MLD
3 Raw Water Rising Main Raw water rising main, Dia 600 mm, length 170mtr.
4 WTP Capacity 21.6 MLD (to be Renovated & Repaired)
5 ESR ESR Capacity (in KL)
ESR 5 450
ESR 6 450
ESR 7 450
ESR 8 450
ESR 9 450

6.

Water Treatment Plant 5

Infiltration Gallery, Water Treatment Plant, 4 ESRs, Raw Water & Clear Water Rising Main Distribution Network

(DPR)( 3 7. ,

Service Level Benchmarks

8.

Proposed Project components Details
Infiltration Gallery 4500m 0.5m dia perforated pipes
Raw Water Rising Main (DI- K9) 600 mm Dia, 170 M Length & 500 Dia with 3900 M length.
Water Treatment plant 17 MLD (Proposed) & Renovation of Existing WTP of 21.6 MLD
ESRs (New Proposed ESR – 4 and Retaining Existing 5 No's) Capacity of 1275KL, 2000KL, 1125KL and 1275KL
National Highway Crossings and Ring Road Crossings Total- 12 nos.
Railway Crossing Nil
New house connection (Nos.) 24,711
Clear Water Rising mains DI K9 – 200 mm, 350mm, 450mm dia. – 5.2 Km (Total)
Water Distribution Network with DI K7 pipe Size Ranging from 100 mm dia. to 450 mm dia.–212.24 Km
O&M for project including Intake arrangements, WTP, ESRs, Raw & Clear Rising mains, Pumping Machinery, Electrical Equipment, Water Distribution network, SCADA system 5 Years

9. ,

Sl. Item Description Total Amount in Rs.
1 Sub-Estimate No. 1: Construction Infiltration Well cum Approach Bridge 28,912,962
2 Sub-Estimate No. 2: Construction of Infiltration Galleries 166,479,252
3 Sub-Estimate No. 3: Construction of Coffer Dam 5,149,000
4 Sub-Estimate No. 4: Construction of Raw Water Rising Main 43,588,012
5 Sub-Estimate No. 5: Construction of Raw Water Pumping Machinery 18,273,046
6 Sub-Estimate No. 6: Construction of Clear water rising main 41,986,196
7 Sub-Estimate No. 7: Construction of Clear Water Pumping Machineries 10,146,556
8 Sub-Estimate No. 8: Construction of WTP (17MLD) 37,607,131
9 Sub-Estimate No. 9: Repair and Renovation of existing WTP 2,178,700
10 Sub-Estimate No. 9.1: Construction of Twin staff quarter & Duty Room 2,311,236
11 Sub-Estimate No. 10: Construction of Elevated Storage Reservoirs (4No) 41,011,828
12 Sub-Estimate No. 11: Construction of Distribution System 538,714,688
13 Sub-Estimate No. 12: Construction of House Connections (24711No) 116,537,076
14 Sub-Estimate No. 14: Instrumentation control and Automation 48,548,160
15 Sub-Estimate No. 15: Construction of Boundary Wall 6,760,809
16 EMP (Environmental Management Plan) Cost 2,404,200
17 Sub-Estimate No. 15: Construction of Settling Tank 1,726,367
Sub-Total Capital Cost in INR - (A) 1,112,335,219.60
Capital Cost Including GST @ 12% (1.12*A) - (A1) 1,245,815,445.95
Total Capital Cost Including Labour Cess@ 1% (1.01*A1)-(A2) 1,258,273,600.40
18 JUIDCO Charges as per circular dt. 14.12.16 on (A1) 54,458,154
19 DPR Consultancy Charges @ 0.47% on (A1) 5,855,333
20 Provisional Sum@5 % on capex cost 55,616,761
21 Sub-Estimate No. 13: Provision for National Highway License Fee 10,000,000
22 PMC Charges @ 1.12% on (A1) 13,953,133
5 YEARS EXPENDUTURE IN OPERATION & MAINTENANCE Total Capax 139,81,56,981
1 Operation And Maintenance for 1st Year excluding annual repair charges. 31,886,333
2 Operation And Maintenance for 2nd Year (As per item No. 1+10% of item No. 1 41,656,956
3 Operation And Maintenance for 3rd Year (As per item No. 2+10% of item No.2) 43,276,835
4 Operation And Maintenance for 4th Year (As per item No. 3+10% of item No.3) 45,058,702
5 Operation And Maintenance for 5th Year (As per item No. 4+10% of item No.4) 47,018,755
Total O&M for 5 years: - (B) 208,897,582
Electricity Charges for 5 years O&M: - (B0) 127,290,830
O&M excluding electricity charges (B-B0): - (B1) 81,606,752
O&M Cost including GST @ 12% (B1*1.12): - (B2) 91,399,563
O&M Cost Including Labour Cess on (B2) @ 1%: - (B3) 92,313,558
Total Opex for 5 years in INR (B0+B3): - (B4) 219,604,388
Total Cost (Capax + Opex) in INR. 1,617,761,367.85
Say 1,617,761,400.00
4 (

10. (CAPEX) 13981.57 5

(OPEX)2196.04 16177.61CAPEX70%

30% OPEX (ADB)

3(OPEX)2 5 ( 5 OPEXOPEX 70% 30%

OPEX2

5

ADB

ADB O&M Period Cover

O&M

11. (In Lakhs)

Approved Project Cost (CAPEX+OPEX) Part of JURLIP aided by ADB Non-JURLIP Part, to be paid by ULB
ADB Share (70%) State Share (30%)
CAPEX (A) 13981.57 9787.099 4194.471 -
OPEX (B) 2196.04 320.26 137.26 1738.52
Total Project Cost (A+B) 16177.61 10107.359 4331.731 1738.52

11 JUWSIP (ADB Share + State 12.

Share) 14439.09Non-JUWSIP 1738.52

''48,

2217- 80, 191-, 67-01-

22000572), 06-79 48S22178019167010679 '' 70%

13. (ADB) JUWSIP

14. Claim form CAAA

, (DEA)6 ( DEA

70% (AD Share) 15. (ADB) User's Guide to Procurement of works Section 4 – Biding Forms Bill of Quantities61-62

Provisional Sum , 16.

17. 30.12 MLD,

Infiltration GalleryLean PeriodAssured

,

18. ,

(National open competitive bidding)

19.

12 20. 9DPR 16177.61

, ,

21. 5 (O&M Plan),

,

(Water User Charges) (Email, SMS ) 22. 24( 7

1. 2021-22 4660.52
2. 2022-23 4660.52
3. 2023-24 4660.52

23. 5

1. 2023-24 439.21
2. 2024-25 439.21
3. 2025-26 439.21
4. 2026-27 439.21
5. 2027-28 439.21

24.

) (CAPEX) 13981.57

(OPEX)2196.04

16177.61 ) 3 Standard Bid Document

) 10 - 14

25. 19.01.202219

,