Servants of Knowledge
Rajasthan Extraordinary Gazette · Government of Rajasthan

Rajasthan Extraordinary Gazette, Part Part 7 (A), 05 August 2025

Published 05 August 2025

Department
Department of Energy
Type
Extraordinary
Part
Part 7 (A)
Notification no.
12(31)Energy/2024/02647
Category
Statutory Notification
Document Type
Statutory Notification /Order
Subdepartment
Department of Energy
Identifier
in.gazette.rajasthan_extraordinary.2025-08-05.5091208
Languages
English, Hindi

click here for IIIF manifest

राजस्‍थान राजपत्र वशिेष ांक RAJASTHAN GAZETTE Extraordinary
स धकि र प्रक शशत Published by Authority
श्रावण 14, मंगलवार, शाके 1947- अगस् त 05, 2025 Sravana 14, Tuesday, Saka 1947- August 05, 2025

भाग-7

ववभभन्न ववभाग म ्रदााों े भल े ्‍ र मांगन ेी सूचनाओं ेो सम्ममभलत ेरत हुों साववजनने और ननजी ववज्ञापन आदा। Energy Department Notfication Jaipur, July 23, 2025

Partial amendment in RoW compensation policy issued by Energy

Department, GoR on 08.11.2024

No.F.12(31)Energy/2024/02647 .-Partial amendment in policy regarding payment of crop compensation and compensation towards land use in regard to Right of Way (RoW) for installation of 132kV and above transmission lines in the state of Rajasthan" published by Department of Energy, Govt. of Rajasthan in Gazette of Rajasthan on dt. 08.11.2024 is hereby proposed in regard to installation of 400kV and above transmission lines asfollows:-

Pointno.II(4)isherebysubstitutedasunder:-

Tower Base compensation: Compensation for the tower base area shall be of 200% of the land value as per DLC rates and additional 200% compensation will be given for these lines due to more risk factor involved in these linesowing to induction effects due to strong electric and magnetic field generated by these lines. The tower basearea shall be the area enclosed by the four legs of the tower at ground level, plus an additional one (1) meter extension on each side.

Pointno.II(5)isherebysubstitutedasunder:-

RoW Corridor compensation: The compensation amount for Right-of- Way (RoW) corridor shall be as follows:-

i. 30% of the land value in rural areas.

ii. 45% of the land value for municipalities and all other urban planning areas notified by the State Government.

iii. 60% of the land value in municipal corporations and metropolitan areas notified by the State Government.

Land value will be calculated as per DLC rates. Land within the RoW corridor, as defined in Schedule VII of the Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022 (Annexure-A), shall be eligible for compensation. This compensation will address the potential diminution of land value due to the presence of overhead lines or underground cables within the RoW corridor. No construction activityofany kind would be permitted with in the RoWofthetransmissio nline.

This amendment shall be applicable for all implementing agencies (Transmission licensee) and for both Intra and Inter-State transmission lines. All other conditions of the policy will remain the same.

This amendment in the policy shall become effective from the date of publication of notification in Rajasthan Government Gazette.